{"id":57184,"date":"2019-11-04T13:07:15","date_gmt":"2019-11-04T08:07:15","guid":{"rendered":"https:\/\/www.zameen.com\/blog\/?p=57184"},"modified":"2019-11-04T13:07:30","modified_gmt":"2019-11-04T08:07:30","slug":"kamalia-harappa-bridge-construction-work-resumes","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html","title":{"rendered":"Kamalia-Harappa Bridge construction work resumes"},"content":{"rendered":"<p>Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year delay, a news source reported. Following the facility\u2019s construction, the distance between Kamalia and Sahiwal is expected to be reduced by 35 kilometers.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/burma-bridges-construction-underway.html\" target=\"_blank\" rel=\"noopener noreferrer\">Burma Bridge\u2019s construction underway<\/a><\/p>\n<p>As per details, the authorities concerned have released funds worth PKR 200 billion to a private construction company; which has been tasked with the project\u2019s completion. The same company had been carrying out the construction work prior to its halt.<\/p>\n<p>Member National Assembly (MNA) Riaz Fatyana, during a press briefing, stated that the National Engineering Services Pakistan (NESPAK) would supervise the construction work.<\/p>\n<p><strong>Read:\u00a0<\/strong><a href=\"https:\/\/www.zameen.com\/news\/villagers-request-construction-bridge-over-panjkora-river.html\" target=\"_blank\" rel=\"noopener noreferrer\">Villagers request construction of bridge over Panjkora River<\/a><\/p>\n<p>He added that the cost of construction work on the road from Mull Fatyana to the bridge would not exceed the budgeted allocations. The remaining amount of PKR 775 million is expected to be approved soon.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year delay, a news source reported. Following the facility\u2019s construction, the distance between Kamalia and Sahiwal is expected to be reduced by 35 kilometers. Read:\u00a0Burma Bridge\u2019s construction underway As per details, the authorities concerned have released funds worth PKR 200 billion to a private construction company; which has been tasked with the project\u2019s completion. The same company had been carrying out the construction work prior to its halt. Member National Assembly (MNA) Riaz Fatyana, during a press briefing, stated that the National Engineering Services Pakistan (NESPAK) would supervise the construction work. Read:\u00a0Villagers request construction of bridge over Panjkora River He added that the cost of construction work on the road from Mull Fatyana to the bridge would not exceed the budgeted allocations. The remaining amount of PKR 775 million is expected to be approved soon.<\/p>\n","protected":false},"author":74,"featured_media":10998,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[],"tags":[13782],"persona":[],"class_list":{"0":"post-57184","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"tag-details-on-kamalia-harappa-bridge-construction-work-resumes"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Kamalia-Harappa Bridge construction work resumes - Zameen News<\/title>\n<meta name=\"description\" content=\"Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kamalia-Harappa Bridge construction work resumes - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2019-11-04T08:07:15+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2019-11-04T08:07:30+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/2663198089_f96248d6d7.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"600\" \/>\n\t<meta property=\"og:image:height\" content=\"350\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"misha shahid\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"misha shahid\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Kamalia-Harappa Bridge construction work resumes - Zameen News","description":"Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html","og_locale":"en_US","og_type":"article","og_title":"Kamalia-Harappa Bridge construction work resumes - Zameen News","og_description":"Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year","og_url":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2019-11-04T08:07:15+00:00","article_modified_time":"2019-11-04T08:07:30+00:00","og_image":[{"width":600,"height":350,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/2663198089_f96248d6d7.jpg","type":"image\/jpeg"}],"author":"misha shahid","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"misha shahid","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html"},"author":{"name":"misha shahid","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/5cf08f4e92a249b4f3a8868996bfa6d6"},"headline":"Kamalia-Harappa Bridge construction work resumes","datePublished":"2019-11-04T08:07:15+00:00","dateModified":"2019-11-04T08:07:30+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html"},"wordCount":164,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/2663198089_f96248d6d7.jpg","keywords":["details on Kamalia-Harappa Bridge construction work resumes"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html","url":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html","name":"Kamalia-Harappa Bridge construction work resumes - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/2663198089_f96248d6d7.jpg","datePublished":"2019-11-04T08:07:15+00:00","dateModified":"2019-11-04T08:07:30+00:00","description":"Toba Tek Singh: The construction work of the Kamalia-Harappa Bridge, located near Mull Fatyana over River Ravi, was recently resumed following a six-year","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/2663198089_f96248d6d7.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2014\/12\/2663198089_f96248d6d7.jpg","width":600,"height":350,"caption":"Clifton bridge karachi"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/kamalia-harappa-bridge-construction-work-resumes.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Kamalia-Harappa Bridge construction work resumes"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/5cf08f4e92a249b4f3a8868996bfa6d6","name":"misha shahid","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/947b043e3ca8541b5666523eb41b7213e3b57d98f2f3fe9c9babe619071694e5?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/947b043e3ca8541b5666523eb41b7213e3b57d98f2f3fe9c9babe619071694e5?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/947b043e3ca8541b5666523eb41b7213e3b57d98f2f3fe9c9babe619071694e5?s=96&d=mm&r=g","caption":"misha shahid"},"url":"https:\/\/www.zameen.com\/news\/author\/misha"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/57184","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/74"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=57184"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/57184\/revisions"}],"predecessor-version":[{"id":57185,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/57184\/revisions\/57185"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/10998"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=57184"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=57184"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=57184"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=57184"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}