{"id":55247,"date":"2019-09-14T10:00:28","date_gmt":"2019-09-14T05:00:28","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=55247"},"modified":"2019-09-13T19:13:08","modified_gmt":"2019-09-13T14:13:08","slug":"tarbelas-power-units-produced-record-high-electricity","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html","title":{"rendered":"Tarbela\u2019s power units produced record high electricity"},"content":{"rendered":"<p>Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source reported.<\/p>\n<p>After remaining at full capacity for about three weeks, the reservoir began emptying on Thursday, and the water level reached 1549.24 feet. According to the dam officials, due to this decrease in volume, the position of water inflow was 128100 cusecs and outflow was 150,000 cusecs.<\/p>\n<p>This was the highest water storage level the dam had reached this year, and later the auxiliary spillways were opened to discharge extra water into river Indus. The maximum water storage capacity of Tarbela dam is 1550 feet at present water level. As the water had reached 1549.25 feet, the power generation has also approached its full capacity, which is higher than it has ever been for Tarbela Dam.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source reported. After remaining at full capacity for about three weeks, the reservoir began emptying on Thursday, and the water level reached 1549.24 feet. According to the dam officials, due to this decrease in volume, the position of water inflow was 128100 cusecs and outflow was 150,000 cusecs. This was the highest water storage level the dam had reached this year, and later the auxiliary spillways were opened to discharge extra water into river Indus. The maximum water storage capacity of Tarbela dam is 1550 feet at present water level. As the water had reached 1549.25 feet, the power generation has also approached its full capacity, which is higher than it has ever been for Tarbela Dam.<\/p>\n","protected":false},"author":57,"featured_media":41521,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[13002],"persona":[],"class_list":{"0":"post-55247","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-tarbelas-power-units-produced-record-high-electricity"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tarbela\u2019s power units produced record high electricity - Zameen News<\/title>\n<meta name=\"description\" content=\"Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tarbela\u2019s power units produced record high electricity - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-09-14T05:00:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"800\" \/>\n\t<meta property=\"og:image:height\" content=\"480\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Muhammad Farhad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Farhad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tarbela\u2019s power units produced record high electricity - Zameen News","description":"Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html","og_locale":"en_US","og_type":"article","og_title":"Tarbela\u2019s power units produced record high electricity - Zameen News","og_description":"Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source","og_url":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-09-14T05:00:28+00:00","og_image":[{"width":800,"height":480,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","type":"image\/jpeg"}],"author":"Muhammad Farhad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Farhad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html"},"author":{"name":"Muhammad Farhad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9"},"headline":"Tarbela\u2019s power units produced record high electricity","datePublished":"2019-09-14T05:00:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html"},"wordCount":142,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","keywords":["Tarbela\u2019s power units produced record high electricity"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html","url":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html","name":"Tarbela\u2019s power units produced record high electricity - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","datePublished":"2019-09-14T05:00:28+00:00","description":"Peshawar: The Tarbela Dam\u2019s 17 power units were working at full capacity, and were producing record 4902 megawatts electricity on Thursday, a news source","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2018\/08\/tarbela-dam.jpg","width":800,"height":480},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/tarbelas-power-units-produced-record-high-electricity.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Tarbela\u2019s power units produced record high electricity"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9","name":"Muhammad Farhad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","caption":"Muhammad Farhad"},"description":"Muhammad Farhad is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/farhad-hassan"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/55247","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=55247"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/55247\/revisions"}],"predecessor-version":[{"id":55248,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/55247\/revisions\/55248"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/41521"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=55247"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=55247"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=55247"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=55247"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}