{"id":68255,"date":"2020-07-20T18:12:59","date_gmt":"2020-07-20T13:12:59","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=68255"},"modified":"2020-07-20T18:13:01","modified_gmt":"2020-07-20T13:13:01","slug":"firdous-market-underpass-development-work-status","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html","title":{"rendered":"Firdous Market Underpass: Project development completed by 50%"},"content":{"rendered":"\n<p>Lahore: Lahore Development Authority (LDA) Director General (DG) Ahmed Aziz Tarar paid a visit to the construction site of Firdous Market Underpass on Friday (July 17), where LDA Chief Engineer Habib-ul-Haq Randhawa briefed him regarding the project work at the underpass, which has been completed by 50%, a news source reported.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/firdous-market-chowk-alternate-traffic-plan-details.html\" target=\"_blank\" rel=\"noreferrer noopener\">Firdous Market Underpass construction: Alternate traffic plan shared<\/a><\/p>\n\n\n\n<p>According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week. At the same time, theconstruction of the 350-kilometre long retaining wall has also been completed. In addition to that, the Water and Sanitation Authority (WASA) has also completed the work to lay an 18-inch-wide sewerage line<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/lda-shares-update-development-firdous-market-underpass.html\" target=\"_blank\" rel=\"noreferrer noopener\">LDA shares update on development of Firdous Market Underpass<\/a><\/p>\n\n\n\n<p>As per the details shared by the LDA Chief Engineering, the following tasks at the Firdous Market Underass construction site are underway:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Digging work at the entry points of the underpass<\/li><li>Demolition of the old drain lines<\/li><li>Relocation of gas supply lines<\/li><\/ul>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/firdous-market-underpass-will-be-completed-in-90-days.html\" target=\"_blank\" rel=\"noreferrer noopener\">Firdous Market Underpass project will be completed in 90 days: LDA VC<\/a><\/p>\n\n\n\n<p>After receiving the briefing, the LDA DG directed the project director Iqrar Hussain to take all measures necessary for the timely completion of the project. He also instructed the director to place a proper rain drainage system in order to ensure that the project faces no lags.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: Lahore Development Authority (LDA) Director General (DG) Ahmed Aziz Tarar paid a visit to the construction site of Firdous Market Underpass on Friday (July 17), where LDA Chief Engineer Habib-ul-Haq Randhawa briefed him regarding the project work at the underpass, which has been completed by 50%, a news source reported. Read: Firdous Market Underpass construction: Alternate traffic plan shared According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week. At the same time, theconstruction of the 350-kilometre long retaining wall has also been completed. In addition to that, the Water and Sanitation Authority (WASA) has also completed the work to lay an 18-inch-wide sewerage line Read: LDA shares update on development of Firdous Market Underpass As per the details shared by the LDA Chief Engineering, the following tasks at the Firdous Market Underass construction site are underway: Digging work at the entry points of the underpass Demolition of the old drain lines Relocation of gas supply lines Read: Firdous Market Underpass project will be completed in 90 days: LDA VC After receiving the briefing, the LDA DG directed the project&hellip;<\/p>\n","protected":false},"author":18,"featured_media":66201,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[35180,35179,35178],"persona":[],"class_list":{"0":"post-68255","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-development-work-update-on-firdous-market-underpass","9":"tag-firdous-market-underpass-development-status","10":"tag-firdous-market-underpass-development-work-completed-by-50","11":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Firdous Underpass: Development work completed by 50% - Zameen News<\/title>\n<meta name=\"description\" content=\"According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Firdous Underpass: Development work completed by 50% - Zameen News\" \/>\n<meta property=\"og:description\" content=\"According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-07-20T13:12:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-07-20T13:13:01+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/06\/Firdous-market-underpass.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Firdous Underpass: Development work completed by 50% - Zameen News","description":"According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html","og_locale":"en_US","og_type":"article","og_title":"Firdous Underpass: Development work completed by 50% - Zameen News","og_description":"According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week...","og_url":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-07-20T13:12:59+00:00","article_modified_time":"2020-07-20T13:13:01+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/06\/Firdous-market-underpass.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Firdous Market Underpass: Project development completed by 50%","datePublished":"2020-07-20T13:12:59+00:00","dateModified":"2020-07-20T13:13:01+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html"},"wordCount":239,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/06\/Firdous-market-underpass.jpg","keywords":["development work update on firdous market underpass","Firdous market underpass development status","Firdous Market Underpass development work completed by 50%"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html","url":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html","name":"Firdous Underpass: Development work completed by 50% - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/06\/Firdous-market-underpass.jpg","datePublished":"2020-07-20T13:12:59+00:00","dateModified":"2020-07-20T13:13:01+00:00","description":"According to Randhawa, piling work on 770 out of a total of 880 piles has been completed, while the rest of the work will be completed in another week...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/06\/Firdous-market-underpass.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/06\/Firdous-market-underpass.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/firdous-market-underpass-development-work-status.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Firdous Market Underpass: Project development completed by 50%"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/68255","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=68255"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/68255\/revisions"}],"predecessor-version":[{"id":68261,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/68255\/revisions\/68261"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/66201"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=68255"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=68255"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=68255"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=68255"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}