{"id":98275,"date":"2020-09-01T12:37:41","date_gmt":"2020-09-01T12:37:41","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=98275"},"modified":"2020-09-01T12:37:42","modified_gmt":"2020-09-01T12:37:42","slug":"construction-cost-first-floor-10-marla-house","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html","title":{"rendered":"Cost of Constructing an Upper Storey of a 10 Marla House"},"content":{"rendered":"\n<p>In This Post:<br>&#8211; <a href=\"#grey-structure-cost\">Grey Structure Cost<\/a><br>&#8211; <a href=\"#finishing-cost\">Finishing Cost<\/a><\/p>\n\n\n\n<p>Most homeowners build the ground floor and start living in it until they gather enough financial resources to construct the upper storey of the house. It is, therefore, important to get a rough estimate of the finances required to build the first floor so that you know how much money you need to save for it. In this blog, we will provide you with the construction cost to build the first floor of a 10 marla house in Pakistan.<\/p>\n\n\n\n<p>So, without further ado, let\u2019s get started.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Construction Cost to Build the First Floor of a 10 Marla House in Pakistan<\/strong><\/h2>\n\n\n\n<p>If you do not know how much it would cost to build an upper floor in Pakistan, then take a look at our budget detailing the quantity of each construction material and the cost involved in the process. For your convenience, here is a breakdown of the construction cost to build an upper storey of a 10 marla house. The upper floor under consideration includes 3 bedrooms with an attached bathroom and a kitchen. The covered area of an upper floor comprises 1,550 sq ft with a 100 sq ft mumtee.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"grey-structure-cost\"><strong>Grey Structure Cost of Building another Storey of a 10 marla House in Pakistan<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"904\" height=\"900\" src=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House.jpg\" alt=\"grey structure cost to build the first floor of a 10 marla house\" class=\"wp-image-98298\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House.jpg 904w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-300x300.jpg 300w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-150x150.jpg 150w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-768x765.jpg 768w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-402x400.jpg 402w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-231x230.jpg 231w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-100x100.jpg 100w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-24x24.jpg 24w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-48x48.jpg 48w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Grey-Structure-Cost-to-Build-the-First-Floor-of-a-10-Marla-House-96x96.jpg 96w\" sizes=\"auto, (max-width: 904px) 100vw, 904px\" \/><figcaption>At a glance: Grey structure cost to build the first floor of a 10 marla house<\/figcaption><\/figure>\n\n\n\n<p>The first step is to lay the foundation of the upper storey. For that you need the same set of construction materials required to build a two floor residential unit. However, the quantity would differ. As shared in the infographic above, you would need bricks, sand, crush, rori, cement and rebar. Constructing the grey structure of an upper floor of a 10 marla house also involves installing electric and plumbing systems and safety grills.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Bricks, Sand, Crush &amp; Rori<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"640\" src=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09-1024x640.jpg\" alt=\"bricks in construction\" class=\"wp-image-98291\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09-1024x640.jpg 1024w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09-300x188.jpg 300w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09-768x480.jpg 768w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09-640x400.jpg 640w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09-368x230.jpg 368w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-B-01-09.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Bricks are used to construct the grey structure of the first floor of a house\n<\/figcaption><\/figure>\n\n\n\n<p>As of now, the rate of Awwal category of bricks has slightly increased. Earlier it was PKR 11.5 per brick for building an A category unit. Now, it is priced at PKR 12.5 per brick. To construct the first floor of a 10 marla unit, you would need approximately 35,000 bricks for a total sum of PKR 437,500.&nbsp;<\/p>\n\n\n\n<p>If you\u2019re using Ravi Sand, you\u2019d need 4,000 cubic feet at the rate of PKR 20\/c.ft.; this takes the total to PKR 80,000 for the upper floor. You would also need 500 c.ft of Chenab Sand, which is available for around PKR 35\/c.ft., which means you need to shell out PKR 17,500\u2014for plaster alone. <\/p>\n\n\n\n<p>You need 800 c.ft. Margalla crush to build the lintel of the house at the rate of PKR 75\/c.ft and 550 c.ft of Sargodha crush to construct the house\u2019s flooring at the rate of PKR 65\/c.ft.&nbsp;So, keep a budget of PKR 60,000 c.ft and PKR 35,750 for Margalla and Sargodha crush respectively. Laying down Rori requires you to spend PKR 16,000.<\/p>\n\n\n\n<p><strong>Cost of Bricks, Sand, Crush &amp; Rori =&nbsp;PKR 646,750<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Cement &amp; Rebar<\/strong><\/h3>\n\n\n\n<p>In order to calculate the construction cost to build the first floor of a 10 marla house, you must evaluate the number of cement bags you would need in the process. Around 375 cement bags are required at the cost of PKR 520 per bag. Be prepared to invest a sum of PKR 195,000 on cement bags. Rebar is a costly item when constructing a unit. For building a floor you would need 3 ton or 3,000 kg at a total cost of PKR 360,000.<\/p>\n\n\n\n<p><strong>Cost of Cement and Rebar =&nbsp;PKR 555,000<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Labour<\/strong><\/h3>\n\n\n\n<p>In order to carry out the construction of your house you need professional labourers. As of now, the cost of labour in 2020 is PKR 375 per sq ft, which means you need to keep a budget of PKR 618,750 for hiring labourers.<\/p>\n\n\n\n<p><strong>Labour Cost = PKR 618,750<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Plumbing &amp; Wiring<\/strong><\/h3>\n\n\n\n<p>When constructing the grey structure of an upper portion, the plumbing and electric wiring system is also included. Around PKR 60,000 would be spent in setting up the plumbing system around the house. Similarly, PKR 50,000 would be required in connecting electric wires on the top floor.<\/p>\n\n\n\n<p><strong>Cost of Plumbing &amp; Wiring =&nbsp;PKR 110,000<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Grill &amp; Chougat Steel<\/strong><\/h3>\n\n\n\n<p>Steel is used to strengthen the foundation of the first floor. To construct the first floor in an A category 10 marla house, you must use Chougat steel for the cost of PKR 31,500. The safety grills can be installed at the cost of 190\/sq ft for PKR 43,000.<\/p>\n\n\n\n<p><strong>Cost of Grill &amp; Chougat Steel =&nbsp;PKR 74,500<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>Others<\/strong><\/h3>\n\n\n\n<p>Bitumen membrane is used for waterproofing the roof of the house. If you are building the first floor, make sure waterproofing of the roof is properly done to avoid any leakage and seepage. Reserve a budget of PKR 110,000 for this. To construct a water tank you would need PKR 18,000.<\/p>\n\n\n\n<p><strong>Cost of Miscellaneous Items: PKR 128,000<\/strong><\/p>\n\n\n\n<p><strong>Total grey structure cost for building the first floor of a 10 marla house = PKR&nbsp;2,113000<\/strong><\/p>\n\n\n\n<h2 class=\"wp-block-heading\" id=\"finishing-cost\"><strong>Finishing Cost of Constructing another Storey of a 10 Marla House in Pakistan<\/strong><\/h2>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"727\" height=\"900\" src=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Finishing-Cost-2.jpg\" alt=\"finishing cost to build the first floor of a 10 marla house\" class=\"wp-image-98300\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Finishing-Cost-2.jpg 727w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Finishing-Cost-2-242x300.jpg 242w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Finishing-Cost-2-323x400.jpg 323w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Finishing-Cost-2-186x230.jpg 186w\" sizes=\"auto, (max-width: 727px) 100vw, 727px\" \/><figcaption>At a glance: Finishing cost to build the first floor of a 10 marla house in Pakistan\n<\/figcaption><\/figure>\n\n\n\n<p>The infographic above clearly shows that the finishing cost to build the first floor of a 10 marla house requires a lump sum budget of PKR 2,081,425. The finishing of a house includes installing bath tiles and bathroom fittings. There are many other tasks involved as well. For your convenience, here is a breakdown of the cost involved.<\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>TILES AND MARBLE<\/strong><\/h3>\n\n\n\n<p>Tiles have become a fairly popular flooring option. You have the option of installing good quality tiles at the rate of PKR 2,000 per sq mtr on the entire floor. This excludes the flooring cost for terrace and bathroom. The total cost of placing tiles on the first floor would be approximately PKR 270,000.<\/p>\n\n\n\n<p>For terrace, save a few bucks by using a PKR 1,500 per sq mtr tile at the cost of PKR 33,000. Invest in the bathroom tiles at a cost of PKR 135,000. The staircase connects the ground floor with the upper storey for which you would need to invest a sum of PKR 55,000. For the kitchen marble shelves reserve a budget of PKR 15,000. Keep PKR 95,000 for hiring labourers to do the job.<\/p>\n\n\n\n<p><strong>Cost for Tiles and Marble = PKR 603,000<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>ELECTRICAL COMPONENTS<\/strong><\/h3>\n\n\n\n<p>The construction cost for adding a second storey of a 10 marla house in Pakistan involves fixing electrical fixtures. For an A category unit as being discussed in this blog, you can get a decent set of lights, lamps and chandeliers at a cost of PKR 85,000. 7 Royal or GFC fans at the rate of PKR 5,500 are required when constructing the upper portion of the house. You would need a total amount of PKR 10,200.&nbsp;<\/p>\n\n\n\n<p>Some 12 Opal switchboards at the rate of PKR 850 per unit are needed at a cost of PKR 10,200. You would also need 11 Opal power plugs at the rate of PKR 475 per unit, making the total to PKR 5,225.&nbsp;<\/p>\n\n\n\n<p>Having a reliable exhaust system is equally important. 4 exhaust fans at the rate of PKR 2,500 per unit is required. The total investment in installing exhaust fans in the kitchen and bathrooms is PKR 10,000. Schneider Breakers would cost around PKR 30,000 while the electrician would charge around PKR 18,000.<\/p>\n\n\n\n<p><strong>Cost of Electrical Components = PKR 196,925<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>KITCHEN AND BATH ACCESSORIES<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"640\" src=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09-1024x640.jpg\" alt=\"bathroom fixtures in construction\" class=\"wp-image-98294\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09-1024x640.jpg 1024w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09-300x188.jpg 300w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09-768x480.jpg 768w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09-640x400.jpg 640w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09-368x230.jpg 368w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-A-01-09.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Bathroom fixtures are also included in the construction cost<\/figcaption><\/figure>\n\n\n\n<p>Kitchen and bathrooms are some of the most important rooms in a house or on a floor. If you are adding a second storey of a 10 marla house, then you would also need to have a separate kitchen and bathroom on the first floor.&nbsp;<\/p>\n\n\n\n<p>For constructing a kitchen, the hood and knob would cost PKR 50,000, whereas the cost of installing a sink is PKR 15,000. For constructing a bathroom good quality Porta and Marachi bathroom vanity sets would cost PKR 9,000 per unit, taking the total cost to PKR 27,000. Since there are three bathrooms, you would need PKR 19,000 per unit. Three Porta commodes of PKR 15,000 each are required, making the total cost of installing commodes to PKR 45,000.<\/p>\n\n\n\n<p>Three Master bath sets of PKR 57,000 are required in the bathroom for the first floor. Similarly, 3 Master bath hangings of PKR 5,000 each are needed at the total cost of PKR 15,000. The plumber that you will hire to carry out the above-mentioned tasks would charge approximately PKR 15,000.<\/p>\n\n\n\n<p><strong>Cost for Kitchen &amp; Bath Accessories = PKR 224,000<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>PAINT AND CEILING<\/strong><\/h3>\n\n\n\n<p>The construction cost for adding a second storey of a 10 marla house also involves painting the floor. If you are using Master Paints, you need to shell out around PKR 250,000. For the exterior rockwall, keep a budget of PKR 60,000. To install the false ceiling, reserve a budget of PKR 97,500.<\/p>\n\n\n\n<p><strong>Cost for Paint &amp; Ceiling = PKR 407,500<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>WINDOWS AND MIRRORS<\/strong><\/h3>\n\n\n\n<p>Aluminum and glass work&nbsp;in houses includes windows and window frames, wire mesh and glass panes. The cost of Aluminium windows and glass is PKR 150,000 for the 1<sup>st<\/sup> floor, while the mirrors would cost PKR 15,000. For the staircase, railings are needed which cost you PKR 45,000.<\/p>\n\n\n\n<p><strong>Cost for Windows &amp; Mirrors = PKR 210,000<\/strong><\/p>\n\n\n\n<h3 class=\"wp-block-heading\"><strong>WOODWORK<\/strong><\/h3>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"640\" src=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09-1024x640.jpg\" alt=\"In-built cabinets and wardrobes are also included in the construction cost\" class=\"wp-image-98296\" srcset=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09-1024x640.jpg 1024w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09-300x188.jpg 300w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09-768x480.jpg 768w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09-640x400.jpg 640w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09-368x230.jpg 368w, https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-C-01-09.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>In-built cabinets and wardrobes are also included in the construction cost of the first floor of a 10 marla house<\/figcaption><\/figure>\n\n\n\n<p>Woodwork in the house includes in-built wardrobes, kitchen cabinets and door frames. Apart from this, decorative LCD racks and brass door handles are also included in this. You need to shell out PKR 110,000 for wooden doors. Built-in wooden wardrobes would cost PKR 165,000. Spend PKR 125,000 on kitchen woodwork. For an LCD rack, invest PKR 25,000. The brass door handles would need a sum of PKR 15,000.<\/p>\n\n\n\n<p>There would be one semi-solid wooden door and the rest of the doors would have Malaysian plywood. It would cost you PKR 650,000. Splurge on the wardrobes by investing a sum of PKR 100,000 for wardrobes. For the LCD rack you would need PKR 25,000, while brass door handles would cost around PKR 15,000.<\/p>\n\n\n\n<p><strong>Cost for Woodwork = PKR 440,000<\/strong><\/p>\n\n\n\n<p><strong>Total Finishing Cost of Building the First Floor of a 10 Marla House in Pakistan = PKR 2,081,425<\/strong><\/p>\n\n\n\n<p>When we combine the grey structure and finishing cost of constructing the first floor of a 10 marla house, we get the final budget of building another storey, which is PKR 4,214,425.<\/p>\n\n\n\n<p><strong>Total construction cost of constructing an upper storey of a 10 marla house in Pakistan = PKR&nbsp;2,133,000&nbsp;+ PKR&nbsp;2,081,425&nbsp;= PKR 4,214,425<\/strong><\/p>\n\n\n\n<p>So, there you have it \u2013 a detailed analysis of how PKR 4,214,425 would be the final construction cost of building another storey in Pakistan. We will be sharing similar analysis for constructing an upper storey of a 10 marla A+ category house in Pakistan. So keep checking Zameen Blog, the <a href=\"http:\/\/zameen.com\/blog\" target=\"_blank\" rel=\"noreferrer noopener\">best real estate blog in Pakistan<\/a>.<\/p>\n\n\n\n<p>Meanwhile, you should also take a look at our detailed blogs on: <a href=\"https:\/\/www.zameen.com\/blog\/construction-cost-comparison-a-vs-a-plus-category-5-marla-house.html\" target=\"_blank\" rel=\"noreferrer noopener\">Construction cost comparison of an A and A+ category 5 marla house in Pakistan<\/a>. Subscribe to the Zameen Newsletter appearing on the right hand side of the page.<\/p>\n\n\n\n<p>For those who are looking to buy land before building a house, then choose your area from these major cities in Pakistan:&nbsp;<a href=\"https:\/\/www.zameen.com\/area-guides\/lahore\/\" target=\"_blank\" rel=\"noreferrer noopener\">Lahore<\/a>,&nbsp;<a href=\"https:\/\/www.zameen.com\/area-guides\/karachi\/\" target=\"_blank\" rel=\"noreferrer noopener\">Karachi<\/a>,&nbsp;<a href=\"https:\/\/www.zameen.com\/area-guides\/islamabad\/\" target=\"_blank\" rel=\"noreferrer noopener\">Islamabad<\/a>,&nbsp;<a href=\"https:\/\/www.zameen.com\/area-guides\/multan\/\" target=\"_blank\" rel=\"noreferrer noopener\">Multan<\/a>. Did you find our cost analysis useful? Do share your feedback with us on <a href=\"mailto:blog@zameen.com\" target=\"_blank\" rel=\"noreferrer noopener\">blog@zameen.com<\/a> and we will surely get back to you!<\/p>\n\n\n\n<p><em>Note: The rates quoted in this article are from August 2020. The rates in the article have been sourced from Mr. Kashif Mehmood, CEO of Alpha Construction Company. He is available at 0310-4811578<\/em><\/p>\n","protected":false},"excerpt":{"rendered":"<p>In This Post:&#8211; Grey Structure Cost&#8211; Finishing Cost Most homeowners build the ground floor and start living in it until they gather enough financial resources to construct the upper storey of the house. It is, therefore, important to get a rough estimate of the finances required to build the first floor so that you know how much money you need to save for it. In this blog, we will provide you with the construction cost to build the first floor of a 10 marla house in Pakistan. So, without further ado, let\u2019s get started. Construction Cost to Build the First Floor of a 10 Marla House in Pakistan If you do not know how much it would cost to build an upper floor in Pakistan, then take a look at our budget detailing the quantity of each construction material and the cost involved in the process. For your convenience, here is a breakdown of the construction cost to build an upper storey of a 10 marla house. The upper floor under consideration includes 3 bedrooms with an attached bathroom and a kitchen. The covered area of an upper floor comprises 1,550 sq ft with a 100 sq ft mumtee. Grey&hellip;<\/p>\n","protected":false},"author":84,"featured_media":98302,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[29],"tags":[76524,76526,76531,76532],"persona":[32409],"class_list":{"0":"post-98275","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-construction-cost-to-build-the-first-floor-of-a-10-marla-house-in-pakistan","9":"tag-cost-to-build-an-upper-floor-of-pakistan","10":"tag-cost-to-build-the-first-floor","11":"tag-finishing-cost-of-the-first-floor-of-a-10-marla-house-in-pakistan","12":"persona-constructiondevelopments","13":"cat-29-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction Cost to Build the First Floor of a 10 Marla House in Pakistan | Zameen Blog<\/title>\n<meta name=\"description\" content=\"Want to add another floor to your unit? Fret not! Check out the construction cost to build the first floor of a 10 marla house in Pakistan and plan accordingly.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction Cost Guide: Building the Upper Storey of a 10 Marla House\" \/>\n<meta property=\"og:description\" content=\"Want to add another floor to your unit? Fret not! Check out the construction cost to build the first floor of a 10 marla house in Pakistan and plan accordingly.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html\" \/>\n<meta property=\"og:site_name\" content=\"A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-01T12:37:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-01T12:37:42+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-Cover-01-09-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1440\" \/>\n\t<meta property=\"og:image:height\" content=\"625\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"AS\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"AS\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"9 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction Cost to Build the First Floor of a 10 Marla House in Pakistan | Zameen Blog","description":"Want to add another floor to your unit? Fret not! Check out the construction cost to build the first floor of a 10 marla house in Pakistan and plan accordingly.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html","og_locale":"en_US","og_type":"article","og_title":"Construction Cost Guide: Building the Upper Storey of a 10 Marla House","og_description":"Want to add another floor to your unit? Fret not! Check out the construction cost to build the first floor of a 10 marla house in Pakistan and plan accordingly.","og_url":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html","og_site_name":"A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-09-01T12:37:41+00:00","article_modified_time":"2020-09-01T12:37:42+00:00","og_image":[{"width":1440,"height":625,"url":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-Cover-01-09-1.jpg","type":"image\/jpeg"}],"author":"AS","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"AS","Est. reading time":"9 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html"},"author":{"name":"AS","@id":"https:\/\/www.zameen.com\/blog\/#\/schema\/person\/c0a83633932fb3c61cd3127c4b1cb991"},"headline":"Cost of Constructing an Upper Storey of a 10 Marla House","datePublished":"2020-09-01T12:37:41+00:00","dateModified":"2020-09-01T12:37:42+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html"},"wordCount":1880,"image":{"@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#primaryimage"},"thumbnailUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-Cover-01-09-1.jpg","keywords":["construction cost to build the first floor of a 10 marla house in Pakistan","cost to build an upper floor of Pakistan","cost to build the first floor","finishing cost of the first floor of a 10 marla house in Pakistan"],"articleSection":["Construction"],"inLanguage":"en-US"},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html","url":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html","name":"Construction Cost to Build the First Floor of a 10 Marla House in Pakistan | Zameen Blog","isPartOf":{"@id":"https:\/\/www.zameen.com\/blog\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#primaryimage"},"thumbnailUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-Cover-01-09-1.jpg","datePublished":"2020-09-01T12:37:41+00:00","dateModified":"2020-09-01T12:37:42+00:00","author":{"@id":"https:\/\/www.zameen.com\/blog\/#\/schema\/person\/c0a83633932fb3c61cd3127c4b1cb991"},"description":"Want to add another floor to your unit? Fret not! Check out the construction cost to build the first floor of a 10 marla house in Pakistan and plan accordingly.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#primaryimage","url":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-Cover-01-09-1.jpg","contentUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2020\/09\/Construction-Cost-of-the-First-Floor-of-a-10-Marla-House-Cover-01-09-1.jpg","width":1440,"height":625,"caption":"construction cost to build the first floor of a 10 marla house in Pakistan"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/blog\/construction-cost-first-floor-10-marla-house.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/blog"},{"@type":"ListItem","position":2,"name":"Construction","item":"https:\/\/www.zameen.com\/blog\/construction"},{"@type":"ListItem","position":3,"name":"Cost of Constructing an Upper Storey of a 10 Marla House"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/blog\/#website","url":"https:\/\/www.zameen.com\/blog\/","name":"A blog about real estate, lifestyle and tourism in Pakistan | Zameen Blog","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/blog\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Person","@id":"https:\/\/www.zameen.com\/blog\/#\/schema\/person\/c0a83633932fb3c61cd3127c4b1cb991","name":"AS","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/03\/AS-1-96x96.png","url":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/03\/AS-1-96x96.png","contentUrl":"https:\/\/cdn-blog.zameen.com\/blog\/wp-content\/uploads\/2019\/03\/AS-1-96x96.png","caption":"AS"},"description":"AS writes for a positive change. She believes that words hold immense power! She bears an entrepreneurial spirit. In her free time, she motivates women to follow their dreams."}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts\/98275","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/comments?post=98275"}],"version-history":[{"count":22,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts\/98275\/revisions"}],"predecessor-version":[{"id":98312,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/posts\/98275\/revisions\/98312"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/media\/98302"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/media?parent=98275"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/categories?post=98275"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/tags?post=98275"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/blog\/wp-json\/wp\/v2\/persona?post=98275"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}