{"id":55115,"date":"2019-09-11T14:01:44","date_gmt":"2019-09-11T09:01:44","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=55115"},"modified":"2019-09-11T16:00:16","modified_gmt":"2019-09-11T11:00:16","slug":"govt-to-increase-power-generation-phase-out-thermal-plants","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html","title":{"rendered":"Govt to increase power generation, phase out thermal plants"},"content":{"rendered":"<p>Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the next 20 years, a news source reported. It has finalised a plan for an increase of 300% to reach a power generation capacity of 111,000 megawatts (MW). It will also shut down almost all existing thermal power plants in the time period mentioned.<\/p>\n<p>Read:\u00a0<a href=\"https:\/\/www.zameen.com\/news\/nepra-grants-power-generation-license-to-enertech-quetta-solar.html\" target=\"_blank\" rel=\"noopener noreferrer\">NEPRA grants power generation license to Enertech Quetta Solar<\/a><\/p>\n<p>The government has planned these measures in order to meet the rising demand of energy in the country, and make it available at affordable prices. The measures are part of the Indicative Generation Capacity Expansion Plan (IGCEP) 2018-40, which was finalised by the National Transmission &amp; Despatch Company. IGCEP was prepared in consultation with the federal and provincial agencies, along with experts from the private sector. The government aims to ensure low-cost development of future projects, and comply with the regulator\u2019s Grid Code obligations by implanting the IGCEP.<\/p>\n<p>Read:\u00a0<a href=\"https:\/\/www.zameen.com\/news\/chinese-company-briefs-pm-on-hub-power-plant.html\" target=\"_blank\" rel=\"noopener noreferrer\">Chinese company briefs PM on Hub power plant<\/a><\/p>\n<p>The IGCEP 2018-40 is the first complete iteration of Pakistan\u2019s integrated planning exercise for the power sector. It will be revised each year, keeping in view the ground realities like consumption patterns, growth trajectory, completion\/delays in projects for ensuring regulatory compliance, etc.<\/p>\n<p>The government has devised the plan for increasing power generation capacity in light of three possible economic growth situations. These include scenarios with an increase of the GDP growth rate by 4.5%, 5.5%, and 7%.<\/p>\n<p>The plan includes the addition of power capacity through renewable sources. While considering all strategic projects, the plan also takes existing policy limitations and system constraints into account.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the next 20 years, a news source reported. It has finalised a plan for an increase of 300% to reach a power generation capacity of 111,000 megawatts (MW). It will also shut down almost all existing thermal power plants in the time period mentioned. Read:\u00a0NEPRA grants power generation license to Enertech Quetta Solar The government has planned these measures in order to meet the rising demand of energy in the country, and make it available at affordable prices. The measures are part of the Indicative Generation Capacity Expansion Plan (IGCEP) 2018-40, which was finalised by the National Transmission &amp; Despatch Company. IGCEP was prepared in consultation with the federal and provincial agencies, along with experts from the private sector. The government aims to ensure low-cost development of future projects, and comply with the regulator\u2019s Grid Code obligations by implanting the IGCEP. Read:\u00a0Chinese company briefs PM on Hub power plant The IGCEP 2018-40 is the first complete iteration of Pakistan\u2019s integrated planning exercise for the power sector. It will be revised each year, keeping in view the ground realities&hellip;<\/p>\n","protected":false},"author":68,"featured_media":53365,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[12935],"persona":[],"class_list":{"0":"post-55115","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-chinese-company-briefs-pm-on-hub-power-plant"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Govt to increase power generation, phase out thermal plants - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Govt to increase power generation, phase out thermal plants - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-11T09:01:44+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-09-11T11:00:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Safina Sultan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Safina Sultan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Govt to increase power generation, phase out thermal plants - Zameen News","description":"Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html","og_locale":"en_US","og_type":"article","og_title":"Govt to increase power generation, phase out thermal plants - Zameen News","og_description":"Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the","og_url":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-09-11T09:01:44+00:00","article_modified_time":"2019-09-11T11:00:16+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","type":"image\/jpeg"}],"author":"Safina Sultan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Safina Sultan","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html"},"author":{"name":"Safina Sultan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0f7ad58ef43a9c16d70bfd31d586f512"},"headline":"Govt to increase power generation, phase out thermal plants","datePublished":"2019-09-11T09:01:44+00:00","dateModified":"2019-09-11T11:00:16+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html"},"wordCount":284,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","keywords":["Chinese company briefs PM on Hub power plant"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html","url":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html","name":"Govt to increase power generation, phase out thermal plants - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","datePublished":"2019-09-11T09:01:44+00:00","dateModified":"2019-09-11T11:00:16+00:00","description":"Islamabad: The government has decided to increase the power generation capacity of the country, and phase out existing thermal power plants within the","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2019\/07\/Gwadar-Power-Plant.jpg","width":600,"height":350},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/govt-to-increase-power-generation-phase-out-thermal-plants.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Govt to increase power generation, phase out thermal plants"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0f7ad58ef43a9c16d70bfd31d586f512","name":"Safina Sultan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/41ef23ce0eab3597842e7f43d50bc919f73ac1f4e11afa5f19ca36f6e55f832f?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/41ef23ce0eab3597842e7f43d50bc919f73ac1f4e11afa5f19ca36f6e55f832f?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/41ef23ce0eab3597842e7f43d50bc919f73ac1f4e11afa5f19ca36f6e55f832f?s=96&d=mm&r=g","caption":"Safina Sultan"},"description":"Safina Sultan is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/safina"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/55115","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/68"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=55115"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/55115\/revisions"}],"predecessor-version":[{"id":55116,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/55115\/revisions\/55116"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/53365"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=55115"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=55115"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=55115"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=55115"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}