{"id":69494,"date":"2020-08-21T10:00:00","date_gmt":"2020-08-21T05:00:00","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=69494"},"modified":"2020-08-21T01:10:35","modified_gmt":"2020-08-20T20:10:35","slug":"islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html","title":{"rendered":"Islamabad-Rawalpindi Circular Railway Track: Chinese team initiates survey"},"content":{"rendered":"\n<p>Rawalpindi: The 8-member team representing the Chinese Civil Engineering Construction Corporation (CCECC) has initiated the survey for laying the 100-kilometre-long Islamabad\/Rawalpindi Circular Railway Track along the Leh Expressway, according to a news report published on August 20. The team carried out the survey work under strict security surveillance.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/leh-expressway-demarcation-route-alignment-completed.html\" target=\"_blank\" rel=\"noreferrer noopener\">Leh Expressway: Demarcation for route alignment completed<\/a><\/p>\n\n\n\n<p>As per news sources, the team visited the following sites; Rialto Chowk, Soan River, Ammar Shaheed Chowk, Saddar Road, New Katarian, and Gawalmandi Chowk. According to the project\u2019s focal person Mir Atiq-ur-Rehman, the team has been conducted a detailed survey of the various sites where the track is to be laid.<\/p>\n\n\n\n<p>Reportedly, the Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be shared with the concerned authority in the next 6 months. As revealed earlier, the Circular Railway Track is among the projects being constructed under the China-Pakistan Economic Corridor (CPEC) developments.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/rda-identify-land-sewage-plant-leh-expressway-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">RDA to identify land for sewage plant under Leh Expressway project<\/a><\/p>\n\n\n\n<p>The railway track will be laid along the Nullah Leh, all the way from Islamabad Secretariat to Islamabad International Airport. Sources also revealed that after conducting the survey, team members had a meeting with the Rawalpindi Development Authority (RDA) Chairman Tariq Murtaza to discuss the various aspects of the project development.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rawalpindi: The 8-member team representing the Chinese Civil Engineering Construction Corporation (CCECC) has initiated the survey for laying the 100-kilometre-long Islamabad\/Rawalpindi Circular Railway Track along the Leh Expressway, according to a news report published on August 20. The team carried out the survey work under strict security surveillance. Read: Leh Expressway: Demarcation for route alignment completed As per news sources, the team visited the following sites; Rialto Chowk, Soan River, Ammar Shaheed Chowk, Saddar Road, New Katarian, and Gawalmandi Chowk. According to the project\u2019s focal person Mir Atiq-ur-Rehman, the team has been conducted a detailed survey of the various sites where the track is to be laid. Reportedly, the Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be shared with the concerned authority in the next 6 months. As revealed earlier, the Circular Railway Track is among the projects being constructed under the China-Pakistan Economic Corridor (CPEC) developments. Read: RDA to identify land for sewage plant under Leh Expressway project The railway track will be laid along the Nullah Leh, all the way from Islamabad Secretariat to Islamabad International Airport. Sources also revealed that after conducting the survey,&hellip;<\/p>\n","protected":false},"author":18,"featured_media":63737,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[37397,37396,37395],"persona":[],"class_list":{"0":"post-69494","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-chinese-team-initiates-survey-of-isb-rwp-railway-track","9":"tag-circular-railway-track-along-leh-expressway","10":"tag-leh-expressway-latest-development","11":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Chinese team initiates survey of ISB-RWP Railway Track - Zameen News<\/title>\n<meta name=\"description\" content=\"The Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Chinese team initiates survey of ISB-RWP Railway Track - Zameen News\" \/>\n<meta property=\"og:description\" content=\"The Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-21T05:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/leh.png\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/png\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Chinese team initiates survey of ISB-RWP Railway Track - Zameen News","description":"The Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html","og_locale":"en_US","og_type":"article","og_title":"Chinese team initiates survey of ISB-RWP Railway Track - Zameen News","og_description":"The Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be...","og_url":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-08-21T05:00:00+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/leh.png","type":"image\/png"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Islamabad-Rawalpindi Circular Railway Track: Chinese team initiates survey","datePublished":"2020-08-21T05:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html"},"wordCount":232,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/leh.png","keywords":["Chinese team initiates survey of ISB-RWP Railway Track","Circular railway track along leh expressway","Leh expressway latest development"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html","url":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html","name":"Chinese team initiates survey of ISB-RWP Railway Track - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/leh.png","datePublished":"2020-08-21T05:00:00+00:00","description":"The Chinese experts have also initiated the work to prepare the project\u2019s feasibility study. The feasibility study report is expected to be...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/leh.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/leh.png","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/islamabad-rawalpindi-circular-railway-track-chinese-team-initiates-survey.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Islamabad-Rawalpindi Circular Railway Track: Chinese team initiates survey"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/69494","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=69494"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/69494\/revisions"}],"predecessor-version":[{"id":69495,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/69494\/revisions\/69495"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/63737"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=69494"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=69494"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=69494"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=69494"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}