{"id":73435,"date":"2019-11-14T04:30:00","date_gmt":"2019-11-14T04:30:00","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=73435"},"modified":"2019-11-14T04:06:25","modified_gmt":"2019-11-14T04:06:25","slug":"new-electricity-connection-lahore-islamabad","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html","title":{"rendered":"How to Apply for a New Electricity Connection in Lahore and Islamabad"},"content":{"rendered":"\n<p>Building a new house is not an easy task. Apart from the actual construction, which may take months or even years depending on the project, the property owner also needs to worry about acquiring required permits, getting building plans approved and obtaining no-objection certificates (NOC) from various authorities among other things. Then, once the construction phase is over, the owner needs to apply for a new electricity connection along with other utilities.&nbsp;<\/p>\n\n\n\n<p>So, if you are planning to move into a recently-constructed house, this guide on how to apply for a new electricity connection in Lahore and Islamabad, among other cities in Pakistan, will definitely help you out.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Electric Supply Companies in Pakistan<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"640\" src=\"https:\/\/www.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-1-10-1024x640.jpg\" alt=\"electric supply companies in Pakistan\" class=\"wp-image-73437\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-1-10-1024x640.jpg 1024w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-1-10-300x188.jpg 300w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-1-10-768x480.jpg 768w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-1-10-640x400.jpg 640w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-1-10.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>All of the electric supply companies in Pakistan operate under PEPCO<\/figcaption><\/figure>\n\n\n\n<p>Before discussing the procedure to get a new connection, let\u2019s take a look at the electric supply companies in Pakistan.<\/p>\n\n\n\n<p>Cities such as Lahore, Islamabad, Multan, Gujranwala, Sukkur, Quetta and Hyderabad, to name a few, are provided electricity by different branches of a government-owned distribution company (DISCO). It functions under Pakistan Electric Power Company (PEPCO). These distribution companies purchase electricity from PEPCO and Water and Power Development Authority (WAPDA) among other independent producers and supply it to their respective customers in allocated areas.<\/p>\n\n\n\n<p>Since electricity has become a basic need, these power supply companies have introduced an online application system to facilitate the consumers. The process requires applicants to submit an online application for electricity connection along with a physical form, which can be sent directly to their concerned office. <\/p>\n\n\n\n<p>Whether you live in Lahore or Islamabad, the procedure to apply for a new electricity connection is exactly the same for both cities, as well as a few others.<\/p>\n\n\n\n<p>Before we proceed any further, here is a list of government-owned electric supply companies in Pakistan:<\/p>\n\n\n\n<p><strong>LESCO:<\/strong> Lahore Electric Supply Company<\/p>\n\n\n\n<p><strong>IESCO:<\/strong> Islamabad Electric Supply Company<\/p>\n\n\n\n<p><strong>GEPCO:<\/strong> Gujranwala Electric Supply Company<\/p>\n\n\n\n<p><strong>FESCO:<\/strong> Faisalabad Electric Supply Company<\/p>\n\n\n\n<p><strong>MEPCO:<\/strong> Multan Electric Supply Company<\/p>\n\n\n\n<p><strong>PESCO:<\/strong> Peshawar Electric Supply Company<\/p>\n\n\n\n<p><strong>HESCO:<\/strong> Hyderabad Electric Supply Company<\/p>\n\n\n\n<p><strong>SEPCO:<\/strong> Sukkur Electric Supply Company<\/p>\n\n\n\n<p><strong>QESCO:<\/strong> Quetta Electric Supply Company<\/p>\n\n\n\n<p><strong>TESCO:<\/strong> Tribal Electric Supply Company<\/p>\n\n\n\n<p>It is important to mention that K-Electric in Karachi is not included in the list as it has been privatized. The residents of the \u2018City of Lights\u2019 need to follow a different process to apply for an electricity connection through their local distributor.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>How to Apply for a New Electricity Connection<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"640\" src=\"https:\/\/www.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-2-7-1024x640.jpg\" alt=\"how to get a new electricity connection in Lahore and Islamabad\" class=\"wp-image-73436\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-2-7-1024x640.jpg 1024w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-2-7-300x188.jpg 300w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-2-7-768x480.jpg 768w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-2-7-640x400.jpg 640w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/image-2-7.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Applying for a new electricity connection in Lahore and Islamabad, among other cities, is easier than you probably thought <\/figcaption><\/figure>\n\n\n\n<p>Here is a step-by-step guide on how to apply for a new electricity connection in Islamabad, Lahore and other cities through the above-mentioned distribution companies.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 1<\/strong><\/h3>\n\n\n\n<p>Visit the website of your respective DISCO and click the \u2018New Connection\u2019 tab. It\u2019ll lead you to the Electricity New Connection (ENC) System.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 2<\/strong><\/h3>\n\n\n\n<p>Click on \u2018Print Application\u2019 from the navigation panel, which will open up a new web page. You will now need to select your local power supply company and enter your CNIC number.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 3<\/strong><\/h3>\n\n\n\n<p>Applicants need to upload the scanned copies of the required documents on the online portal to apply for a new electricity connection in residential and commercial properties.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Attested copy of the applicant\u2019s CNIC.<\/li><li>Attested copies of CNIC of two witnesses (not needed for single-phase meters)<\/li><li>Proof of ownership or power of attorney in favour of the applicant (in case of more than one owners) attested by oath commissioner, notary public or a class one officer.&nbsp;<\/li><li>An affidavit stating that the property does not have an electricity connection and has no outstanding charges or fees. The undertaking must be submitted on a stamp paper duly attested by oath commissioner. In case the applicant is found to be a defaulter at a later stage, they may be liable to legal action.<\/li><li>Tenants can submit a No Objection Certificate (NOC) from the owner of the property. It must be on a stamp paper and duly signed by oath commissioner.<\/li><\/ul>\n\n\n\n<p>Please note that industrial applicants need to submit an additional list of documents.<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Applicant must provide a site map for the location where a new electricity connection is required.<\/li><li>If a company has more than one owner, a Power of Attorney will be required in favour of the applicant in order to file an application for new electricity connection and sign a contract with the respective electric supply company, be it LESCO, IESCO or another.<\/li><li>A copy of incorporation certificate (Article and Memorandum of Association) needs to be submitted by Limited and Private Limited companies.<\/li><li>Attested CNIC of copies all director along with their complete addresses.<\/li><li>The applicant must submit a NOC on company letterhead as per Form 29. It must be signed by all the directors.<\/li><li>A Charge Creation Certificate from the Security and Exchange Commission of Pakistan (SECP). Its worth will be equivalent to the security amount.<\/li><\/ul>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 4<\/strong><\/h3>\n\n\n\n<p>Submit the application for new electricity meter connection on the online portal.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 5<\/strong><\/h3>\n\n\n\n<p>Print out the application form, attach the above-mentioned documents and send it to your concerned office to apply for a new electricity connection.&nbsp;<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 6<\/strong><\/h3>\n\n\n\n<p>Once your local power supply company verifies your documents, you\u2019ll be issued a Demand Notice. However, if the documents are incomplete or deemed fake by the authorities, the application for new electricity meter connection will be rejected immediately.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 7<\/strong><\/h3>\n\n\n\n<p>You\u2019ll have to pay the Demand Notice in the designated bank and send its paid copy to the concerned office.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>STEP 8<\/strong><\/h3>\n\n\n\n<p>After verifying the payment, LESCO, IESCO or whichever DISCO provides electricity to your city, will install a new connection at your property.&nbsp;<\/p>\n\n\n\n<p>It is important to mention that streamlining the process of getting a new electricity connection is one of the regulatory reforms that helped Pakistan jump 28 spots to the global ranking of 108 on World Bank\u2019s Ease of Doing Business Index 2020.&nbsp;<\/p>\n\n\n\n<p>The latest report released by the World Bank evaluated economic regulations in 190 countries based on 12 metrics. The list included the ease of starting a business, dealing with construction permits, getting electricity, registering property and paying taxes among others. Owing to the effective process streamlining efforts by various government bodies, <a href=\"https:\/\/www.zameen.com\/blog\/doing-business-pakistan-reforms.html\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\">Pakistan is now among the top 10 most improved places to do business<\/a> in the world.<\/p>\n\n\n\n<p>Meanwhile, if you\u2019re looking for information on <a rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\" href=\"https:\/\/www.zameen.com\/blog\/tax-asaan-app-fbr.html\" target=\"_blank\">how to register your business with the Federal Board of Revenue<\/a> (FBR) or how to <a rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\" href=\"https:\/\/www.zameen.com\/blog\/file-income-tax-returns-for-businesses-pakistan.html\" target=\"_blank\">file your income taxes online<\/a>, stay connected to Zameen Blog \u2013 the<a rel=\"noreferrer noopener\" aria-label=\" leading real estate blog in Pakistan (opens in a new tab)\" href=\"http:\/\/zameen.com\/blog\/\" target=\"_blank\">leading real estate blog in Pakistan<\/a>.<\/p>\n\n\n\n<p>In case of any queries or suggestions regarding the topic, drop us an email at <a href=\"mailto:blog@zameen.com\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\">blog@zameen.com<\/a>. You can also subscribe to our newsletter on the right to receive the latest updates about the property sector of Pakistan.<br><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Building a new house is not an easy task. Apart from the actual construction, which may take months or even years depending on the project, the property owner also needs to worry about acquiring required permits, getting building plans approved and obtaining no-objection certificates (NOC) from various authorities among other things. Then, once the construction phase is over, the owner needs to apply for a new electricity connection along with other utilities.&nbsp; So, if you are planning to move into a recently-constructed house, this guide on how to apply for a new electricity connection in Lahore and Islamabad, among other cities in Pakistan, will definitely help you out. Electric Supply Companies in Pakistan Before discussing the procedure to get a new connection, let\u2019s take a look at the electric supply companies in Pakistan. Cities such as Lahore, Islamabad, Multan, Gujranwala, Sukkur, Quetta and Hyderabad, to name a few, are provided electricity by different branches of a government-owned distribution company (DISCO). It functions under Pakistan Electric Power Company (PEPCO). These distribution companies purchase electricity from PEPCO and Water and Power Development Authority (WAPDA) among other independent producers and supply it to their respective customers in allocated areas. Since electricity has become&hellip;<\/p>\n","protected":false},"author":81,"featured_media":73439,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[11053],"tags":[43217,43216,43190,43187,43185,43191,43189,43184,8133,43188,43219,43218,43186],"persona":[32425,32426],"class_list":{"0":"post-73435","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-laws-taxes","8":"tag-application-for-new-electricity-connection","9":"tag-application-for-new-electricity-meter-connection","10":"tag-apply-for-a-new-electricity-connection","11":"tag-apply-for-a-new-electricity-connection-in-islamabad","12":"tag-how-to-apply-for-a-new-electricity-connection","13":"tag-iesco","14":"tag-islamabad-electric-supply-company","15":"tag-lahore-electric-supply-company","16":"tag-lesco","17":"tag-new-electricity-connection-in-lahore","18":"tag-online-application-for-electricity-connection","19":"tag-online-new-connection-of-electricity","20":"tag-procedure-to-apply-for-a-new-electricity-connection","21":"persona-islamabad","22":"persona-lahore","23":"cat-11053-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Applying for a New Electricity Connection in Lahore &amp; Islamabad | Zameen Blog<\/title>\n<meta name=\"description\" content=\"Take a look at our step-by-step guide on how to apply for a new electricity connection in Lahore, Islamabad and a few other cities in Pakistan.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Guide to Applying For a New Electricity Connection in Lahore and Islamabad\" \/>\n<meta property=\"og:description\" content=\"Take a look at our step-by-step guide on how to apply for a new electricity connection in Lahore, Islamabad and a few other cities in Pakistan.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html\" \/>\n<meta property=\"og:site_name\" content=\"A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-14T04:30:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/cover-image-1-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"625\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Ramsha Sadiq\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Ramsha Sadiq\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"6 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Applying for a New Electricity Connection in Lahore & Islamabad | Zameen Blog","description":"Take a look at our step-by-step guide on how to apply for a new electricity connection in Lahore, Islamabad and a few other cities in Pakistan.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html","og_locale":"en_US","og_type":"article","og_title":"Guide to Applying For a New Electricity Connection in Lahore and Islamabad","og_description":"Take a look at our step-by-step guide on how to apply for a new electricity connection in Lahore, Islamabad and a few other cities in Pakistan.","og_url":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html","og_site_name":"A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-11-14T04:30:00+00:00","og_image":[{"width":1440,"height":625,"url":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/cover-image-1-1.jpg","type":"image\/jpeg"}],"author":"Ramsha Sadiq","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Ramsha Sadiq","Est. reading time":"6 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html"},"author":{"name":"Ramsha Sadiq","@id":"https:\/\/www.zameen.com\/blog\/#\/schema\/person\/6603c0ed15a6fca62ef1bb47f3ab7f39"},"headline":"How to Apply for a New Electricity Connection in Lahore and Islamabad","datePublished":"2019-11-14T04:30:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html"},"wordCount":1132,"image":{"@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#primaryimage"},"thumbnailUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/cover-image-1-1.jpg","keywords":["application for new electricity connection","application for new electricity meter connection","apply for a new electricity connection","apply for a new electricity connection in Islamabad","how to apply for a new electricity connection","IESCO","Islamabad Electric Supply Company","Lahore Electric Supply Company","LESCO","new electricity connection in Lahore","online application for electricity connection","online new connection of electricity","procedure to apply for a new electricity connection"],"articleSection":["Laws &amp; Taxes"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html","url":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html","name":"Applying for a New Electricity Connection in Lahore & Islamabad | Zameen Blog","isPartOf":{"@id":"https:\/\/www.zameen.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#primaryimage"},"thumbnailUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/cover-image-1-1.jpg","datePublished":"2019-11-14T04:30:00+00:00","author":{"@id":"https:\/\/www.zameen.com\/blog\/#\/schema\/person\/6603c0ed15a6fca62ef1bb47f3ab7f39"},"description":"Take a look at our step-by-step guide on how to apply for a new electricity connection in Lahore, Islamabad and a few other cities in Pakistan.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#primaryimage","url":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/cover-image-1-1.jpg","contentUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/11\/cover-image-1-1.jpg","width":1440,"height":625,"caption":"apply for a new electricity connection"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/blog\/new-electricity-connection-lahore-islamabad.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/blog"},{"@type":"ListItem","position":2,"name":"Laws &amp; Taxes","item":"https:\/\/www.zameen.com\/blog\/laws-taxes"},{"@type":"ListItem","position":3,"name":"How to Apply for a New Electricity Connection in Lahore and Islamabad"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/blog\/#website","url":"https:\/\/www.zameen.com\/blog\/","name":"A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.zameen.com\/blog\/#\/schema\/person\/6603c0ed15a6fca62ef1bb47f3ab7f39","name":"Ramsha Sadiq","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/03\/Ramsha-Sadiq-Khan-96x96.jpeg","url":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/03\/Ramsha-Sadiq-Khan-96x96.jpeg","contentUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/03\/Ramsha-Sadiq-Khan-96x96.jpeg","caption":"Ramsha Sadiq"},"description":"RS has a degree in Mass Communication and a passion for creative writing. When she is not working, you'll find her reading a comic book, browsing through Netflix, or planning her next travel adventure."}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts\/73435","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/users\/81"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/comments?post=73435"}],"version-history":[{"count":4,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts\/73435\/revisions"}],"predecessor-version":[{"id":73452,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts\/73435\/revisions\/73452"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/media\/73439"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/media?parent=73435"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/categories?post=73435"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/tags?post=73435"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/persona?post=73435"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}