{"id":70049,"date":"2020-09-03T16:05:14","date_gmt":"2020-09-03T11:05:14","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=70049"},"modified":"2020-09-03T16:05:15","modified_gmt":"2020-09-03T11:05:15","slug":"test-run-for-karachi-circular-railways-new-carriages-expected-soon","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html","title":{"rendered":"Test run for Karachi Circular Railway\u2019s new carriages expected soon"},"content":{"rendered":"\n<p>Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter&#8217;s preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3. These carriages will run on the KCR track which is also being prepped for the first phase of the restoration project.<\/p>\n\n\n\n<p>Read: <a href=\"https:\/\/www.zameen.com\/news\/pr-karachi-division-clears-karachi-circular-railway-track-city-station-shah-latif.html\" target=\"_blank\" rel=\"noreferrer noopener\">PR Karachi Division clears Karachi Circular Railway track between City Station, Shah Latif<\/a><\/p>\n\n\n\n<p>According to details, the Pakistan Railways (PR) has cleared a 14-kilometre track of the KCR between Karachi City Station and Shah Abdul Latif Station near Orangi Town. As per the railways officials, the construction of carriages in currently underway at the Carriage Factory Rawalpindi. The first carriage will be transferred to Karachi in a few days and will be tested on the track under a trail run.<\/p>\n\n\n\n<p>Read: S<a href=\"https:\/\/www.zameen.com\/news\/sc-issues-orders-on-kcr-revival-construction-underpasses-flyovers.html\" target=\"_blank\" rel=\"noreferrer noopener\">C issues orders on construction of KCR underpasses, flyovers<\/a><\/p>\n\n\n\n<p>The carriage will also be properly inspected to determine if any additional facilities could be provided within them. Following the test run, a total of 25 carriages will be produced for the project.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter&#8217;s preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3. These carriages will run on the KCR track which is also being prepped for the first phase of the restoration project. Read: PR Karachi Division clears Karachi Circular Railway track between City Station, Shah Latif According to details, the Pakistan Railways (PR) has cleared a 14-kilometre track of the KCR between Karachi City Station and Shah Abdul Latif Station near Orangi Town. As per the railways officials, the construction of carriages in currently underway at the Carriage Factory Rawalpindi. The first carriage will be transferred to Karachi in a few days and will be tested on the track under a trail run. Read: SC issues orders on construction of KCR underpasses, flyovers The carriage will also be properly inspected to determine if any additional facilities could be provided within them. Following the test run, a total of 25 carriages will be produced for the project.<\/p>\n","protected":false},"author":57,"featured_media":61674,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15016],"tags":[38493,38492,38494],"persona":[],"class_list":{"0":"post-70049","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-new-developments","8":"tag-kcr-carriages","9":"tag-kcr-test-run","10":"tag-test-run-for-karachi-circular-railways-new-carriages-expected-soon","11":"cat-15016-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Test run for KCR\u2019s new carriages expected soon - Zameen News<\/title>\n<meta name=\"description\" content=\"Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter&#039;s preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Test run for KCR\u2019s new carriages expected soon - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter&#039;s preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-09-03T11:05:14+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-09-03T11:05:15+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/KCR-map.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1169\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Muhammad Farhad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Farhad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Test run for KCR\u2019s new carriages expected soon - Zameen News","description":"Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter's preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html","og_locale":"en_US","og_type":"article","og_title":"Test run for KCR\u2019s new carriages expected soon - Zameen News","og_description":"Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter's preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3.","og_url":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-09-03T11:05:14+00:00","article_modified_time":"2020-09-03T11:05:15+00:00","og_image":[{"width":1169,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/KCR-map.jpg","type":"image\/jpeg"}],"author":"Muhammad Farhad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Farhad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html"},"author":{"name":"Muhammad Farhad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9"},"headline":"Test run for Karachi Circular Railway\u2019s new carriages expected soon","datePublished":"2020-09-03T11:05:14+00:00","dateModified":"2020-09-03T11:05:15+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html"},"wordCount":195,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/KCR-map.jpg","keywords":["KCR carriages","KCR test run","Test run for Karachi Circular Railway\u2019s new carriages expected soon"],"articleSection":["New Developments"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html","url":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html","name":"Test run for KCR\u2019s new carriages expected soon - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/KCR-map.jpg","datePublished":"2020-09-03T11:05:14+00:00","dateModified":"2020-09-03T11:05:15+00:00","description":"Karachi: The test run for the Karachi Circular Railway (KCR)\u2019s new batch of carriages is expected soon; with the latter's preparation already having been initiated in a factory appointed for the purpose, a news source reported on September 3.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/KCR-map.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/KCR-map.jpg","width":1169,"height":400,"caption":"Karachi Circular Railway track map"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/test-run-for-karachi-circular-railways-new-carriages-expected-soon.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Test run for Karachi Circular Railway\u2019s new carriages expected soon"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9","name":"Muhammad Farhad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","caption":"Muhammad Farhad"},"description":"Muhammad Farhad is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/farhad-hassan"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/70049","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=70049"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/70049\/revisions"}],"predecessor-version":[{"id":70050,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/70049\/revisions\/70050"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/61674"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=70049"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=70049"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=70049"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=70049"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}