{"id":53921,"date":"2019-07-26T14:42:42","date_gmt":"2019-07-26T09:42:42","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=53921"},"modified":"2019-07-26T14:43:00","modified_gmt":"2019-07-26T09:43:00","slug":"work-ml-1-begin-by-end-2019-rasheed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html","title":{"rendered":"Work on ML-1 to begin by end of 2019: Rasheed"},"content":{"rendered":"<p>Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that they have already completed the feasibility study and other require paperwork in order to lay down this fast-track system in three phases.<\/p>\n<p><strong>Read<\/strong>:\u00a0<a href=\"https:\/\/www.zameen.com\/news\/railways-ministry-finalises-pc-1-for-ml-1-project.html\" target=\"_blank\" rel=\"noopener noreferrer\">Railways Ministry finalises PC-1 for ML-1 project<\/a><\/p>\n<p>Rasheed also revealed that he has a meeting scheduled with Prime Minister (PM) Imran Khan for the coming Monday. He added that they will discuss the solution to the bureaucratic impediments faced by the <a href=\"https:\/\/www.zameen.com\/news\/railways-orders-local-bodies-to-ensure-cleanliness-along-train-tracks.html\" target=\"_blank\" rel=\"noopener noreferrer\">Railways Ministry <\/a>pertaining to the ML-1 project.<\/p>\n<p>The minister also expressed his concerns regarding railway signals. He said that around 2,500 railway signals were functioning without guards. He added that a review of the system was required in order to resolve this issue.<\/p>\n<p><strong>Read<\/strong>:\u00a0<a href=\"https:\/\/www.zameen.com\/news\/gwadars-development-construction-of-economic-zones-ml-1-on-priority.html\" target=\"_blank\" rel=\"noopener noreferrer\">Gwadar\u2019s development, construction of economic zones, ML-1 on priority<\/a><\/p>\n<p>The ML-1 is a 1,800-kilometre-long dual railway track that will be constructed under the China-Pakistan Economic Corridor (CPEC) initiative. Once completed, the ML-1 will cut down the commute time between Rawalpindi and Karachi to 10 hours.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that they have already completed the feasibility study and other require paperwork in order to lay down this fast-track system in three phases. Read:\u00a0Railways Ministry finalises PC-1 for ML-1 project Rasheed also revealed that he has a meeting scheduled with Prime Minister (PM) Imran Khan for the coming Monday. He added that they will discuss the solution to the bureaucratic impediments faced by the Railways Ministry pertaining to the ML-1 project. The minister also expressed his concerns regarding railway signals. He said that around 2,500 railway signals were functioning without guards. He added that a review of the system was required in order to resolve this issue. Read:\u00a0Gwadar\u2019s development, construction of economic zones, ML-1 on priority The ML-1 is a 1,800-kilometre-long dual railway track that will be constructed under the China-Pakistan Economic Corridor (CPEC) initiative. Once completed, the ML-1 will cut down the commute time between Rawalpindi and Karachi to 10 hours.<\/p>\n","protected":false},"author":68,"featured_media":44073,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[12386],"persona":[],"class_list":{"0":"post-53921","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-details-on-work-on-ml-1-to-begin-by-end-of-2019-rasheed"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Work on ML-1 to begin by end of 2019: Rasheed - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work on ML-1 to begin by end of 2019: Rasheed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-26T09:42:42+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-07-26T09:43:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/11\/ML-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Safina Sultan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Safina Sultan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work on ML-1 to begin by end of 2019: Rasheed - Zameen News","description":"Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html","og_locale":"en_US","og_type":"article","og_title":"Work on ML-1 to begin by end of 2019: Rasheed - Zameen News","og_description":"Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that","og_url":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-07-26T09:42:42+00:00","article_modified_time":"2019-07-26T09:43:00+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/11\/ML-1.jpg","type":"image\/jpeg"}],"author":"Safina Sultan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Safina Sultan","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html"},"author":{"name":"Safina Sultan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0f7ad58ef43a9c16d70bfd31d586f512"},"headline":"Work on ML-1 to begin by end of 2019: Rasheed","datePublished":"2019-07-26T09:42:42+00:00","dateModified":"2019-07-26T09:43:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html"},"wordCount":187,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/11\/ML-1.jpg","keywords":["details on Work on ML-1 to begin by end of 2019: Rasheed"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html","url":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html","name":"Work on ML-1 to begin by end of 2019: Rasheed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/11\/ML-1.jpg","datePublished":"2019-07-26T09:42:42+00:00","dateModified":"2019-07-26T09:43:00+00:00","description":"Islamabad: Minster for Railways Sheikh Rasheed assured that work on the ML-1 project will begin by the end of 2019, a news source reported. He added that","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/11\/ML-1.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/11\/ML-1.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/work-ml-1-begin-by-end-2019-rasheed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Work on ML-1 to begin by end of 2019: Rasheed"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0f7ad58ef43a9c16d70bfd31d586f512","name":"Safina Sultan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/41ef23ce0eab3597842e7f43d50bc919f73ac1f4e11afa5f19ca36f6e55f832f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/41ef23ce0eab3597842e7f43d50bc919f73ac1f4e11afa5f19ca36f6e55f832f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/41ef23ce0eab3597842e7f43d50bc919f73ac1f4e11afa5f19ca36f6e55f832f?s=96&d=mm&r=g","caption":"Safina Sultan"},"description":"Safina Sultan is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/safina"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53921","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=53921"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53921\/revisions"}],"predecessor-version":[{"id":53922,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53921\/revisions\/53922"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/44073"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=53921"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=53921"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=53921"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=53921"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}