{"id":73582,"date":"2021-01-20T17:20:30","date_gmt":"2021-01-20T12:20:30","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=73582"},"modified":"2021-01-20T17:24:22","modified_gmt":"2021-01-20T12:24:22","slug":"development-underway-oasis-park-residencia","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html","title":{"rendered":"Rapid development underway in Oasis Park Residencia"},"content":{"rendered":"\n<p>Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia. The developers have reiterated their commitment to ensuring a safe and aesthetically-pleasing living environment for the residents.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/oasis-park-residencia-invites-karachiites-breakfast-project-site.html\" target=\"_blank\" rel=\"noreferrer noopener\">Oasis Park Residencia invites Karachiites to enjoy breakfast at project site<\/a><\/p>\n\n\n\n<p>Further, cat6 cables have been deployed through the project and pavers are being fixed along the streets. Work on model villa\u2019s roof garden is complete. To sum up, BRB Properties Builders &amp; Developers are pulling out all the stops to complete the development work on a timely basis in Oasis Park Residencia.<\/p>\n\n\n\n<p>Additional facilities planned for the project include:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Underground electricity cable<\/li><li>Dedicated security &amp; surveillance room<\/li><li>Firefighting services<\/li><li>24\/7 Electricity backup<\/li><li>Waste management<\/li><li>2.5 Lac Gallon Water Reservoir<\/li><li>Mosque<\/li><li>Community centre &amp; club house<\/li><li>Smart school<\/li><li>Ladies park<\/li><li>Children play area<\/li><li>Botanical garden &amp; urban forest<\/li><li>Indoor play area<\/li><li>Outdoor caf\u00e9<\/li><li>Automatic sprinkle &amp; drip irrigation system in parks<\/li><\/ul>\n\n\n\n<figure class=\"wp-block-embed is-type-video is-provider-youtube wp-block-embed-youtube wp-embed-aspect-16-9 wp-has-aspect-ratio\"><div class=\"wp-block-embed__wrapper\">\n<div class=\"youtube_embed_wrapper alia_embed_wrapper\"><!--ALIA start embed content--><iframe loading=\"lazy\" title=\"Oasis Park Residencia \u2013 Construction Update December 2020\" width=\"880\" height=\"495\" src=\"https:\/\/www.youtube.com\/embed\/3mB8N6qlSR4?feature=oembed\" frameborder=\"0\" allow=\"accelerometer; autoplay; clipboard-write; encrypted-media; gyroscope; picture-in-picture\" allowfullscreen><\/iframe><!--AliA end embed content--><\/div>\n<\/div><\/figure>\n\n\n\n<p><strong>Why invest in Oasis Park Residencia?<\/strong><\/p>\n\n\n\n<p>Approved by both SBCA and the Malir Development Authority, the project offers unique investment prospects; all of which can be availed on convenient payment plan options by both genuine buyers and investors. Further, interested parties can choose from three different categories of well-planned villas \u2013 each designed to allow for a greater degree of personalisation.<\/p>\n\n\n\n<p>It is pertinent to mention here that model villas are now open for viewing.<\/p>\n\n\n\n<p><strong>How to buy a unit in Oasis Park Residencia?<\/strong><\/p>\n\n\n\n<p>Zameen.com, the official sales and marketing partner for <a href=\"https:\/\/www.zameen.com\/new-projects\/oasis_park_residencia-1601.html\" target=\"_blank\" rel=\"noreferrer noopener\">Oasis Park Residencia<\/a>, has all the information you need on the project. To learn about pricing options or for details on instalment plans, you can reach out to us through the attached inquiry or Whatsapp form.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia. The developers have reiterated their commitment to ensuring a safe and aesthetically-pleasing living environment for the residents. Read: Oasis Park Residencia invites Karachiites to enjoy breakfast at project site Further, cat6 cables have been deployed through the project and pavers are being fixed along the streets. Work on model villa\u2019s roof garden is complete. To sum up, BRB Properties Builders &amp; Developers are pulling out all the stops to complete the development work on a timely basis in Oasis Park Residencia. Additional facilities planned for the project include: Underground electricity cable Dedicated security &amp; surveillance room Firefighting services 24\/7 Electricity backup Waste management 2.5 Lac Gallon Water Reservoir Mosque Community centre &amp; club house Smart school Ladies park Children play area Botanical garden &amp; urban forest Indoor play area Outdoor caf\u00e9 Automatic sprinkle &amp; drip irrigation system in parks Why invest in Oasis Park Residencia? Approved by both SBCA and the Malir Development Authority, the project offers unique investment prospects; all of which can be availed on convenient payment plan options by both genuine buyers and&hellip;<\/p>\n","protected":false},"author":57,"featured_media":71847,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15016,15019],"tags":[44985],"persona":[],"class_list":{"0":"post-73582","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-new-developments","8":"category-research-analysis","9":"tag-rapid-development-underway-in-oasis-park-residencia","10":"cat-15016-id","11":"cat-15019-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rapid development underway in Oasis Park Residencia - Zameen News<\/title>\n<meta name=\"description\" content=\"Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rapid development underway in Oasis Park Residencia - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-01-20T12:20:30+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-01-20T12:24:22+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/01\/Oasis-Park-Residencia-FB.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Muhammad Farhad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Farhad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rapid development underway in Oasis Park Residencia - Zameen News","description":"Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html","og_locale":"en_US","og_type":"article","og_title":"Rapid development underway in Oasis Park Residencia - Zameen News","og_description":"Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia.","og_url":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-01-20T12:20:30+00:00","article_modified_time":"2021-01-20T12:24:22+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/01\/Oasis-Park-Residencia-FB.jpg","type":"image\/jpeg"}],"author":"Muhammad Farhad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Farhad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html"},"author":{"name":"Muhammad Farhad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9"},"headline":"Rapid development underway in Oasis Park Residencia","datePublished":"2021-01-20T12:20:30+00:00","dateModified":"2021-01-20T12:24:22+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html"},"wordCount":306,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/11\/oasis-park-residencia.jpg","keywords":["Rapid development underway in Oasis Park Residencia"],"articleSection":["New Developments","Research &amp; Analysis"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html","url":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html","name":"Rapid development underway in Oasis Park Residencia - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/11\/oasis-park-residencia.jpg","datePublished":"2021-01-20T12:20:30+00:00","dateModified":"2021-01-20T12:24:22+00:00","description":"Karachi: Construction work, including the development of park and the installation of CCTV cameras, is underway at a rapid pace in Oasis Park Residencia.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/11\/oasis-park-residencia.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/11\/oasis-park-residencia.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/development-underway-oasis-park-residencia.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Rapid development underway in Oasis Park Residencia"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9fc1132e74cdd346f201633b8d1cebc9","name":"Muhammad Farhad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/13eadb15a0125b6648e56703aaf7543058fea376b06a73209cde68f09b9b093d?s=96&d=mm&r=g","caption":"Muhammad Farhad"},"description":"Muhammad Farhad is a Content Developer at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/farhad-hassan"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/73582","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/57"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=73582"}],"version-history":[{"count":5,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/73582\/revisions"}],"predecessor-version":[{"id":73596,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/73582\/revisions\/73596"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/71847"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=73582"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=73582"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=73582"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=73582"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}