{"id":39319,"date":"2018-06-21T10:30:54","date_gmt":"2018-06-21T05:30:54","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=39319"},"modified":"2018-06-20T17:12:36","modified_gmt":"2018-06-20T12:12:36","slug":"trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html","title":{"rendered":"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days"},"content":{"rendered":"<p>Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of electricity. According to the contractual requirements, this unit will initially be run on a 3-day trial period, followed by a 30-day reliability period, only after which will it continuously generate power.<\/p>\n<p>The project\u2019s Unit no. 4 started operating during April this year and has since then injected more than 242.25 MW of electricity to the national grid. After the contractual obligations are completed, the contribution of Neelum-Jhelum Hydropower to the national grid from these units will be doubled from 242.25 MW to 484.5 MW.<\/p>\n<p>When operating at full capacity, the project will have a power generation capacity of 969 MW, with each unit producing 242.25 MW of electricity.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of electricity. According to the contractual requirements, this unit will initially be run on a 3-day trial period, followed by a 30-day reliability period, only after which will it continuously generate power. The project\u2019s Unit no. 4 started operating during April this year and has since then injected more than 242.25 MW of electricity to the national grid. After the contractual obligations are completed, the contribution of Neelum-Jhelum Hydropower to the national grid from these units will be doubled from 242.25 MW to 484.5 MW. When operating at full capacity, the project will have a power generation capacity of 969 MW, with each unit producing 242.25 MW of electricity.<\/p>\n","protected":false},"author":60,"featured_media":34311,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[7093,7092,6967,7091],"persona":[],"class_list":{"0":"post-39319","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-969-mw","8":"tag-capacity","9":"tag-dam","10":"tag-neelum-jhelum-hydropower-project"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days - Zameen News<\/title>\n<meta name=\"description\" content=\"Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:author\" content=\"atif_zameen_dev\" \/>\n<meta property=\"article:published_time\" content=\"2018-06-21T05:30:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/02\/neelum.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Remshay Ahmed\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Remshay Ahmed\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days - Zameen News","description":"Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html","og_locale":"en_US","og_type":"article","og_title":"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days - Zameen News","og_description":"Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of","og_url":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_author":"atif_zameen_dev","article_published_time":"2018-06-21T05:30:54+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/02\/neelum.jpg","type":"image\/jpeg"}],"author":"Remshay Ahmed","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Remshay Ahmed","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html"},"author":{"name":"Remshay Ahmed","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/cfc3d69aebeb90a0ffde221845ecf8d3"},"headline":"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days","datePublished":"2018-06-21T05:30:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html"},"wordCount":138,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/02\/neelum.jpg","keywords":["969 MW","capacity","dam","Neelum Jhelum Hydropower Project"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html","url":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html","name":"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/02\/neelum.jpg","datePublished":"2018-06-21T05:30:54+00:00","description":"Mirpur: The second unit of the Neelum-Jhelum Hydropower Project has started operating, reported a news source. This project will generate 242.25 MW of","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/02\/neelum.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/02\/neelum.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/trial-run-of-neelum-jhelums-2nd-unit-starts-power-generation-expected-in-30-days.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Trial run of Neelum-Jhelum\u2019s 2nd unit starts, power generation expected in 30 days"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/cfc3d69aebeb90a0ffde221845ecf8d3","name":"Remshay Ahmed","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/84e30f2f9af7afe0702e5c8da4e2026cc9c1ec2e14d1497fd4676bf606e48062?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/84e30f2f9af7afe0702e5c8da4e2026cc9c1ec2e14d1497fd4676bf606e48062?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/84e30f2f9af7afe0702e5c8da4e2026cc9c1ec2e14d1497fd4676bf606e48062?s=96&d=mm&r=g","caption":"Remshay Ahmed"},"description":"Remshay Ahmed is a content developer at Zameen.com","sameAs":["https:\/\/www.zameen.com","atif_zameen_dev"],"url":"https:\/\/www.zameen.com\/news\/author\/remshay"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/39319","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/60"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=39319"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/39319\/revisions"}],"predecessor-version":[{"id":39320,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/39319\/revisions\/39320"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/34311"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=39319"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=39319"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=39319"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=39319"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}