{"id":62450,"date":"2020-03-09T13:04:00","date_gmt":"2020-03-09T08:04:00","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=62450"},"modified":"2020-03-09T13:04:01","modified_gmt":"2020-03-09T08:04:01","slug":"rrr-topographic-survey-completed","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html","title":{"rendered":"Topographic survey for RRR completed: RDA DG"},"content":{"rendered":"\n<p>Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project&#8217;s area topography, soil, and existing roads has been completed, a news source reported. <\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/section-4-notice-formed-to-acquire-additional-land-for-rrr.html\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"RRR land acquisition: Section 4 notification prepared to acquire additional 6,000 kanals (opens in a new tab)\">RRR land acquisition: Section 4 notification prepared to acquire additional 6,000 kanals<\/a><\/p>\n\n\n\n<p>She was briefing a meeting held to review RRR\u2019s development progress. The meeting was chaired by the Rawalpindi Commissioner  Captain (retired) Muhammad Masood, who said that RRR, once completed, will help in easing traffic flow in both Islamabad and Rawalpindi.<\/p>\n\n\n\n<p>He further said that the development work on RRR would be prioritised and \u2018will not be treated like a normal project\u2019.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/rrr-stretch-over-100km-encircle-islamabad-rawalpindi-sarwar.html\" target=\"_blank\" rel=\"noreferrer noopener\" aria-label=\"RRR to stretch over 100km to encircle Islamabad and Rawalpindi: Sarwar (opens in a new tab)\">RRR to stretch over 100km to encircle Islamabad and Rawalpindi: Sarwar<\/a><\/p>\n\n\n\n<p>In response, the RDA DG revealed that a modern e-challan system would be introduced for the ring road; further stating that the authorities concerned were considering the formation of a police force for the 64-kilometre-long project.<\/p>\n\n\n\n<p>She said that the areas over which RRR is to be constructed have been cleared and instructions have been issued to the relevant authorities for the removal of encroachments. <\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project&#8217;s area topography, soil, and existing roads has been completed, a news source reported. Read: RRR land acquisition: Section 4 notification prepared to acquire additional 6,000 kanals She was briefing a meeting held to review RRR\u2019s development progress. The meeting was chaired by the Rawalpindi Commissioner Captain (retired) Muhammad Masood, who said that RRR, once completed, will help in easing traffic flow in both Islamabad and Rawalpindi. He further said that the development work on RRR would be prioritised and \u2018will not be treated like a normal project\u2019. Read: RRR to stretch over 100km to encircle Islamabad and Rawalpindi: Sarwar In response, the RDA DG revealed that a modern e-challan system would be introduced for the ring road; further stating that the authorities concerned were considering the formation of a police force for the 64-kilometre-long project. She said that the areas over which RRR is to be constructed have been cleared and instructions have been issued to the relevant authorities for the removal of encroachments.<\/p>\n","protected":false},"author":57,"featured_media":60865,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15016],"tags":[22300],"persona":[],"class_list":{"0":"post-62450","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-new-developments","8":"tag-rrr-topographic-survey-completed","9":"cat-15016-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rawalpindi Ring Road topographic survey completed - Zameen News<\/title>\n<meta name=\"description\" content=\"Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project&#039;s area\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rawalpindi Ring Road topographic survey completed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project&#039;s area\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-03-09T08:04:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-03-09T08:04:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/RRR-1.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Muhammad Farhad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Farhad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rawalpindi Ring Road topographic survey completed - Zameen News","description":"Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project's area","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html","og_locale":"en_US","og_type":"article","og_title":"Rawalpindi Ring Road topographic survey completed - Zameen News","og_description":"Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project's area","og_url":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-03-09T08:04:00+00:00","article_modified_time":"2020-03-09T08:04:01+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/RRR-1.png","type":"image\/png"}],"author":"Muhammad Farhad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Farhad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html"},"author":{"name":"Muhammad Farhad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9"},"headline":"Topographic survey for RRR completed: RDA DG","datePublished":"2020-03-09T08:04:00+00:00","dateModified":"2020-03-09T08:04:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html"},"wordCount":191,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/RRR-1.png","keywords":["RRR topographic survey completed"],"articleSection":["New Developments"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html","url":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html","name":"Rawalpindi Ring Road topographic survey completed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/RRR-1.png","datePublished":"2020-03-09T08:04:00+00:00","dateModified":"2020-03-09T08:04:01+00:00","description":"Rawalpindi: Rawalpindi Development Authority Director General Ammara Khan on Sunday revealed that the survey of Rawalpindi Ring Road (RRR) project's area","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/RRR-1.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/RRR-1.png","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/rrr-topographic-survey-completed.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Topographic survey for RRR completed: RDA DG"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9","name":"Muhammad Farhad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","caption":"Muhammad Farhad"},"description":"Muhammad Farhad is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/farhad-hassan"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/62450","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=62450"}],"version-history":[{"count":2,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/62450\/revisions"}],"predecessor-version":[{"id":62456,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/62450\/revisions\/62456"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/60865"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=62450"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=62450"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=62450"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=62450"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}