{"id":35529,"date":"2018-03-05T12:39:56","date_gmt":"2018-03-05T07:39:56","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=35529"},"modified":"2018-03-05T14:17:18","modified_gmt":"2018-03-05T09:17:18","slug":"12-km-section-of-olmt-track-completed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html","title":{"rendered":"12-km section of OLMT track completed"},"content":{"rendered":"<p><img loading=\"lazy\" decoding=\"async\" class=\"size-full wp-image-35530 aligncenter\" src=\"https:\/\/www.zameen.com\/blog\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg\" alt=\"\" width=\"600\" height=\"350\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg 600w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1-300x175.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1-537x313.jpg 537w\" sizes=\"auto, (max-width: 600px) 100vw, 600px\" \/><\/p>\n<p>Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to McLeod Road, according to a news report. Punjab Chief Minister\u2019s Adviser and OLMT Steering Committee Chairman Khawaja Ahmad Hassan told reporters while overseeing the launch that the locally manufactured structures each weighed 26 tons, and were 30 metres in length and 5.5 metres in width.<\/p>\n<p>A total of 670 U-tub girders were launched at a height of 40 metres for construction of the viaduct for the rolling stock. He also added that the laying of the metallic track for the train as well as the electrical and mechanical work on the remaining seven stations along this route would start soon, and the viaduct would be functional for train movement within this month. He also stated that work on the first four stations at Dera Gujjran, Mehmmod Booti, Islam Park, and Salamat Pura was near completion and testing of the track by test runs of the train were already underway. The construction of track near other heritage sites had also been accomplished after permission was granted.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to McLeod Road, according to a news report. Punjab Chief Minister\u2019s Adviser and OLMT Steering Committee Chairman Khawaja Ahmad Hassan told reporters while overseeing the launch that the locally manufactured structures each weighed 26 tons, and were 30 metres in length and 5.5 metres in width. A total of 670 U-tub girders were launched at a height of 40 metres for construction of the viaduct for the rolling stock. He also added that the laying of the metallic track for the train as well as the electrical and mechanical work on the remaining seven stations along this route would start soon, and the viaduct would be functional for train movement within this month. He also stated that work on the first four stations at Dera Gujjran, Mehmmod Booti, Islam Park, and Salamat Pura was near completion and testing of the track by test runs of the train were already underway. The construction of track near other heritage sites had also been accomplished after permission was granted.<\/p>\n","protected":false},"author":58,"featured_media":35530,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[447,4455,39,2176,5588],"persona":[],"class_list":["post-35529","post","type-post","status-publish","format-standard","has-post-thumbnail","tag-development","tag-infrastructure","tag-lahore","tag-metro-train-project","tag-public-transport"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>12-km section of OLMT track completed - Zameen News<\/title>\n<meta name=\"description\" content=\"Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"12-km section of OLMT track completed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:author\" content=\"atif_zameen_dev\" \/>\n<meta property=\"article:published_time\" content=\"2018-03-05T07:39:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2018-03-05T09:17:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shanzay Asim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shanzay Asim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"12-km section of OLMT track completed - Zameen News","description":"Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html","og_locale":"en_US","og_type":"article","og_title":"12-km section of OLMT track completed - Zameen News","og_description":"Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to","og_url":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_author":"atif_zameen_dev","article_published_time":"2018-03-05T07:39:56+00:00","article_modified_time":"2018-03-05T09:17:18+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg","type":"image\/jpeg"}],"author":"Shanzay Asim","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Shanzay Asim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html"},"author":{"name":"Shanzay Asim","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/dc09f6a56ad726f905dc04521368fd45"},"headline":"12-km section of OLMT track completed","datePublished":"2018-03-05T07:39:56+00:00","dateModified":"2018-03-05T09:17:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html"},"wordCount":192,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg","keywords":["development","infrastructure","Lahore","Metro train project","public transport"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html","url":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html","name":"12-km section of OLMT track completed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg","datePublished":"2018-03-05T07:39:56+00:00","dateModified":"2018-03-05T09:17:18+00:00","description":"Lahore: On Sunday, OLMT\u2019s U-tub girders at Lakshmi Chowk were launched, completing the construction of a 12 km long elevated track from Dera Gujjran to","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/03\/orange-test-1.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/12-km-section-of-olmt-track-completed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"12-km section of OLMT track completed"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/dc09f6a56ad726f905dc04521368fd45","name":"Shanzay Asim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","caption":"Shanzay Asim"},"description":"Shanzay Asim is a content developer at Zameen.com.","sameAs":["atif_zameen_dev"],"url":"https:\/\/www.zameen.com\/news\/author\/shanzay-asim"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/35529","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=35529"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/35529\/revisions"}],"predecessor-version":[{"id":35531,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/35529\/revisions\/35531"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/35530"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=35529"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=35529"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=35529"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=35529"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}