{"id":72665,"date":"2020-12-13T16:01:04","date_gmt":"2020-12-13T11:01:04","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=72665"},"modified":"2020-12-13T16:01:10","modified_gmt":"2020-12-13T11:01:10","slug":"timeline-issued-for-completion-of-malir-expressway","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html","title":{"rendered":"CM Murad issues timeline for completion of Malir Expressway project"},"content":{"rendered":"\n<p>Karachi: Sindh Chief Minister (CM) Syed Murad Ali Shah has directed the provincial minister for local government to complete the development work of Malir Expressway project within 2.5 years, a news source reported on December 11.<\/p>\n\n\n\n<p>CM Murad issued these directives during his visit to the project site to examine the development work. He was accompanied by Minister Saeed Ghani, Minister Syed Nasir Shah and other notable officials. The minister also held a media brief after the visit.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/malir-expressway-development-work-to-begin-in-december.html\" target=\"_blank\" rel=\"noreferrer noopener\">Development work on PKR 28bn-Malir Expressway project to begin in December<\/a><\/p>\n\n\n\n<p>Speaking to newsmen, Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of 100 kilometre per hour. The 39.40-kilometre-long expressway will be completed at a cost of PKR 27 billion. The expense includes construction of Korangi Flyover.<\/p>\n\n\n\n<p>The CM directed the concerned ministers to pace up the development work and ensure that the project is completed in 2.5 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Karachi: Sindh Chief Minister (CM) Syed Murad Ali Shah has directed the provincial minister for local government to complete the development work of Malir Expressway project within 2.5 years, a news source reported on December 11. CM Murad issued these directives during his visit to the project site to examine the development work. He was accompanied by Minister Saeed Ghani, Minister Syed Nasir Shah and other notable officials. The minister also held a media brief after the visit. Read: Development work on PKR 28bn-Malir Expressway project to begin in December Speaking to newsmen, Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of 100 kilometre per hour. The 39.40-kilometre-long expressway will be completed at a cost of PKR 27 billion. The expense includes construction of Korangi Flyover. The CM directed the concerned ministers to pace up the development work and ensure that the project is completed in 2.5 years.<\/p>\n","protected":false},"author":18,"featured_media":72666,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[44073,44074,44075],"persona":[],"class_list":{"0":"post-72665","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"tag-malir-expressway-news-and-updates","9":"tag-malir-expressway-project-details","10":"tag-timeline-issued-for-completion-of-malir-expressway-project","11":"cat-20385-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Timeline issued for completion of Malir Expressway - Zameen News<\/title>\n<meta name=\"description\" content=\"Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of....\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Timeline issued for completion of Malir Expressway - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2020-12-13T11:01:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2020-12-13T11:01:10+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/12\/malir-expressway.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Timeline issued for completion of Malir Expressway - Zameen News","description":"Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of....","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html","og_locale":"en_US","og_type":"article","og_title":"Timeline issued for completion of Malir Expressway - Zameen News","og_description":"Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of....","og_url":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2020-12-13T11:01:04+00:00","article_modified_time":"2020-12-13T11:01:10+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/12\/malir-expressway.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"CM Murad issues timeline for completion of Malir Expressway project","datePublished":"2020-12-13T11:01:04+00:00","dateModified":"2020-12-13T11:01:10+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html"},"wordCount":167,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/12\/malir-expressway.jpg","keywords":["Malir Expressway news and updates","Malir Expressway project details","Timeline issued for completion of Malir Expressway project"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html","url":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html","name":"Timeline issued for completion of Malir Expressway - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/12\/malir-expressway.jpg","datePublished":"2020-12-13T11:01:04+00:00","dateModified":"2020-12-13T11:01:10+00:00","description":"Murad said that the six-lane-wide Malir Expressway will be a dual carriageway featuring 3-metre wide shoulders. The expressway will allow speed limit of....","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/12\/malir-expressway.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/12\/malir-expressway.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/timeline-issued-for-completion-of-malir-expressway.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"CM Murad issues timeline for completion of Malir Expressway project"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/72665","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=72665"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/72665\/revisions"}],"predecessor-version":[{"id":72667,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/72665\/revisions\/72667"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/72666"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=72665"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=72665"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=72665"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=72665"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}