{"id":74617,"date":"2021-03-04T18:32:34","date_gmt":"2021-03-04T13:32:34","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=74617"},"modified":"2021-03-10T18:09:06","modified_gmt":"2021-03-10T13:09:06","slug":"storm-water-drain-85-complete-at-zameen-ace-mall","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html","title":{"rendered":"Rapid development work underway at Zameen Ace Mall project site"},"content":{"rendered":"\n<p>Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water drain is 85% complete, while work for the construction of the storm water drain\u2019s wall shuttering is currently underway. The storm water drain runs 8 ft underground, parallel to road level, and is expected to be completed in three weeks.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1-1024x536.jpg\" alt=\"\" class=\"wp-image-74622\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1-1024x536.jpg 1024w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1-300x157.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1-768x402.jpg 768w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1-764x400.jpg 764w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1-420x220.jpg 420w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/1.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Excavation work underway at Zameen Ace Mall site<\/figcaption><\/figure>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/solid-prospects-raise-demand-for-zameen-ace-mall.html\" target=\"_blank\" rel=\"noreferrer noopener\">Fast-paced development, solid investment prospects raise demand for Zameen Ace Mall commercial units<\/a><\/p>\n\n\n\n<p>In our previous development update of Zameen Ace Mall, the crew had announced the launch of piling work, which has now been 35% completed. The on-ground crew working on the project is executing piling and the remaining excavation work simultaneously. Once the storm water drains at the Zameen Ace Mall have been constructed, the excavation work at the project site will pick up pace. <\/p>\n\n\n\n<p>Here are some of the latest pictures from the project site:<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"536\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2-1024x536.jpg\" alt=\"\" class=\"wp-image-74623\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2-1024x536.jpg 1024w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2-300x157.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2-768x402.jpg 768w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2-764x400.jpg 764w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2-420x220.jpg 420w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/2.jpg 1200w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1200\" height=\"628\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6-1024x536.jpg\" alt=\"\" class=\"wp-image-74625\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6-1024x536.jpg 1024w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6-300x157.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6-768x402.jpg 768w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6-764x400.jpg 764w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6-420x220.jpg 420w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/03\/6.jpg 1200w\" sizes=\"auto, (max-width: 1200px) 100vw, 1200px\" \/><figcaption>Piling and excavation work being executed at Zameen Ace Mall site<\/figcaption><\/figure>\n\n\n\n<p><strong>Zameen Ace Mall: An iconic landmark in the making<\/strong><\/p>\n\n\n\n<p>The Zameen Ace Mall is one of the most eagerly-awaited projects that\u2019s being developed jointly by three renowned real estate entities of Pakistan; Zameen Developments, Ace Group, and MIH Group. The project features apartments, food outlets, hotel apartments, penthouses and commercial shops, that have all been designed and planned to provide potential customers with the kind of quality people usually associate with high-end real estate developments. Located in Defence Housing Authority (DHA) Phase II, the project spans over 14 storeys and is sure to become an iconic landmark of the city.<\/p>\n\n\n\n<p><strong>How to book a unit in Zameen Ace Mall?<\/strong><\/p>\n\n\n\n<p>There are only a few units left for sale in the Zameen Ace Mall. So, if you are planning to invest, you should hurry and reach out to us through WhatsApp or fill the form on this webpage. In case of any queries, please leave us a comment below.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water drain is 85% complete, while work for the construction of the storm water drain\u2019s wall shuttering is currently underway. The storm water drain runs 8 ft underground, parallel to road level, and is expected to be completed in three weeks. Read: Fast-paced development, solid investment prospects raise demand for Zameen Ace Mall commercial units In our previous development update of Zameen Ace Mall, the crew had announced the launch of piling work, which has now been 35% completed. The on-ground crew working on the project is executing piling and the remaining excavation work simultaneously. Once the storm water drains at the Zameen Ace Mall have been constructed, the excavation work at the project site will pick up pace. Here are some of the latest pictures from the project site: Zameen Ace Mall: An iconic landmark in the making The Zameen Ace Mall is one of the most eagerly-awaited projects that\u2019s being developed jointly by three renowned real estate entities of Pakistan; Zameen Developments, Ace Group, and MIH Group. The project features apartments, food outlets, hotel apartments, penthouses&hellip;<\/p>\n","protected":false},"author":75,"featured_media":69505,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15016,15017],"tags":[24715,45411,45409,45403,45407,45408],"persona":[],"class_list":{"0":"post-74617","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-new-developments","8":"category-notices-announcements","9":"tag-slider-2","10":"tag-islamabad-shops-for-sale-on-installments","11":"tag-promising-commercial-investments-in-islamabad","12":"tag-storm-water-drain-installation-85-complete-at-zameen-ace-mall","13":"tag-zameen-ace-mall-construction-status-march-2021","14":"tag-zameen-ace-mall-latest-updates-on-development-work","15":"cat-15016-id","16":"cat-15017-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Rapid development work underway at Zameen Ace Mall - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Rapid development work underway at Zameen Ace Mall - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-04T13:32:34+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-03-10T13:09:06+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/01\/ZAM-Image.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Hazafa Hasan\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Hazafa Hasan\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Rapid development work underway at Zameen Ace Mall - Zameen News","description":"Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html","og_locale":"en_US","og_type":"article","og_title":"Rapid development work underway at Zameen Ace Mall - Zameen News","og_description":"Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water","og_url":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-03-04T13:32:34+00:00","article_modified_time":"2021-03-10T13:09:06+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/01\/ZAM-Image.jpg","type":"image\/jpeg"}],"author":"Hazafa Hasan","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Hazafa Hasan","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html"},"author":{"name":"Hazafa Hasan","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b"},"headline":"Rapid development work underway at Zameen Ace Mall project site","datePublished":"2021-03-04T13:32:34+00:00","dateModified":"2021-03-10T13:09:06+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html"},"wordCount":337,"commentCount":1,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/08\/Zameen-ace-mall.jpg","keywords":["#slider","islamabad shops for sale on installments","promising commercial investments in Islamabad","Storm water drain installation 85% complete at Zameen Ace Mall","Zameen Ace Mall construction status March 2021","Zameen Ace mall latest updates on development work"],"articleSection":["New Developments","Notices &amp; Announcements"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html","url":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html","name":"Rapid development work underway at Zameen Ace Mall - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/08\/Zameen-ace-mall.jpg","datePublished":"2021-03-04T13:32:34+00:00","dateModified":"2021-03-10T13:09:06+00:00","description":"Islamabad: The latest developments from the project site of the much-anticipated Zameen Ace Mall reveal that development work related to the storm water","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/08\/Zameen-ace-mall.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/08\/Zameen-ace-mall.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/storm-water-drain-85-complete-at-zameen-ace-mall.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Rapid development work underway at Zameen Ace Mall project site"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/422fcc128fcaf82dae8406d1cf62a52b","name":"Hazafa Hasan","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Avatar-Icon-96x96.jpg","caption":"Hazafa Hasan"},"description":"Hazafa reveres the art of writing and has been turned into a property enthusiast by profession. Her daily survival kit includes; tea, coffee, keyboard and paperbacks.","url":"https:\/\/www.zameen.com\/news\/author\/hazafa"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/74617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/75"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=74617"}],"version-history":[{"count":6,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/74617\/revisions"}],"predecessor-version":[{"id":74642,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/74617\/revisions\/74642"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/69505"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=74617"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=74617"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=74617"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=74617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}