{"id":105452,"date":"2026-05-05T14:45:58","date_gmt":"2026-05-05T09:45:58","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=105452"},"modified":"2026-05-05T14:46:03","modified_gmt":"2026-05-05T09:46:03","slug":"gujranwala-mass-transit-system-design-cleared","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html","title":{"rendered":"Gujranwala Mass Transit System design cleared"},"content":{"rendered":"\n<p>Lahore: The design of the Gujranwala Mass Transit System was approved during a high-level meeting chaired by Punjab Chief Minister Maryam Nawaz in Lahore on Friday, following a detailed briefing on the project\u2019s key features and scope.<\/p>\n\n\n\n<p>During the meeting, the chief minister directed authorities to ensure that all areas of Gujranwala are effectively connected to the mass transit network through feeder bus services, aiming to provide an integrated and accessible public transport system.<\/p>\n\n\n\n<p>She also approved the inclusion of two tunnel sections to help ease traffic congestion, along with granting a principled nod for 17 to 19 kilometres of underground track.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/e-bus-service-begins-in-wazirabad-gujranwala.html\" target=\"_blank\" rel=\"noreferrer noopener\">E-bus service begins in Wazirabad, Gujranwala<\/a><\/p>\n\n\n\n<p>According to officials, the project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad. The system will comprise 24 stations, including two underground facilities.<\/p>\n\n\n\n<p>As part of the project, depots will be established in Garjakh, Chan Da Qila and Gondlanwala to support operations.<\/p>\n\n\n\n<p>The transit system is expected to cater to up to 2.6 million passengers. Plans also include the installation of solar power systems at all stations and depots, along with the development of a 62-kilometre drainage network and a modern command and control centre.<\/p>\n\n\n\n<p>CM Maryam said the project is aimed at transforming the city\u2019s transport infrastructure by offering residents a modern, efficient and integrated commuting solution.<\/p>\n\n\n\n<p><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: The design of the Gujranwala Mass Transit System was approved during a high-level meeting chaired by Punjab Chief Minister Maryam Nawaz in Lahore on Friday, following a detailed briefing on the project\u2019s key features and scope. During the meeting, the chief minister directed authorities to ensure that all areas of Gujranwala are effectively connected to the mass transit network through feeder bus services, aiming to provide an integrated and accessible public transport system. She also approved the inclusion of two tunnel sections to help ease traffic congestion, along with granting a principled nod for 17 to 19 kilometres of underground track. Read: E-bus service begins in Wazirabad, Gujranwala According to officials, the project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad. The system will comprise 24 stations, including two underground facilities. As part of the project, depots will be established in Garjakh, Chan Da Qila and Gondlanwala to support operations. The transit system is expected to cater to up to 2.6 million passengers. Plans also include the installation of solar power systems at all stations and depots, along with the development of a 62-kilometre drainage network and a modern command and control centre. CM&hellip;<\/p>\n","protected":false},"author":18,"featured_media":100219,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[72869,72074,72867,72873,72872,47122,58624,69724,72871,5588,3237,72874,72868,72866,72870],"persona":[],"class_list":{"0":"post-105452","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-command-and-control-centre","9":"tag-drainage-infrastructure","10":"tag-feeder-buses","11":"tag-gujranwala-development","12":"tag-gujranwala-mass-transit-system","13":"tag-infrastructure-development","14":"tag-maryam-nawaz","15":"tag-mass-transit-project","16":"tag-metro-project-gujranwala","17":"tag-public-transport","18":"tag-punjab-government","19":"tag-solar-powered-stations","20":"tag-transport-planning","21":"tag-underground-track","22":"tag-urban-transport-pakistan","23":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gujranwala Mass Transit System design cleared - Zameen News<\/title>\n<meta name=\"description\" content=\"The project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gujranwala Mass Transit System design cleared - Zameen News\" \/>\n<meta property=\"og:description\" content=\"The project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2026-05-05T09:45:58+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-05-05T09:46:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2024\/10\/News-Cover-Govt-Punjab.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gujranwala Mass Transit System design cleared - Zameen News","description":"The project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html","og_locale":"en_US","og_type":"article","og_title":"Gujranwala Mass Transit System design cleared - Zameen News","og_description":"The project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad...","og_url":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2026-05-05T09:45:58+00:00","article_modified_time":"2026-05-05T09:46:03+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2024\/10\/News-Cover-Govt-Punjab.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Gujranwala Mass Transit System design cleared","datePublished":"2026-05-05T09:45:58+00:00","dateModified":"2026-05-05T09:46:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html"},"wordCount":226,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2024\/10\/News-Cover-Govt-Punjab.jpg","keywords":["command and control centre","drainage infrastructure","feeder buses","Gujranwala development","Gujranwala Mass Transit System","infrastructure development","maryam nawaz","mass transit project","metro project Gujranwala","public transport","Punjab government","solar powered stations","transport planning","underground track","urban transport Pakistan"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html","url":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html","name":"Gujranwala Mass Transit System design cleared - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2024\/10\/News-Cover-Govt-Punjab.jpg","datePublished":"2026-05-05T09:45:58+00:00","dateModified":"2026-05-05T09:46:03+00:00","description":"The project involves the development of a 31.5-kilometre transit corridor stretching from Ghakhar to Aimanabad...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2024\/10\/News-Cover-Govt-Punjab.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2024\/10\/News-Cover-Govt-Punjab.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/gujranwala-mass-transit-system-design-cleared.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Gujranwala Mass Transit System design cleared"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/105452","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=105452"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/105452\/revisions"}],"predecessor-version":[{"id":105453,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/105452\/revisions\/105453"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/100219"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=105452"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=105452"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=105452"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=105452"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}