{"id":53932,"date":"2019-07-27T10:00:52","date_gmt":"2019-07-27T10:00:52","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=53932"},"modified":"2020-01-27T05:53:13","modified_gmt":"2020-01-27T05:53:13","slug":"construction-work-multan-sukkur-motorway-completed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html","title":{"rendered":"Construction work on Multan-Sukkur Motorway completed"},"content":{"rendered":"<p>Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long Sukkar-Multan Motorway (M-5), has been completed, a news source reported. The National Highway Authority (NHA) recently presented the Chinese construction firm, the China State Construction Engineering Corporation (CSCEC) which worked on the project, with a substantial completion certification.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/m-5-to-get-its-by-august.html\" target=\"_blank\" rel=\"noopener noreferrer\">M-5 to get ITS by August<\/a><\/p>\n<p>The M-5 project is part of the Peshawar-Karachi Motorway and is designed to allow a vehicle speed of 120 kilometres per hour. This facility was recently completed,<a href=\"https:\/\/www.zameen.com\/news\/multan-sukkur-motorway-completed-by-83.html\" target=\"_blank\" rel=\"noopener noreferrer\"> two weeks ahead of its deadline<\/a>, at a total cost of USD 2.89 billion.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/lahore-sialkot-motorway-completed-by-61.html\" target=\"_blank\" rel=\"noopener noreferrer\">Lahore-Sialkot motorway completed by 61%<\/a><\/p>\n<p>During a ceremony held in Multan, M-5 General Manager Muhammad Nassem Arif said that the motorway was an impressive construction, in terms of quality and engineering. He said that the NHA had collaborate with the CSCEC to complete the project ahead of its deadline fixed for three years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long Sukkar-Multan Motorway (M-5), has been completed, a news source reported. The National Highway Authority (NHA) recently presented the Chinese construction firm, the China State Construction Engineering Corporation (CSCEC) which worked on the project, with a substantial completion certification. Read:\u00a0M-5 to get ITS by August The M-5 project is part of the Peshawar-Karachi Motorway and is designed to allow a vehicle speed of 120 kilometres per hour. This facility was recently completed, two weeks ahead of its deadline, at a total cost of USD 2.89 billion. Read:\u00a0Lahore-Sialkot motorway completed by 61% During a ceremony held in Multan, M-5 General Manager Muhammad Nassem Arif said that the motorway was an impressive construction, in terms of quality and engineering. He said that the NHA had collaborate with the CSCEC to complete the project ahead of its deadline fixed for three years.<\/p>\n","protected":false},"author":75,"featured_media":45668,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15012,15013],"tags":[12390],"persona":[],"class_list":{"0":"post-53932","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-allied-industries","8":"category-construction","9":"tag-details-on-construction-work-on-multan-sukkur-motorway-completed","10":"cat-15012-id","11":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction work on Multan-Sukkur Motorway completed - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction work on Multan-Sukkur Motorway completed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-27T10:00:52+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-27T05:53:13+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/12\/Multan-Sukkur-Motorway.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hazafa Hasan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hazafa Hasan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction work on Multan-Sukkur Motorway completed - Zameen News","description":"Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html","og_locale":"en_US","og_type":"article","og_title":"Construction work on Multan-Sukkur Motorway completed - Zameen News","og_description":"Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long","og_url":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-07-27T10:00:52+00:00","article_modified_time":"2020-01-27T05:53:13+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/12\/Multan-Sukkur-Motorway.jpg","type":"image\/jpeg"}],"author":"Hazafa Hasan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Hazafa Hasan","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html"},"author":{"name":"Hazafa Hasan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b"},"headline":"Construction work on Multan-Sukkur Motorway completed","datePublished":"2019-07-27T10:00:52+00:00","dateModified":"2020-01-27T05:53:13+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html"},"wordCount":157,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/12\/Multan-Sukkur-Motorway.jpg","keywords":["details on Construction work on Multan-Sukkur Motorway completed"],"articleSection":["Allied Industries","Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html","url":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html","name":"Construction work on Multan-Sukkur Motorway completed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/12\/Multan-Sukkur-Motorway.jpg","datePublished":"2019-07-27T10:00:52+00:00","dateModified":"2020-01-27T05:53:13+00:00","description":"Islamabad: The construction of the \u2018largest transportation infrastructure\u2019 under the China-Pakistan-Economic-Corridor (CPEC), the 392-kilometre-long","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/12\/Multan-Sukkur-Motorway.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/12\/Multan-Sukkur-Motorway.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Construction work on Multan-Sukkur Motorway completed"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b","name":"Hazafa Hasan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","caption":"Hazafa Hasan"},"description":"Hazafa reveres the art of writing and has been turned into a property enthusiast by profession. Her daily survival kit includes; tea, coffee, keyboard and paperbacks.","url":"https:\/\/www.zameen.com\/news\/author\/hazafa"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53932","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/75"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=53932"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53932\/revisions"}],"predecessor-version":[{"id":53933,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53932\/revisions\/53933"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/45668"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=53932"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=53932"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=53932"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=53932"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}