{"id":101235,"date":"2025-01-30T10:00:00","date_gmt":"2025-01-30T05:00:00","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=101235"},"modified":"2025-01-29T14:06:58","modified_gmt":"2025-01-29T09:06:58","slug":"walton-road-upgradation-80-work-completed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html","title":{"rendered":"Walton Road Revamp: 80% work done, final touches underway"},"content":{"rendered":"\n<p>Lahore: Lahore Divisional Commissioner Zaid bin Maqsood visited the Walton Road construction site to assess progress on the upgradation project. During the visit, he chaired a meeting attended by CEO CBD Imran Ameen, DC Lahore Syed Musa Raza, CEO Walton, and officials from PHA, LESCO, WASA, and the Traffic Police.<\/p>\n\n\n\n<p>Officials from CBD and NESPAK briefed the meeting on the latest developments, confirming that 80% of the Walton Road upgradation work has been completed. The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at a rapid pace, and 1,500 meters of cable is being placed daily as part of the electrical works. Work on the green belts is also in progress.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/zameen-arx-luxury-tower-lhr-cbd-6580.html\" target=\"_blank\" rel=\"noreferrer noopener\">Zameen Arx debuts as \u2018Forefront Project\u2019 in CBD\u2019s evolution: Punjab\u2019s tallest venture<\/a><\/p>\n\n\n\n<p>Additionally, the meeting was informed that 4.2 kilometers of trunk sewer lines have been completed, replacing the outdated drainage system. The Major Ishaq Shaheed Flyover, spanning 510 meters, is now operational, easing traffic congestion on Walton Road.<\/p>\n\n\n\n<p>Commissioner Zaid bin Maqsood directed TEPA and the CBD team to finalize lane markings and road signage. He also instructed NESPAK, the Traffic Police, and TEPA to conduct a joint visit to redesign U-turns for improved traffic flow. Furthermore, PHA was asked to increase manpower for horticulture work on the road medians.<\/p>\n\n\n\n<p>Highlighting the importance of Walton Road as a key route connecting Ferozepur Road to Defence, the Commissioner stressed the need for timely completion of the remaining work. He emphasized that the project, once fully operational, will significantly improve traffic flow and benefit daily commuters.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: Lahore Divisional Commissioner Zaid bin Maqsood visited the Walton Road construction site to assess progress on the upgradation project. During the visit, he chaired a meeting attended by CEO CBD Imran Ameen, DC Lahore Syed Musa Raza, CEO Walton, and officials from PHA, LESCO, WASA, and the Traffic Police. Officials from CBD and NESPAK briefed the meeting on the latest developments, confirming that 80% of the Walton Road upgradation work has been completed. The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at a rapid pace, and 1,500 meters of cable is being placed daily as part of the electrical works. Work on the green belts is also in progress. Read: Zameen Arx debuts as \u2018Forefront Project\u2019 in CBD\u2019s evolution: Punjab\u2019s tallest venture Additionally, the meeting was informed that 4.2 kilometers of trunk sewer lines have been completed, replacing the outdated drainage system. The Major Ishaq Shaheed Flyover, spanning 510 meters, is now operational, easing traffic congestion on Walton Road. Commissioner Zaid bin Maqsood directed TEPA and the CBD team to finalize lane markings and road signage. He also instructed NESPAK, the Traffic Police, and&hellip;<\/p>\n","protected":false},"author":18,"featured_media":60025,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[56663,30917,57414,51012,61869,50740,62224,60532,18049,62227,62226,62225,62228,10378,57465],"persona":[],"class_list":{"0":"post-101235","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-cbd-punjab","9":"tag-infrastructure-projects","10":"tag-lahore-commissioner","11":"tag-lahore-development","12":"tag-lahore-infrastructure","13":"tag-lahore-roads","14":"tag-lahore-traffic-improvement","15":"tag-major-ishaq-shaheed-flyover","16":"tag-nespak","17":"tag-pha-lahore","18":"tag-road-construction-progress","19":"tag-road-upgradation","20":"tag-tepa","21":"tag-urban-development","22":"tag-walton-road","23":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Walton Road Upgradation: 80% work completed - Zameen News<\/title>\n<meta name=\"description\" content=\"The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Walton Road Upgradation: 80% work completed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2025-01-30T05:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/800px-Road_construction_in_progress.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Walton Road Upgradation: 80% work completed - Zameen News","description":"The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html","og_locale":"en_US","og_type":"article","og_title":"Walton Road Upgradation: 80% work completed - Zameen News","og_description":"The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at...","og_url":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2025-01-30T05:00:00+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/800px-Road_construction_in_progress.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Walton Road Revamp: 80% work done, final touches underway","datePublished":"2025-01-30T05:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html"},"wordCount":276,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/800px-Road_construction_in_progress.jpg","keywords":["CBD Punjab","infrastructure projects","Lahore Commissioner","Lahore Development","Lahore infrastructure","Lahore Roads","Lahore traffic improvement","Major Ishaq Shaheed Flyover","NESPAK","PHA Lahore","road construction progress","road upgradation","TEPA","urban development","Walton Road"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html","url":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html","name":"Walton Road Upgradation: 80% work completed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/800px-Road_construction_in_progress.jpg","datePublished":"2025-01-30T05:00:00+00:00","description":"The main road is now fully prepared, with asphalt being laid at a daily rate of 1,100 tons. Streetlight poles are being installed at...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/800px-Road_construction_in_progress.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/800px-Road_construction_in_progress.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/walton-road-upgradation-80-work-completed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Walton Road Revamp: 80% work done, final touches underway"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/101235","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=101235"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/101235\/revisions"}],"predecessor-version":[{"id":101236,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/101235\/revisions\/101236"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/60025"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=101235"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=101235"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=101235"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=101235"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}