{"id":66080,"date":"2020-06-01T17:25:51","date_gmt":"2020-06-01T12:25:51","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=66080"},"modified":"2020-06-01T17:25:53","modified_gmt":"2020-06-01T12:25:53","slug":"cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html","title":{"rendered":"CDA sends Sihala-Kohuta Road Flyover PC-1 to interior ministry for approval"},"content":{"rendered":"\n<p>Islamabad: The Capital Development Authority (CDA) recently finalised the PC-1 for the construction of a flyover at the Sihala-Kahuta Road; with the authority further having forwarded a summary to the Ministry of Interior for approval, according to news sources. This venture is expected to be completed within a period of 12 months following the initiation of development work.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/cda-expedites-development-work-in-park-enclave-i.html\" target=\"_blank\" rel=\"noreferrer noopener\">CDA expedites development work in Park Enclave \u2013 I<\/a><\/p>\n\n\n\n<p>Reportedly, the flyover will be built on a railway crossing located at about 6 kilometres away from Kakpul on Kahuta Road. As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under the Public Sector Development Programme.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/cda-set-to-launch-construction-of-malal-bridge-on-lehtarar-road.html\" target=\"_blank\" rel=\"noreferrer noopener\">CDA set to launch construction of Malal Bridge on Lehtarar Road<\/a><\/p>\n\n\n\n<p>As per the news reports, the residents of the area and daily commuters had been demanding a facility like this over the past several years. These calls were prompted by the traffic congestion that had become a source of constant menace for the locals. Hopefully, the construction of the said overhead bridge will relieve some of the load from this important route, and improve traffic flow in the area.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/cda-shares-rules-for-unacquired-sectoral-areas-of-zone-1.html\" target=\"_blank\" rel=\"noreferrer noopener\">CDA shares construction guidelines for \u2018Unacquired Sectoral Areas of Zone-1\u2019<\/a><\/p>\n\n\n\n<p>According to the information available, the flyover will be 1,800 feet in length, and its approach road will be 900 feet long.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The Capital Development Authority (CDA) recently finalised the PC-1 for the construction of a flyover at the Sihala-Kahuta Road; with the authority further having forwarded a summary to the Ministry of Interior for approval, according to news sources. This venture is expected to be completed within a period of 12 months following the initiation of development work. Read: CDA expedites development work in Park Enclave \u2013 I Reportedly, the flyover will be built on a railway crossing located at about 6 kilometres away from Kakpul on Kahuta Road. As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under the Public Sector Development Programme. Read: CDA set to launch construction of Malal Bridge on Lehtarar Road As per the news reports, the residents of the area and daily commuters had been demanding a facility like this over the past several years. These calls were prompted by the traffic congestion that had become a source of constant menace for the locals. Hopefully, the construction of the said overhead bridge will relieve some of the load from this important route, and improve traffic flow in the area.&hellip;<\/p>\n","protected":false},"author":18,"featured_media":60265,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[30559,30558,30555,30554,30556,30557],"persona":[],"class_list":{"0":"post-66080","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-cda-development-projects","9":"tag-cda-latest-news","10":"tag-cda-projects-in-islamabad","11":"tag-cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval","12":"tag-news-road-projects-in-islamabad","13":"tag-sihala-kohuta-road-flyover","14":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CDA sends Sihala-Kohuta Road Flyover PC-1 for approval - Zameen News<\/title>\n<meta name=\"description\" content=\"As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CDA sends Sihala-Kohuta Road Flyover PC-1 for approval - Zameen News\" \/>\n<meta property=\"og:description\" content=\"As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-06-01T12:25:51+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-06-01T12:25:53+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/CDA-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CDA sends Sihala-Kohuta Road Flyover PC-1 for approval - Zameen News","description":"As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html","og_locale":"en_US","og_type":"article","og_title":"CDA sends Sihala-Kohuta Road Flyover PC-1 for approval - Zameen News","og_description":"As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under","og_url":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-06-01T12:25:51+00:00","article_modified_time":"2020-06-01T12:25:53+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/CDA-1.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"CDA sends Sihala-Kohuta Road Flyover PC-1 to interior ministry for approval","datePublished":"2020-06-01T12:25:51+00:00","dateModified":"2020-06-01T12:25:53+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html"},"wordCount":238,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/CDA-1.jpg","keywords":["CDA development projects","CDA latest news","CDA projects in islamabad","CDA sends Sihala-Kohuta Road Flyover PC-1 for approval","news road projects in islamabad","Sihala-Kohuta Road Flyover"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html","url":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html","name":"CDA sends Sihala-Kohuta Road Flyover PC-1 for approval - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/CDA-1.jpg","datePublished":"2020-06-01T12:25:51+00:00","dateModified":"2020-06-01T12:25:53+00:00","description":"As per the PC-1, the construction of this flyover is estimated to cost PKR 483 million, while it will developed using the funds issued under","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/CDA-1.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/CDA-1.jpg","width":1170,"height":400,"caption":"Logo of Capital Development Authority"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/cda-sends-sihala-kohuta-road-flyover-pc-1-for-approval.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"CDA sends Sihala-Kohuta Road Flyover PC-1 to interior ministry for approval"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/66080","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=66080"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/66080\/revisions"}],"predecessor-version":[{"id":66082,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/66080\/revisions\/66082"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/60265"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=66080"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=66080"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=66080"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=66080"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}