{"id":54402,"date":"2019-08-16T13:03:10","date_gmt":"2019-08-16T08:03:10","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=54402"},"modified":"2019-08-16T13:03:21","modified_gmt":"2019-08-16T08:03:21","slug":"construction-chakdara-chitral-expressway-expected-soon","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html","title":{"rendered":"Construction of Chakdara-Chitral Expressway expected soon"},"content":{"rendered":"<p>Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be setting the foundation stone of the Chakdara-Chitral Expressway soon, a news source reported. This project comes under the <a href=\"https:\/\/www.zameen.com\/news\/three-cpec-projects-inaugurated-soon.html\" target=\"_blank\" rel=\"noopener noreferrer\">China-Pakistan Economic Corridor<\/a> (CPEC) mega-project. This announcement was made during the CM\u2019s recent visit to Timergara for the inauguration of a number of buildings.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/construction-work-multan-sukkur-motorway-completed.html\" target=\"_blank\" rel=\"noopener noreferrer\">Construction work on Multan-Sukkur Motorway completed<\/a><\/p>\n<p>CM Khan had previously ordered special focus on all projects related to CPEC and had instructed all relevant departments to accelerate work on them.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/kp-cm-orders-timely-completion-infrastructure-projects.html\" target=\"_blank\" rel=\"noopener noreferrer\">KP CM orders timely completion of infrastructure projects<\/a><\/p>\n<p>This road from Chakdara to Shandur through Chitral has been approved by the Executive Committee of National Economic Council (ECNEC). The National Highway Authority (NHA) has planned to spend approximately PKR 17.5 million on the construction of this project. The expressway will consist of three sections; 38.85 KM from Chakdara to Timergara, 43.39 KM from Akhagram to Dir, and 47.98 KM from Kalkatak to Chitral.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be setting the foundation stone of the Chakdara-Chitral Expressway soon, a news source reported. This project comes under the China-Pakistan Economic Corridor (CPEC) mega-project. This announcement was made during the CM\u2019s recent visit to Timergara for the inauguration of a number of buildings. Read:\u00a0Construction work on Multan-Sukkur Motorway completed CM Khan had previously ordered special focus on all projects related to CPEC and had instructed all relevant departments to accelerate work on them. Read:\u00a0KP CM orders timely completion of infrastructure projects This road from Chakdara to Shandur through Chitral has been approved by the Executive Committee of National Economic Council (ECNEC). The National Highway Authority (NHA) has planned to spend approximately PKR 17.5 million on the construction of this project. The expressway will consist of three sections; 38.85 KM from Chakdara to Timergara, 43.39 KM from Akhagram to Dir, and 47.98 KM from Kalkatak to Chitral.<\/p>\n","protected":false},"author":74,"featured_media":11241,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[12589],"persona":[],"class_list":{"0":"post-54402","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-details-on-construction-of-chakdara-chitral-expressway-expected-soon"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction of Chakdara-Chitral Expressway expected soon - Zameen News<\/title>\n<meta name=\"description\" content=\"Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction of Chakdara-Chitral Expressway expected soon - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-08-16T08:03:10+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-08-16T08:03:21+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/m4.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"misha shahid\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"misha shahid\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction of Chakdara-Chitral Expressway expected soon - Zameen News","description":"Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html","og_locale":"en_US","og_type":"article","og_title":"Construction of Chakdara-Chitral Expressway expected soon - Zameen News","og_description":"Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be","og_url":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-08-16T08:03:10+00:00","article_modified_time":"2019-08-16T08:03:21+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/m4.jpg","type":"image\/jpeg"}],"author":"misha shahid","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"misha shahid","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html"},"author":{"name":"misha shahid","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/5cf08f4e92a249b4f3a8868996bfa6d6"},"headline":"Construction of Chakdara-Chitral Expressway expected soon","datePublished":"2019-08-16T08:03:10+00:00","dateModified":"2019-08-16T08:03:21+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html"},"wordCount":173,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/m4.jpg","keywords":["details on Construction of Chakdara-Chitral Expressway expected soon"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html","url":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html","name":"Construction of Chakdara-Chitral Expressway expected soon - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/m4.jpg","datePublished":"2019-08-16T08:03:10+00:00","dateModified":"2019-08-16T08:03:21+00:00","description":"Timergara: On Saturday, Khyber Pakhtunkhwa (KP) Chief Minister (CM) Mahmood Khan announced to the press that Prime Minister (PM) Imran Khan will be","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/m4.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/m4.jpg","width":600,"height":350,"caption":"Motorway M-2"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/construction-chakdara-chitral-expressway-expected-soon.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Construction of Chakdara-Chitral Expressway expected soon"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/5cf08f4e92a249b4f3a8868996bfa6d6","name":"misha shahid","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/947b043e3ca8541b5666523eb41b7213e3b57d98f2f3fe9c9babe619071694e5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/947b043e3ca8541b5666523eb41b7213e3b57d98f2f3fe9c9babe619071694e5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/947b043e3ca8541b5666523eb41b7213e3b57d98f2f3fe9c9babe619071694e5?s=96&d=mm&r=g","caption":"misha shahid"},"url":"https:\/\/www.zameen.com\/news\/author\/misha"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/54402","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/74"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=54402"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/54402\/revisions"}],"predecessor-version":[{"id":54403,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/54402\/revisions\/54403"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/11241"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=54402"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=54402"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=54402"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=54402"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}