{"id":104517,"date":"2026-01-16T17:28:35","date_gmt":"2026-01-16T12:28:35","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=104517"},"modified":"2026-01-16T17:28:40","modified_gmt":"2026-01-16T12:28:40","slug":"gwadar-railway-projects-feasibility-study-completed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html","title":{"rendered":"Gwadar Railway project&#8217;s feasibility study completed, board&#8217;s approval awaited"},"content":{"rendered":"\n<p>Islamabad: The Senate Standing Committee on Pakistan Railways was informed on Thursday that the feasibility study for the Gwadar Railway project, conducted by an international firm, has been successfully completed. Officials from the Ministry of Railways told the panel that the ambitious project is now ready to be presented to the board for final approval, marking a crucial step in moving the initiative forward. The committee, chaired by Jam Saifullah Khan, reviewed key aspects of railway development, operational reforms, and strategic policy matters.<\/p>\n\n\n\n<p>The federal government is exploring multiple options for completing the railway, including potential partnerships with mining companies, as the line is planned to pass through Balochistan\u2019s mineral-rich regions and link them directly with Gwadar port. The project aims to strengthen regional connectivity and create alternate rail routes to Turkey and Russia via Iran, while easing congestion at Karachi Port.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/egypt-pitches-suez-canal-gwadar-corridor.html\" target=\"_blank\" rel=\"noreferrer noopener\">Egypt pitches Suez Canal\u2013Gwadar commercial corridor<\/a><\/p>\n\n\n\n<p>Officials also shared updates on the Basima to Jacobabad railway section, for which a feasibility study has been completed with an estimated cost of USD 4.7 billion. Plans to connect Gwadar with the national railway network and Quetta were discussed in detail, including the Main-link Express, a 680-kilometre line from Gwadar to Nokundi, and Main Line-4 (ML-4), which will integrate Gwadar fully into Pakistan\u2019s national rail system.<\/p>\n\n\n\n<p>The committee was informed that a joint survey covering 282 acres for land acquisition has been completed, and the Nokundi-Rohri section will be financed through USD 590 million in bridge funding. The Rohri-Karachi section is expected to cost around USD 2 billion, with support from the Asian Development Bank. Committee members emphasized that improving existing railway infrastructure must go hand-in-hand with expansion projects.<\/p>\n\n\n\n<p>Additionally, the panel discussed operational reforms, including the outsourcing of luggage van services, which combined with natural attrition, has reduced staff numbers and increased annual revenues by PKR &nbsp;82 million. Land development at Gwadar Railway Container Yard was also reviewed, highlighting 498.33 acres acquired based on feasibility studies from 2005, later revalidated in 2019.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The Senate Standing Committee on Pakistan Railways was informed on Thursday that the feasibility study for the Gwadar Railway project, conducted by an international firm, has been successfully completed. Officials from the Ministry of Railways told the panel that the ambitious project is now ready to be presented to the board for final approval, marking a crucial step in moving the initiative forward. The committee, chaired by Jam Saifullah Khan, reviewed key aspects of railway development, operational reforms, and strategic policy matters. The federal government is exploring multiple options for completing the railway, including potential partnerships with mining companies, as the line is planned to pass through Balochistan\u2019s mineral-rich regions and link them directly with Gwadar port. The project aims to strengthen regional connectivity and create alternate rail routes to Turkey and Russia via Iran, while easing congestion at Karachi Port. Read: Egypt pitches Suez Canal\u2013Gwadar commercial corridor Officials also shared updates on the Basima to Jacobabad railway section, for which a feasibility study has been completed with an estimated cost of USD 4.7 billion. Plans to connect Gwadar with the national railway network and Quetta were discussed in detail, including the Main-link Express, a 680-kilometre line from Gwadar&hellip;<\/p>\n","protected":false},"author":18,"featured_media":62358,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[68404,70686,64290,2412,70680,70678,70685,70681,38585,70683,2364,61822,70679,70684,67356,70682,2285,61090],"persona":[],"class_list":{"0":"post-104517","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-balochistan-rail-connectivity","9":"tag-board-approval-pending","10":"tag-cpec-connectivity","11":"tag-gwadar-port","12":"tag-gwadar-railway-feasibility-study","13":"tag-gwadar-railway-project","14":"tag-gwadar-to-nokundi-rail-line","15":"tag-main-link-express","16":"tag-ministry-of-railways","17":"tag-ml-4-railway","18":"tag-pakistan-railways","19":"tag-pakistan-transport-projects","20":"tag-quetta-rail-link","21":"tag-rail-development","22":"tag-railway-infrastructure","23":"tag-regional-trade-routes","24":"tag-senate-standing-committee","25":"tag-transport-connectivity","26":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gwadar Railway project&#039;s feasibility study completed-Zameen News<\/title>\n<meta name=\"description\" content=\"The committee was informed that a joint survey covering 282 acres for land acquisition has been completed, and the Nokundi-Rohri section...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gwadar Railway project&#039;s feasibility study completed-Zameen News\" \/>\n<meta property=\"og:description\" content=\"The committee was informed that a joint survey covering 282 acres for land acquisition has been completed, and the Nokundi-Rohri section...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2026-01-16T12:28:35+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-01-16T12:28:40+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/ML-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gwadar Railway project's feasibility study completed-Zameen News","description":"The committee was informed that a joint survey covering 282 acres for land acquisition has been completed, and the Nokundi-Rohri section...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html","og_locale":"en_US","og_type":"article","og_title":"Gwadar Railway project's feasibility study completed-Zameen News","og_description":"The committee was informed that a joint survey covering 282 acres for land acquisition has been completed, and the Nokundi-Rohri section...","og_url":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2026-01-16T12:28:35+00:00","article_modified_time":"2026-01-16T12:28:40+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/ML-1.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Gwadar Railway project&#8217;s feasibility study completed, board&#8217;s approval awaited","datePublished":"2026-01-16T12:28:35+00:00","dateModified":"2026-01-16T12:28:40+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html"},"wordCount":340,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/ML-1.jpg","keywords":["Balochistan rail connectivity","board approval pending","CPEC Connectivity","Gwadar port","Gwadar railway feasibility study","Gwadar Railway project","Gwadar to Nokundi rail line","Main-link Express","Ministry of Railways","ML-4 railway","Pakistan Railways","Pakistan transport projects","Quetta rail link","rail development","railway infrastructure","regional trade routes","Senate Standing Committee","transport connectivity"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html","url":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html","name":"Gwadar Railway project's feasibility study completed-Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/ML-1.jpg","datePublished":"2026-01-16T12:28:35+00:00","dateModified":"2026-01-16T12:28:40+00:00","description":"The committee was informed that a joint survey covering 282 acres for land acquisition has been completed, and the Nokundi-Rohri section...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/ML-1.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/ML-1.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/gwadar-railway-projects-feasibility-study-completed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Gwadar Railway project&#8217;s feasibility study completed, board&#8217;s approval awaited"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/104517","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=104517"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/104517\/revisions"}],"predecessor-version":[{"id":104519,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/104517\/revisions\/104519"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/62358"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=104517"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=104517"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=104517"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=104517"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}