{"id":69741,"date":"2020-08-28T12:33:27","date_gmt":"2020-08-28T07:33:27","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=69741"},"modified":"2020-08-28T12:33:28","modified_gmt":"2020-08-28T07:33:28","slug":"kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html","title":{"rendered":"KP revenue generation via hydropower projects increases by 100% in FY2019-20: report"},"content":{"rendered":"\n<p>Peshawar: A progress review meeting of Khyber Pakhtunkhwa (KP) Energy and Power Department \u2013 chaired by Chief Minister (CM) Mahmood Khan \u2013 was told that the Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years, according to a news report published on August 27.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/pm-praises-kpra-increasing-revenue-during-pandemic.html\" target=\"_blank\" rel=\"noreferrer noopener\">PM praises KPRA for increasing revenue during pandemic<\/a><\/p>\n\n\n\n<p>The meeting was further informed that during the fiscal year 2018-19, the organisation generated revenue worth of PKR 1,571.14 million, whereas in the following year, a revenue of PKR 3,458 million was generated through various hydropower projects in the province.<\/p>\n\n\n\n<p>The meeting was also told that new hydropower projects including 17 MegaWatts (MW) Ranolia Hydropower project, 2.60 MW Machai Hydropower Project and the 36.6 MW Dral Khwar Hydropower Project in Swat were completed in last two years. These three projects were developed at a cost of PKR 14 billion and are likely to generate PKR 2 billion annual revenue for KP.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/kp-govt-to-extend-health-insurance-to-all-residents.html\">KP govt to extend health insurance to all residents<\/a><\/p>\n\n\n\n<p>Furthermore, the KP Transmission &amp; Grid Company is all set up and ready to become operational. The meeting was told that a Public-Private Partnership (PPP) model has been launched to fast track implementation of the hydropower projects. The CM directed the officials to ensure timely completion of these ongoing <a href=\"https:\/\/www.zameen.com\/news\/kp-to-complete-two-hydropower-projects-by-december-2020.html\" target=\"_blank\" rel=\"noreferrer noopener\">hydropower projects<\/a> so that the public can avail the benefits without further delay.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Peshawar: A progress review meeting of Khyber Pakhtunkhwa (KP) Energy and Power Department \u2013 chaired by Chief Minister (CM) Mahmood Khan \u2013 was told that the Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years, according to a news report published on August 27. Read: PM praises KPRA for increasing revenue during pandemic The meeting was further informed that during the fiscal year 2018-19, the organisation generated revenue worth of PKR 1,571.14 million, whereas in the following year, a revenue of PKR 3,458 million was generated through various hydropower projects in the province. The meeting was also told that new hydropower projects including 17 MegaWatts (MW) Ranolia Hydropower project, 2.60 MW Machai Hydropower Project and the 36.6 MW Dral Khwar Hydropower Project in Swat were completed in last two years. These three projects were developed at a cost of PKR 14 billion and are likely to generate PKR 2 billion annual revenue for KP. Read: KP govt to extend health insurance to all residents Furthermore, the KP Transmission &amp; Grid Company is all set up and ready to become operational. The meeting was told that a Public-Private Partnership (PPP) model has been&hellip;<\/p>\n","protected":false},"author":75,"featured_media":67875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013,20385],"tags":[37926,37928,37927],"persona":[],"class_list":{"0":"post-69741","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"category-development-projects","9":"tag-kp-revenue-generation-via-hydropower-projects-increases-by-100","10":"tag-pakhtunkhwa-energy-development-organisation","11":"tag-ranolia-hydropower-project","12":"cat-15013-id","13":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>KP revenue generation via hydropower projects increased - Zameen News<\/title>\n<meta name=\"description\" content=\"Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KP revenue generation via hydropower projects increased - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-08-28T07:33:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-08-28T07:33:28+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hazafa Hasan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hazafa Hasan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KP revenue generation via hydropower projects increased - Zameen News","description":"Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html","og_locale":"en_US","og_type":"article","og_title":"KP revenue generation via hydropower projects increased - Zameen News","og_description":"Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years","og_url":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-08-28T07:33:27+00:00","article_modified_time":"2020-08-28T07:33:28+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","type":"image\/jpeg"}],"author":"Hazafa Hasan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Hazafa Hasan","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html"},"author":{"name":"Hazafa Hasan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b"},"headline":"KP revenue generation via hydropower projects increases by 100% in FY2019-20: report","datePublished":"2020-08-28T07:33:27+00:00","dateModified":"2020-08-28T07:33:28+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html"},"wordCount":236,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","keywords":["KP revenue generation via hydropower projects increases by 100%","Pakhtunkhwa Energy Development Organisation","Ranolia Hydropower project"],"articleSection":["Construction","Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html","url":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html","name":"KP revenue generation via hydropower projects increased - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","datePublished":"2020-08-28T07:33:27+00:00","dateModified":"2020-08-28T07:33:28+00:00","description":"Pakhtunkhwa Energy Development Organisation had doubled its revenue generation through hydropower projects in the last two years","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/kp-revenue-generation-via-hydropower-projects-increases-by-100-in-fy2019-20-report.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"KP revenue generation via hydropower projects increases by 100% in FY2019-20: report"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b","name":"Hazafa Hasan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","caption":"Hazafa Hasan"},"description":"Hazafa reveres the art of writing and has been turned into a property enthusiast by profession. Her daily survival kit includes; tea, coffee, keyboard and paperbacks.","url":"https:\/\/www.zameen.com\/news\/author\/hazafa"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/69741","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/75"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=69741"}],"version-history":[{"count":2,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/69741\/revisions"}],"predecessor-version":[{"id":69788,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/69741\/revisions\/69788"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/67875"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=69741"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=69741"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=69741"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=69741"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}