{"id":53959,"date":"2019-07-27T10:08:17","date_gmt":"2019-07-27T05:08:17","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=53959"},"modified":"2019-07-26T18:14:10","modified_gmt":"2019-07-26T13:14:10","slug":"tarbela-extension-hydropower-project-attains-maximum-generation-capacity","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html","title":{"rendered":"Tarbela Extension Hydropower Project attains maximum generation capacity"},"content":{"rendered":"<p>Lahore: The Tarbela 4<sup>th<\/sup> Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW) contribution to the national grid, according to a news source.<\/p>\n<p>This benchmark was set due to the increased water level in the dam\u2019s reservoir and the enhanced volume of river flows observed this season.<\/p>\n<p>The project is physically situated in <a href=\"https:\/\/www.zameen.com\/news\/tarbela-dams-tunnel-4-to-be-expanded.html\" target=\"_blank\" rel=\"noopener noreferrer\">Tunnel No. 4 \u2013Tarbela Dam<\/a>, and features three generating units with a production capacity of 470 MW each. With this extension, the total generation capacity of Tarbela dam has increased from 3,478 MW to 4,888 MW.<\/p>\n<p>Wapda Chairman Lieutenant-General (retired) Muzammil Hussain congratulated the Tarbela Dam authorities on this achievement, and commended the project\u2019s engineers, specifically .<\/p>\n<p>This project has been termed as one of the Water and Power Development Authority\u2019s (WAPDA\u2019s) flagship undertakings; having gone into commission in February 2018, and made completely operational by the middle of 2018.<\/p>\n<p>So far, it has contributed up to 3.14 billion units of low-cost hydel electricity to the national grid<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: The Tarbela 4th Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW) contribution to the national grid, according to a news source. This benchmark was set due to the increased water level in the dam\u2019s reservoir and the enhanced volume of river flows observed this season. The project is physically situated in Tunnel No. 4 \u2013Tarbela Dam, and features three generating units with a production capacity of 470 MW each. With this extension, the total generation capacity of Tarbela dam has increased from 3,478 MW to 4,888 MW. Wapda Chairman Lieutenant-General (retired) Muzammil Hussain congratulated the Tarbela Dam authorities on this achievement, and commended the project\u2019s engineers, specifically . This project has been termed as one of the Water and Power Development Authority\u2019s (WAPDA\u2019s) flagship undertakings; having gone into commission in February 2018, and made completely operational by the middle of 2018. So far, it has contributed up to 3.14 billion units of low-cost hydel electricity to the national grid<\/p>\n","protected":false},"author":58,"featured_media":41521,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[5418],"persona":[],"class_list":{"0":"post-53959","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-tarbela-dam"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tarbela Extension Hydropower Project attains maximum generation capacity - Zameen News<\/title>\n<meta name=\"description\" content=\"Lahore: The Tarbela 4th Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW)\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tarbela Extension Hydropower Project attains maximum generation capacity - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Lahore: The Tarbela 4th Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:author\" content=\"atif_zameen_dev\" \/>\n<meta property=\"article:published_time\" content=\"2019-07-27T05:08:17+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Shanzay Asim\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Shanzay Asim\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tarbela Extension Hydropower Project attains maximum generation capacity - Zameen News","description":"Lahore: The Tarbela 4th Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW)","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html","og_locale":"en_US","og_type":"article","og_title":"Tarbela Extension Hydropower Project attains maximum generation capacity - Zameen News","og_description":"Lahore: The Tarbela 4th Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW)","og_url":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_author":"atif_zameen_dev","article_published_time":"2019-07-27T05:08:17+00:00","og_image":[{"width":800,"height":480,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","type":"image\/jpeg"}],"author":"Shanzay Asim","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Shanzay Asim","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html"},"author":{"name":"Shanzay Asim","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/32f7a47cf2283e1bb9d09fca10cd6b74"},"headline":"Tarbela Extension Hydropower Project attains maximum generation capacity","datePublished":"2019-07-27T05:08:17+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html"},"wordCount":172,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","keywords":["Tarbela Dam"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html","url":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html","name":"Tarbela Extension Hydropower Project attains maximum generation capacity - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","datePublished":"2019-07-27T05:08:17+00:00","description":"Lahore: The Tarbela 4th Extension Hydropower Project attained its maximum installed generation capacity on Thursday \u2013 amounting to a 1,410 Megawatt (MW)","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","width":800,"height":480},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/tarbela-extension-hydropower-project-attains-maximum-generation-capacity.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Tarbela Extension Hydropower Project attains maximum generation capacity"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/32f7a47cf2283e1bb9d09fca10cd6b74","name":"Shanzay Asim","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/d48096a6a4132dfadc6dec92fed23d238b12d0d1ae004dec64919017069f6321?s=96&d=mm&r=g","caption":"Shanzay Asim"},"description":"Shanzay Asim is a content developer at Zameen.com.","sameAs":["atif_zameen_dev"],"url":"https:\/\/www.zameen.com\/news\/author\/shanzay-asim"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53959","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/58"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=53959"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53959\/revisions"}],"predecessor-version":[{"id":53960,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/53959\/revisions\/53960"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/41521"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=53959"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=53959"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=53959"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=53959"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}