{"id":47887,"date":"2019-01-23T14:28:06","date_gmt":"2019-01-23T09:28:06","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=47887"},"modified":"2019-01-23T14:35:54","modified_gmt":"2019-01-23T09:35:54","slug":"darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html","title":{"rendered":"Darra-Peshawar gas pipeline to be completed ahead of schedule"},"content":{"rendered":"<p>Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will help resolve low gas pressure issues in almost one-half of the city.<\/p>\n<p>The 16-inch diameter pipeline directly links gas fields in the southern district of KP with Peshawar. It is expected to be completed by next week. The PKR 560 million project was originally scheduled for operation by June 2019.<\/p>\n<p>The pipeline will help resolve gas pressure problems in areas like University Town, Hayatabad, and Regi Model Town. It can even be extended to provide gas to consumers living in the tribal districts of Khyber.<\/p>\n<p>Read:\u00a0<a href=\"https:\/\/www.zameen.com\/blog\/govt-launches-gas-supply-project-in-lower-dir.html\" target=\"_blank\" rel=\"noopener noreferrer\">Govt launches gas supply project in Lower Dir<\/a><\/p>\n<p>A similar, 16-inch diameter pipeline running 8.1 kilometres will provide gas to Hayatabad industrial estate. The PKR 160 million project is expected to improve the operation of the existing gas system.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will help resolve low gas pressure issues in almost one-half of the city. The 16-inch diameter pipeline directly links gas fields in the southern district of KP with Peshawar. It is expected to be completed by next week. The PKR 560 million project was originally scheduled for operation by June 2019. The pipeline will help resolve gas pressure problems in areas like University Town, Hayatabad, and Regi Model Town. It can even be extended to provide gas to consumers living in the tribal districts of Khyber. Read:\u00a0Govt launches gas supply project in Lower Dir A similar, 16-inch diameter pipeline running 8.1 kilometres will provide gas to Hayatabad industrial estate. The PKR 160 million project is expected to improve the operation of the existing gas system.<\/p>\n","protected":false},"author":57,"featured_media":33484,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[10060],"persona":[],"class_list":{"0":"post-47887","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Darra-Peshawar gas pipeline to be completed ahead of schedule - Zameen News<\/title>\n<meta name=\"description\" content=\"Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Darra-Peshawar gas pipeline to be completed ahead of schedule - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-01-23T09:28:06+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-01-23T09:35:54+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/01\/gas-supply-2.png\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Muhammad Farhad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Farhad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Darra-Peshawar gas pipeline to be completed ahead of schedule - Zameen News","description":"Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html","og_locale":"en_US","og_type":"article","og_title":"Darra-Peshawar gas pipeline to be completed ahead of schedule - Zameen News","og_description":"Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will","og_url":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-01-23T09:28:06+00:00","article_modified_time":"2019-01-23T09:35:54+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/01\/gas-supply-2.png","type":"image\/png"}],"author":"Muhammad Farhad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Farhad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html"},"author":{"name":"Muhammad Farhad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9"},"headline":"Darra-Peshawar gas pipeline to be completed ahead of schedule","datePublished":"2019-01-23T09:28:06+00:00","dateModified":"2019-01-23T09:35:54+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html"},"wordCount":158,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/01\/gas-supply-2.png","keywords":["Darra-Peshawar gas pipeline to be completed ahead of schedule"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html","url":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html","name":"Darra-Peshawar gas pipeline to be completed ahead of schedule - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/01\/gas-supply-2.png","datePublished":"2019-01-23T09:28:06+00:00","dateModified":"2019-01-23T09:35:54+00:00","description":"Peshawar: Work on the gas supply line from Darra Adamkhel to Peshawar is set to be completed ahead of schedule, a news source reported. The 32km line will","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/01\/gas-supply-2.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/01\/gas-supply-2.png","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/darra-peshawar-gas-pipeline-to-be-completed-ahead-of-schedule.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Darra-Peshawar gas pipeline to be completed ahead of schedule"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9","name":"Muhammad Farhad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","caption":"Muhammad Farhad"},"description":"Muhammad Farhad is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/farhad-hassan"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/47887","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=47887"}],"version-history":[{"count":2,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/47887\/revisions"}],"predecessor-version":[{"id":47894,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/47887\/revisions\/47894"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/33484"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=47887"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=47887"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=47887"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=47887"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}