{"id":42441,"date":"2018-09-25T09:31:52","date_gmt":"2018-09-25T04:31:52","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=42441"},"modified":"2018-09-25T09:31:52","modified_gmt":"2018-09-25T04:31:52","slug":"wapda-completes-pakistans-highest-transmission-line-project","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html","title":{"rendered":"Wapda completes Pakistan\u2019s highest transmission line project"},"content":{"rendered":"<p>Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting transmission lines in Golen Gol in Chitral to Timergara in Lower Dir, reported a news source. As many as 706 towers were installed for evacuation of power generated by Golen Gol Hydro Project to the national grid station.<\/p>\n<p>The 180-kilometre long Golen Gol-Timergara transmission line pass through mountainous terrain having extreme weather conditions. For this purpose, 706 transmission towers, were erected in the snow clad mountains. These mountains also include Lowari Top that is located at a height of 10,312 feet.<\/p>\n<p>The project is so far the most difficult one in Pakistan where the transmission towers at such high altitude had never been erected before.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting transmission lines in Golen Gol in Chitral to Timergara in Lower Dir, reported a news source. As many as 706 towers were installed for evacuation of power generated by Golen Gol Hydro Project to the national grid station. The 180-kilometre long Golen Gol-Timergara transmission line pass through mountainous terrain having extreme weather conditions. For this purpose, 706 transmission towers, were erected in the snow clad mountains. These mountains also include Lowari Top that is located at a height of 10,312 feet. The project is so far the most difficult one in Pakistan where the transmission towers at such high altitude had never been erected before.<\/p>\n","protected":false},"author":18,"featured_media":42442,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[8294],"persona":[],"class_list":{"0":"post-42441","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-details-on-wapda-completes-pakistans-highest-transmission-line-project"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Wapda completes Pakistan\u2019s highest transmission line project - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Wapda completes Pakistan\u2019s highest transmission line project - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2018-09-25T04:31:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/09\/wapda.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Wapda completes Pakistan\u2019s highest transmission line project - Zameen News","description":"Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html","og_locale":"en_US","og_type":"article","og_title":"Wapda completes Pakistan\u2019s highest transmission line project - Zameen News","og_description":"Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting","og_url":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2018-09-25T04:31:52+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/09\/wapda.png","type":"image\/png"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/a3a8cc23079c627774ff19f42da24f1d"},"headline":"Wapda completes Pakistan\u2019s highest transmission line project","datePublished":"2018-09-25T04:31:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html"},"wordCount":132,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/09\/wapda.png","keywords":["details on Wapda completes Pakistan\u2019s highest transmission line project"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html","url":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html","name":"Wapda completes Pakistan\u2019s highest transmission line project - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/09\/wapda.png","datePublished":"2018-09-25T04:31:52+00:00","description":"Islamabad: Water and Power Development Authority (WAPDA) has completed one of the world\u2019s highest and most difficult transmission line projects connecting","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/09\/wapda.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/09\/wapda.png","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/wapda-completes-pakistans-highest-transmission-line-project.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Wapda completes Pakistan\u2019s highest transmission line project"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/a3a8cc23079c627774ff19f42da24f1d","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/42441","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=42441"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/42441\/revisions"}],"predecessor-version":[{"id":42443,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/42441\/revisions\/42443"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/42442"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=42441"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=42441"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=42441"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=42441"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}