{"id":54576,"date":"2019-08-23T12:34:57","date_gmt":"2019-08-23T12:34:57","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=54576"},"modified":"2020-01-27T06:17:52","modified_gmt":"2020-01-27T06:17:52","slug":"hub-power-plant-starts-operations","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html","title":{"rendered":"Hub power plant starts operations"},"content":{"rendered":"<p>Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC) had successfully begun its commercial operations in Hub, according to a news source.<\/p>\n<p>Developed in record time and within the projected budget, the power plant is an early harvest of the energy projects initiated under the CPEC framework \u2013 according to an official notification issued by the Central Power Purchasing Agency (CPPA). It said that the CPHGC had successfully performed the commissioning test and the firm\u2019s engineer had certified the successful commissioning of the complex.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/thar-coal-power-plant-inaugurated.html\" target=\"_blank\" rel=\"noopener noreferrer\">Thar coal power plant inaugurated<\/a><\/p>\n<p>The commercial operation date (COD) declared by the power producer is August 17, 2019, according to the CPPA. The certificate of initial tested capacity came out at 1,249 megawatts (MW). The CPPA later called upon National Power Control Centre (NPCC) to issue dispatch instructions heedful of the system requirements to the CPHGC.<\/p>\n<p>In a separate announcement made by the CPHGC, the firm declared the COD of this 1,320 MW (2&#215;660) imported coal-fired plant and integrated jetty that offers an annuak coal transhipment capacity of 4.2 million tonnes.<\/p>\n<p>The CPHGC is a joint venture of the Hub Power Company Limited (HUBCO) and the China Power International Holding (CPIH). The project was approved in November 2014 by the federal government and the letter of intent was issued in 2015.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/hubco-raises-pkr-7-bn-through-rights-issue.html\" target=\"_blank\" rel=\"noopener noreferrer\">HUBCO raises PKR 7 bn through rights issue<\/a><\/p>\n<p>HUBCO produces 2,920MW power from its four plants, dotted across Balochistan, Punjab, and Azad Jammu &amp; Kashmir. The power generation capacity of the HUBCO is likely to exceed 3,580MW after the completion of its other three <a href=\"https:\/\/www.zameen.com\/news\/thar-coal-power-plants-reach-full-generation-capacity-mid-june.html\" target=\"_blank\" rel=\"noopener noreferrer\">under construction power projects<\/a>; including Thar Energy Limited (TEL), Thalnova Power Thar (Pvt) Ltd and Sindh Engro Coal Mining Company (SECMC) at Thar Block II, making HUBCO the only power producer in Pakistan with four CPEC projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC) had successfully begun its commercial operations in Hub, according to a news source. Developed in record time and within the projected budget, the power plant is an early harvest of the energy projects initiated under the CPEC framework \u2013 according to an official notification issued by the Central Power Purchasing Agency (CPPA). It said that the CPHGC had successfully performed the commissioning test and the firm\u2019s engineer had certified the successful commissioning of the complex. Read:\u00a0Thar coal power plant inaugurated The commercial operation date (COD) declared by the power producer is August 17, 2019, according to the CPPA. The certificate of initial tested capacity came out at 1,249 megawatts (MW). The CPPA later called upon National Power Control Centre (NPCC) to issue dispatch instructions heedful of the system requirements to the CPHGC. In a separate announcement made by the CPHGC, the firm declared the COD of this 1,320 MW (2&#215;660) imported coal-fired plant and integrated jetty that offers an annuak coal transhipment capacity of 4.2 million tonnes. The CPHGC is a joint venture of the Hub Power Company&hellip;<\/p>\n","protected":false},"author":75,"featured_media":53365,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15012,15016],"tags":[12667],"persona":[],"class_list":{"0":"post-54576","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-allied-industries","8":"category-new-developments","9":"tag-details-on-hub-power-plant-starts-operations","10":"cat-15012-id","11":"cat-15016-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Hub power plant starts operations - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC)\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Hub power plant starts operations - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC)\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-08-23T12:34:57+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-01-27T06:17:52+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hazafa Hasan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hazafa Hasan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Hub power plant starts operations - Zameen News","description":"Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC)","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html","og_locale":"en_US","og_type":"article","og_title":"Hub power plant starts operations - Zameen News","og_description":"Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC)","og_url":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-08-23T12:34:57+00:00","article_modified_time":"2020-01-27T06:17:52+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","type":"image\/jpeg"}],"author":"Hazafa Hasan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Hazafa Hasan","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html"},"author":{"name":"Hazafa Hasan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b"},"headline":"Hub power plant starts operations","datePublished":"2019-08-23T12:34:57+00:00","dateModified":"2020-01-27T06:17:52+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html"},"wordCount":309,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","keywords":["details on Hub power plant starts operations"],"articleSection":["Allied Industries","New Developments"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html","url":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html","name":"Hub power plant starts operations - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","datePublished":"2019-08-23T12:34:57+00:00","dateModified":"2020-01-27T06:17:52+00:00","description":"Islamabad: The federal government on Sunday announced that the 1,320MW coal-based power plant developed by the China Power Hub Generation Company (CPHGC)","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/hub-power-plant-starts-operations.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Hub power plant starts operations"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b","name":"Hazafa Hasan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","caption":"Hazafa Hasan"},"description":"Hazafa reveres the art of writing and has been turned into a property enthusiast by profession. Her daily survival kit includes; tea, coffee, keyboard and paperbacks.","url":"https:\/\/www.zameen.com\/news\/author\/hazafa"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/54576","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/75"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=54576"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/54576\/revisions"}],"predecessor-version":[{"id":54577,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/54576\/revisions\/54577"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/53365"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=54576"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=54576"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=54576"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=54576"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}