{"id":106376,"date":"2026-08-11T17:40:55","date_gmt":"2026-08-11T12:40:55","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=106376"},"modified":"2026-08-11T17:41:00","modified_gmt":"2026-08-11T12:41:00","slug":"nha-prequalification-of-eight-firms-m-6-project","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html","title":{"rendered":"Hyderabad-Sukkur Motorway: NHA prequalification of eight firms"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Islamabad: The National Highway Authority (NHA) has prequalified eight construction firms and joint ventures for two sections of the stalled Hyderabad-Sukkur Motorway (M-6), marking progress towards completing the 306-kilometre motorway project.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The prequalification process was launched in December 2025 for Section-IV (Naushahro Feroze-Ranipur), spanning 60.90 kilometres, and Section-V (Ranipur-Sukkur), covering 59.88 kilometres. Financing for both sections has been committed by the Islamic Development Bank.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">A total of 16 firms and joint ventures applied for the two sections. Following evaluation by NHA\u2019s Procurement and Contracts (P&amp;CA) section, eight applicants were disqualified while eight were cleared for the next stage.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The prequalified firms include SAJCO-ZKB (JV), China Construction Third Engineering Bureau Group Corporation Limited, SGEG-Umer Jan (JV), China 20 Bureau Group Company Limited, Onur Taahhut Tasimacilik Insaat Ticaret ve Sanayi, and Matracon-ZTZS (JV). The source material lists six names among the eight prequalified applicants.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The M-6 is being developed in five sections: Hyderabad-Tando Adam, Tando Adam-Nawabshah, Nawabshah-Naushahro Feroze, Naushahro Feroze-Ranipur and Ranipur-Sukkur.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Financing has been secured for three sections through international lenders, with the Islamic Development Bank financing Sections IV and V and the OPEC Fund committing financing for Section III. The remaining two sections are planned under the public-private partnership (PPP) model.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The 306-kilometre greenfield M-6 is intended to complete the missing link in Pakistan\u2019s north-south motorway network, providing uninterrupted motorway connectivity between Karachi and Lahore, Islamabad and Peshawar through the existing M-5.<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">The project was previously halted after the NHA terminated the contract of TECMC (Pvt) Ltd in December 2023 after the contractor failed to achieve financial close despite being granted two extensions. Subject to timely financing arrangements and contract awards, the motorway is expected to be completed around 2029.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The National Highway Authority (NHA) has prequalified eight construction firms and joint ventures for two sections of the stalled Hyderabad-Sukkur Motorway (M-6), marking progress towards completing the 306-kilometre motorway project. The prequalification process was launched in December 2025 for Section-IV (Naushahro Feroze-Ranipur), spanning 60.90 kilometres, and Section-V (Ranipur-Sukkur), covering 59.88 kilometres. Financing for both sections has been committed by the Islamic Development Bank. A total of 16 firms and joint ventures applied for the two sections. Following evaluation by NHA\u2019s Procurement and Contracts (P&amp;CA) section, eight applicants were disqualified while eight were cleared for the next stage. The prequalified firms include SAJCO-ZKB (JV), China Construction Third Engineering Bureau Group Corporation Limited, SGEG-Umer Jan (JV), China 20 Bureau Group Company Limited, Onur Taahhut Tasimacilik Insaat Ticaret ve Sanayi, and Matracon-ZTZS (JV). The source material lists six names among the eight prequalified applicants. The M-6 is being developed in five sections: Hyderabad-Tando Adam, Tando Adam-Nawabshah, Nawabshah-Naushahro Feroze, Naushahro Feroze-Ranipur and Ranipur-Sukkur. Financing has been secured for three sections through international lenders, with the Islamic Development Bank financing Sections IV and V and the OPEC Fund committing financing for Section III. The remaining two sections are planned under the public-private partnership (PPP)&hellip;<\/p>\n","protected":false},"author":18,"featured_media":106326,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[63680,66836,29059,63963,75302,70331,75299,75301,1965,75303,6179,53132,61558,74662,63394,70400,61814,27303,75300,1683,75304,75298,64349],"persona":[],"class_list":["post-106376","post","type-post","status-publish","format-standard","has-post-thumbnail","category-development-projects","tag-hyderabad-sukkur-motorway","tag-islamic-development-bank","tag-karachi-lahore-motorway","tag-m-6-motorway","tag-m-6-project","tag-motorway-construction","tag-motorway-development","tag-motorway-network","tag-national-highway-authority","tag-naushahro-feroze-ranipur","tag-nha","tag-nha-projects","tag-north-south-motorway-network","tag-opec-fund","tag-pakistan-infrastructure","tag-pakistan-transport-infrastructure","tag-ppp-projects","tag-public-private-partnership","tag-ranipur-sukkur","tag-road-infrastructure","tag-section-iv","tag-section-v","tag-sindh-infrastructure","cat-20385-id"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v28.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NHA prequalification of eight firms M-6 project - Zameen News<\/title>\n<meta name=\"description\" content=\"The 306-kilometre greenfield M-6 is intended to complete the missing link in Pakistan\u2019s north-south motorway network, providing...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NHA prequalification of eight firms M-6 project - Zameen News\" \/>\n<meta property=\"og:description\" content=\"The 306-kilometre greenfield M-6 is intended to complete the missing link in Pakistan\u2019s north-south motorway network, providing...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2026-08-11T12:40:55+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2026-08-11T12:41:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2026\/08\/06160550\/Motorway4-1170x400-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NHA prequalification of eight firms M-6 project - Zameen News","description":"The 306-kilometre greenfield M-6 is intended to complete the missing link in Pakistan\u2019s north-south motorway network, providing...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html","og_locale":"en_US","og_type":"article","og_title":"NHA prequalification of eight firms M-6 project - Zameen News","og_description":"The 306-kilometre greenfield M-6 is intended to complete the missing link in Pakistan\u2019s north-south motorway network, providing...","og_url":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2026-08-11T12:40:55+00:00","article_modified_time":"2026-08-11T12:41:00+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2026\/08\/06160550\/Motorway4-1170x400-1.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/a3a8cc23079c627774ff19f42da24f1d"},"headline":"Hyderabad-Sukkur Motorway: NHA prequalification of eight firms","datePublished":"2026-08-11T12:40:55+00:00","dateModified":"2026-08-11T12:41:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html"},"wordCount":284,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2026\/08\/06160550\/Motorway4-1170x400-1.jpg","keywords":["Hyderabad-Sukkur Motorway","Islamic Development Bank","Karachi-Lahore Motorway","M-6 motorway","M-6 project","motorway construction","motorway development","motorway network","National Highway Authority","Naushahro Feroze-Ranipur","NHA","NHA projects","North-South Motorway network","OPEC Fund","Pakistan infrastructure","Pakistan transport infrastructure","PPP projects","public-private partnership","Ranipur-Sukkur","road infrastructure","Section IV","Section V","Sindh Infrastructure"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html","url":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html","name":"NHA prequalification of eight firms M-6 project - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2026\/08\/06160550\/Motorway4-1170x400-1.jpg","datePublished":"2026-08-11T12:40:55+00:00","dateModified":"2026-08-11T12:41:00+00:00","description":"The 306-kilometre greenfield M-6 is intended to complete the missing link in Pakistan\u2019s north-south motorway network, providing...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2026\/08\/06160550\/Motorway4-1170x400-1.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2026\/08\/06160550\/Motorway4-1170x400-1.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/nha-prequalification-of-eight-firms-m-6-project.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Hyderabad-Sukkur Motorway: NHA prequalification of eight firms"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/a3a8cc23079c627774ff19f42da24f1d","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/106376","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=106376"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/106376\/revisions"}],"predecessor-version":[{"id":106377,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/106376\/revisions\/106377"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/106326"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=106376"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=106376"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=106376"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=106376"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}