{"id":29830,"date":"2017-11-18T14:34:14","date_gmt":"2017-11-18T09:34:14","guid":{"rendered":"http:\/\/www.zameen.com\/blog\/?p=29830"},"modified":"2017-12-11T12:40:19","modified_gmt":"2017-12-11T07:40:19","slug":"gwadar-water-supply-line-55-work-completed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html","title":{"rendered":"Gwadar water supply line \u2013 55% work completed"},"content":{"rendered":"<p>Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will channel drinking water to industries, port area, areas included in the city\u2019s master plan, and city dwellings. The water supply will formally begin by June 2018.<\/p>\n<p>The project was approved by the Executive Committee of National Economic Council (ECNEC) in May 2015 with an estimated cost of PKR 11.39 billion. So far, a 37 kilometres long supply line for the project has been laid. In the meantime, a desalination plant is also planned to set up soon. The federal government initiated the project on its own to ensure its timely completion.<\/p>\n<p>For the Phase II of this project, under which a water line from Shadi Kor Dam and a sewerage treatment plant will be set up, the federal government is holding talks with China over project financing. The project\u2019s second phase will be initiated in January 2018 and is expected to be completed by June 2019.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will channel drinking water to industries, port area, areas included in the city\u2019s master plan, and city dwellings. The water supply will formally begin by June 2018. The project was approved by the Executive Committee of National Economic Council (ECNEC) in May 2015 with an estimated cost of PKR 11.39 billion. So far, a 37 kilometres long supply line for the project has been laid. In the meantime, a desalination plant is also planned to set up soon. The federal government initiated the project on its own to ensure its timely completion. For the Phase II of this project, under which a water line from Shadi Kor Dam and a sewerage treatment plant will be set up, the federal government is holding talks with China over project financing. The project\u2019s second phase will be initiated in January 2018 and is expected to be completed by June 2019.<\/p>\n","protected":false},"author":18,"featured_media":28789,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[4600],"persona":[],"class_list":{"0":"post-29830","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-details-on-gwadar-water-supply-line-project"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gwadar water supply line \u2013 55% work completed - Zameen News<\/title>\n<meta name=\"description\" content=\"Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gwadar water supply line \u2013 55% work completed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2017-11-18T09:34:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2017-12-11T07:40:19+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2017\/10\/gwadar-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gwadar water supply line \u2013 55% work completed - Zameen News","description":"Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html","og_locale":"en_US","og_type":"article","og_title":"Gwadar water supply line \u2013 55% work completed - Zameen News","og_description":"Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will","og_url":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2017-11-18T09:34:14+00:00","article_modified_time":"2017-12-11T07:40:19+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2017\/10\/gwadar-1.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Gwadar water supply line \u2013 55% work completed","datePublished":"2017-11-18T09:34:14+00:00","dateModified":"2017-12-11T07:40:19+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html"},"wordCount":173,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2017\/10\/gwadar-1.jpg","keywords":["details on Gwadar water supply line project"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html","url":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html","name":"Gwadar water supply line \u2013 55% work completed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2017\/10\/gwadar-1.jpg","datePublished":"2017-11-18T09:34:14+00:00","dateModified":"2017-12-11T07:40:19+00:00","description":"Gwadar: Development work on Phase I of the Gwadar Water Supply Line Project has been 55% completed according to a news source. The supply line will","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2017\/10\/gwadar-1.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2017\/10\/gwadar-1.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/gwadar-water-supply-line-55-work-completed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Gwadar water supply line \u2013 55% work completed"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/29830","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=29830"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/29830\/revisions"}],"predecessor-version":[{"id":29831,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/29830\/revisions\/29831"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/28789"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=29830"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=29830"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=29830"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=29830"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}