{"id":61754,"date":"2020-02-22T10:10:00","date_gmt":"2020-02-22T05:10:00","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=61754"},"modified":"2020-02-21T16:42:48","modified_gmt":"2020-02-21T11:42:48","slug":"ntdc-launches-work-on-220kv-jhampir-2-grid","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html","title":{"rendered":"NTDC launches development work on 220KV Jhampir 2 grid"},"content":{"rendered":"\n<p>Karachi: The National Transmission &amp; Despatch Company (NTDC) has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct <a href=\"https:\/\/www.zameen.com\/news\/new-mechanism-sought-renewable-energy-development.html\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"clean renewable energy (opens in a new tab)\">clean renewable energy<\/a> in the system, according to news sources.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/ntdc-presents-plan-for-increasing-power-generation-capacity.html\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"NTDC presents plan for increasing power generation capacity (opens in a new tab)\">NTDC presents plan for increasing power generation capacity<\/a><\/p>\n\n\n\n<p>NTDC Managing Director (MD) Zafar Abbas on Thursday said that the project\u2019s execution would be carried out through NTDC\u2019s own sources. He further stated that the Jhampir 2 project would consist of 11 wind plants (in its first phase) and a commutative capacity of 600MW. <\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/sindh-approves-land-allotment-setting-up-power-projects.html\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\" (opens in a new tab)\">Sindh approves land allotment for setting up power projects<\/a><\/p>\n\n\n\n<p>According to the company\u2019s estimate, the cost of preparation of PC-I of the 220KV Jhampir 2 grid project is PKR 10.753 billion and the funding required amounts to PKR 6.4 billion. The company is in talks with a consortium of banks to finalise terms and conditions of this funding.<\/p>\n\n\n\n<p>The NTDC hopes to establish its own strength in the market\nwith this loan, which is likely to become a precursor for more funding of\nupcoming transmission line projects.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Karachi: The National Transmission &amp; Despatch Company (NTDC) has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct clean renewable energy in the system, according to news sources. Read: NTDC presents plan for increasing power generation capacity NTDC Managing Director (MD) Zafar Abbas on Thursday said that the project\u2019s execution would be carried out through NTDC\u2019s own sources. He further stated that the Jhampir 2 project would consist of 11 wind plants (in its first phase) and a commutative capacity of 600MW. Read: Sindh approves land allotment for setting up power projects According to the company\u2019s estimate, the cost of preparation of PC-I of the 220KV Jhampir 2 grid project is PKR 10.753 billion and the funding required amounts to PKR 6.4 billion. The company is in talks with a consortium of banks to finalise terms and conditions of this funding. The NTDC hopes to establish its own strength in the market with this loan, which is likely to become a precursor for more funding of upcoming transmission line projects.<\/p>\n","protected":false},"author":75,"featured_media":61758,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15012],"tags":[20384,9734,20383],"persona":[],"class_list":{"0":"post-61754","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-allied-industries","8":"tag-220kv-jhampir-2-grid","9":"tag-ntdc","10":"tag-ntdc-launches-development-work-on-220kv-jhampir-2-grid","11":"cat-15012-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>NTDC launches work on 220KV Jhampir 2 grid - Zameen News<\/title>\n<meta name=\"description\" content=\"NTDC has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct clean renewable energy\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"NTDC launches work on 220KV Jhampir 2 grid - Zameen News\" \/>\n<meta property=\"og:description\" content=\"NTDC has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct clean renewable energy\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-02-22T05:10:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Jhampir-power-project.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"435\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hazafa Hasan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hazafa Hasan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"NTDC launches work on 220KV Jhampir 2 grid - Zameen News","description":"NTDC has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct clean renewable energy","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html","og_locale":"en_US","og_type":"article","og_title":"NTDC launches work on 220KV Jhampir 2 grid - Zameen News","og_description":"NTDC has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct clean renewable energy","og_url":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-02-22T05:10:00+00:00","og_image":[{"width":1170,"height":435,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Jhampir-power-project.jpg","type":"image\/jpeg"}],"author":"Hazafa Hasan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Hazafa Hasan","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html"},"author":{"name":"Hazafa Hasan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b"},"headline":"NTDC launches development work on 220KV Jhampir 2 grid","datePublished":"2020-02-22T05:10:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html"},"wordCount":184,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Jhampir-power-project.jpg","keywords":["220KV Jhampir 2 grid","NTDC","NTDC launches development work on 220KV Jhampir 2 grid"],"articleSection":["Allied Industries"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html","url":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html","name":"NTDC launches work on 220KV Jhampir 2 grid - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Jhampir-power-project.jpg","datePublished":"2020-02-22T05:10:00+00:00","description":"NTDC has initiated the construction work of 220KV Jhampir 2 grid and interconnecting transmission lines in a bid to induct clean renewable energy","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Jhampir-power-project.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Jhampir-power-project.jpg","width":1170,"height":435,"caption":"Jhampir windmill power project"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/ntdc-launches-work-on-220kv-jhampir-2-grid.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"NTDC launches development work on 220KV Jhampir 2 grid"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b","name":"Hazafa Hasan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","caption":"Hazafa Hasan"},"description":"Hazafa reveres the art of writing and has been turned into a property enthusiast by profession. Her daily survival kit includes; tea, coffee, keyboard and paperbacks.","url":"https:\/\/www.zameen.com\/news\/author\/hazafa"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/61754","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/75"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=61754"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/61754\/revisions"}],"predecessor-version":[{"id":61763,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/61754\/revisions\/61763"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/61758"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=61754"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=61754"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=61754"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=61754"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}