Advertise
Search Options
Search
Start New Discussion 
Ask Now
Prop Guide

Property Guru
7340 posts
24 best
Nadeem Ahmed

Property Guru
4785 posts
18 best
Falcon

Property Guru
4699 posts
6 best
Pakistani-1

Property Guru
3031 posts
26 best
Nasir

Property Guru
2515 posts
21 best
Abdul Qayyum

Property Guru
2073 posts
4 best
Sayeein

Property Guru
1868 posts
0 best
Khalid Javai

Property Guru
1795 posts
0 best
Sheikh Abdul

Property Guru
1753 posts
16 best
Baber Rabban

Property Guru
1716 posts
16 best
Isloo

Property Guru
1529 posts
3 best
Dsa

Expert Authority
1452 posts
2 best
Syed Ibrhaim

Expert Authority
1439 posts
17 best
Imtiaz

Expert Authority
1376 posts
8 best
Arshad

Expert Authority
1189 posts
1 best
Pardesi

Expert Authority
1172 posts
8 best
Mbs

Expert Authority
1157 posts
13 best
Ht

Expert Authority
1115 posts
9 best
Irfan

Expert Authority
1112 posts
8 best
Real Estate

Expert Authority
1052 posts
3 best
Become an expert on the forum, check Forum Ranks.
Upcoming Projects discussions and advice. Participate in ongoing dicussions and get invaluable Upcoming Projects advice from people who are experts in their industries or start a new Upcoming Projects discussion.
Ch Shahid
( 278 posts )

[1453 Replies]
Yesterday PM Nawaz Sharif approved the road network for new Islamabad airport. There will be two roads one for people coming from Rwp/Isb and one for people coming from Chakri, Chakwal, Sargodha etc.

The main road from rwp/isb will start from Golra more Haji camp towards new airport. It will pass through sector i-14,15,16,17, mouza noon and bajnial. This road will also have fence line. And the second road will be from thallian interchange towards new airport, this road will also handle cargo traffic. All the aviation related commercial activities will be on this road because it has no fence line. Pm Nawaz Sharif also ordered immediate construction for this project.

    2304 days ago In Upcoming Projects
    Post Answer
    Ch Shahid
    (278 posts)
    It is expected to start in october.
      2302 days ago 

      Intern
      (219 posts)
      @Ch Shahi, with new alignment do you mean that all the traffic from ISB to airport would go through I-14/15/16?
      Which Golra morr are you referring to? As like peshawar mor people refer more than one points as golra morr. Can you please make a sketch and scan and post the link of the image?
        2302 days ago 

        PAKISTANI-1
        (3020 posts)
        If you are coming from Zero Point on Kashmir Highway and you reach Golra Roundabout (near G-13), there is a road that goes left towards pindi Saddar GT Road.

        On this road, on the right side there is a depot for old army jeeps and vehicles, an old railway line crossing and on the right side there are traditional wooden doors plus wrought-iron furniture shops. By taking this road, you will reach GT Road, and if you dont turn right or left but keep going straight, you will reach cda sectors I-14, 15 and 16. On the left side of I-16 there is Gulshan-e-Fatima society and foechs.

        I think this is the new road that Ch Shahid is talking about. According to Ch Shahid's information this road will be doubled and fenced (and probably they will need a flyover to cross GT Road and reach I-16. Then this road will be extended to cross M-1 motorway and reach the new airport.

        Ch Shahid sahab please confirm if that is what you mean?
          2301 days ago 

          Intern
          (219 posts)
          So does this mean that zone-2 societies like f-15/17, e-16/17, g-15/16 etc would suffer because Kashmir Highway would not be extended through the old route?
            2301 days ago 

            Hawk2k
            (145 posts)
            Even PM has announced the construction of new roads this project will really take long time and existing link of kasmir highway to motorway and then to airport is still the most optimal link. Kashmir highly will in any case be extended to new airport as this is the most viable and approachable link. Kashmir highway is a priority road and it makes no sense for not connecting it to airport.
              2301 days ago 

              PAKISTANI-1
              (3020 posts)
              JKCHS (G-15, F-15) and Interior Ministry (G-16) already are touching Kashmir Highway or Motorway link road - whatever name you use.
                2300 days ago 

                Ch Shahid
                (278 posts)
                @Intern
                PK1 has explained very well.
                  2300 days ago 

                  Ali
                  (631 posts)
                  Sir Main Access Road will however cut M1/M2 Junction with some modification.
                    2300 days ago 

                    Ch Shahid
                    (278 posts)
                    There will be a new interchange on M-2.
                    Its 2 k.m away from M-1 & M-2 junction.
                      2300 days ago 

                      Intern
                      (219 posts)
                      @Pk1, @Ch Shahid, that is right that a road going to motorway is touching JKCHS and I have gone through this road many times.
                      Actually I asked from the perspective that if main airport road would be through I-14 etc. Then what would be the fate of this road. Would it be abandoned and used ONLY for motorway. Because a major awaiting trigger for JKCHS was a direct link from G-15/G-16 to the road coming from airport/motorway. I wanted to ask would this charm be gone now? Can you both please enlighten on this aspect. Thanks.
                        2300 days ago 

                        Post Answer (1453 Replies)
                        < 1 2 3 4 5 6 7 8 9 10 11 > >>
                        Post Reply
                         
                        Username:
                        Password:
                        Email Basket (0)
                        SEND EMAIL   REMOVE ALL