{"id":43940,"date":"2018-11-09T12:26:04","date_gmt":"2018-11-09T07:26:04","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=43940"},"modified":"2018-11-09T12:26:04","modified_gmt":"2018-11-09T07:26:04","slug":"database-system-of-power-sector-finalised-for-22-years","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html","title":{"rendered":"Database system of power sector finalised for 22 years"},"content":{"rendered":"<p>Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government, according to a news source. This database system covers both power generation and transmission up to 2040 and will be submitted in a few weeks to National Electric Power Regulator Authority (NEPRA).<\/p>\n<p>This was revealed by Secretary Power Division Irfan Ali at a meeting of Senate Standing Committee on Power. This meeting was presided over by Senator Fida Muhammad and was also attended by Power Minister Omer Ayub. Ali stated that more focus was required on transmission rather than just on power generation as the installed capacity is 32,000 MW, while the dependable capacity is 26,000 MW. However, the transmission system\u2019s maximum capacity is only 20,000-21,000 MW and the defaulted bills amount to PKR 900 billion.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government, according to a news source. This database system covers both power generation and transmission up to 2040 and will be submitted in a few weeks to National Electric Power Regulator Authority (NEPRA). This was revealed by Secretary Power Division Irfan Ali at a meeting of Senate Standing Committee on Power. This meeting was presided over by Senator Fida Muhammad and was also attended by Power Minister Omer Ayub. Ali stated that more focus was required on transmission rather than just on power generation as the installed capacity is 32,000 MW, while the dependable capacity is 26,000 MW. However, the transmission system\u2019s maximum capacity is only 20,000-21,000 MW and the defaulted bills amount to PKR 900 billion.<\/p>\n","protected":false},"author":58,"featured_media":14890,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[8832,8831,8833],"persona":[],"class_list":{"0":"post-43940","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-generation","8":"tag-power","9":"tag-transmission"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Database system of power sector finalised for 22 years - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government,\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Database system of power sector finalised for 22 years - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government,\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:author\" content=\"atif_zameen_dev\" \/>\n<meta property=\"article:published_time\" content=\"2018-11-09T07:26:04+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2015\/07\/Water-and-Power-ministry.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shanzay Asim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shanzay Asim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Database system of power sector finalised for 22 years - Zameen News","description":"Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government,","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html","og_locale":"en_US","og_type":"article","og_title":"Database system of power sector finalised for 22 years - Zameen News","og_description":"Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government,","og_url":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_author":"atif_zameen_dev","article_published_time":"2018-11-09T07:26:04+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2015\/07\/Water-and-Power-ministry.jpg","type":"image\/jpeg"}],"author":"Shanzay Asim","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Shanzay Asim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html"},"author":{"name":"Shanzay Asim","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/32f7a47cf2283e1bb9d09fca10cd6b74"},"headline":"Database system of power sector finalised for 22 years","datePublished":"2018-11-09T07:26:04+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html"},"wordCount":146,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2015\/07\/Water-and-Power-ministry.jpg","keywords":["generation","power","transmission"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html","url":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html","name":"Database system of power sector finalised for 22 years - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2015\/07\/Water-and-Power-ministry.jpg","datePublished":"2018-11-09T07:26:04+00:00","description":"Islamabad: For the first time in history, a database system for the power sector has been finalised for the next 22 years by the federal government,","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2015\/07\/Water-and-Power-ministry.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2015\/07\/Water-and-Power-ministry.jpg","width":600,"height":350,"caption":"Water-and-Power-ministry"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/database-system-of-power-sector-finalised-for-22-years.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Database system of power sector finalised for 22 years"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/32f7a47cf2283e1bb9d09fca10cd6b74","name":"Shanzay Asim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","caption":"Shanzay Asim"},"description":"Shanzay Asim is a content developer at Zameen.com.","sameAs":["atif_zameen_dev"],"url":"https:\/\/www.zameen.com\/news\/author\/shanzay-asim"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/43940","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=43940"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/43940\/revisions"}],"predecessor-version":[{"id":43941,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/43940\/revisions\/43941"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/14890"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=43940"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=43940"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=43940"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=43940"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}