{"id":75131,"date":"2021-03-26T10:00:00","date_gmt":"2021-03-26T05:00:00","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=75131"},"modified":"2021-03-25T14:16:12","modified_gmt":"2021-03-25T09:16:12","slug":"work-on-dadhucha-dam-now-15pc-complete","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html","title":{"rendered":"Work on Dadhucha Dam now 15pc complete"},"content":{"rendered":"\n<p>Rawalpindi: Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam has been accomplished in two and half a months, as reported by a news source.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a rel=\"noreferrer noopener\" href=\"https:\/\/www.zameen.com\/news\/irrigation-dept-updates-progress-on-daducha-dam.html\" target=\"_blank\"><a href=\"https:\/\/www.zameen.com\/news\/daducha-dam-construction-begins.html\">Daducha Dam construction begins<\/a><\/a><\/p>\n\n\n\n<p>Mr. Mohammed Mehmood chaired a meeting which was organized to review the constructional progress on the dam and he termed the completion of this project as a benefit to public interest. The same meeting was attended by chief engineer of Potohar region, Moin Qureishi, executive engineer Small Dams Rawalpindi Maqbool Ahmad and additional deputy commissioner Revenue, retired Capt Mohammad Shoaib.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/irrigation-dept-updates-progress-on-daducha-dam.html\" target=\"_blank\" rel=\"noreferrer noopener\">Irrigation dept shares construction updates on Daducha Dam<\/a><\/p>\n\n\n\n<p>The commissioner stated that the project was on the fast track to completed and that heavy machinery was engaged to work on the dam\u2019s spillway and excavation. He termed the project a necessity to accommodate the water supply needs of Rawalpindi, noting that the requirement for the city was 72 to 75 million gallons per day. This figure is expected to reach 100 million gallons by 2030 and the demand will be difficult to meet without the Daducha Dam.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Rawalpindi: Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam has been accomplished in two and half a months, as reported by a news source. Read: Daducha Dam construction begins Mr. Mohammed Mehmood chaired a meeting which was organized to review the constructional progress on the dam and he termed the completion of this project as a benefit to public interest. The same meeting was attended by chief engineer of Potohar region, Moin Qureishi, executive engineer Small Dams Rawalpindi Maqbool Ahmad and additional deputy commissioner Revenue, retired Capt Mohammad Shoaib. Read: Irrigation dept shares construction updates on Daducha Dam The commissioner stated that the project was on the fast track to completed and that heavy machinery was engaged to work on the dam\u2019s spillway and excavation. He termed the project a necessity to accommodate the water supply needs of Rawalpindi, noting that the requirement for the city was 72 to 75 million gallons per day. This figure is expected to reach 100 million gallons by 2030 and the demand will be difficult to meet without the Daducha Dam.<\/p>\n","protected":false},"author":82,"featured_media":63632,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385,15016],"tags":[44346,44940,6967,32265],"persona":[],"class_list":{"0":"post-75131","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"category-new-developments","9":"tag-daducha-dam","10":"tag-daducha-dam-construction-updates","11":"tag-dam","12":"tag-small-dams-organisation","13":"cat-20385-id","14":"cat-15016-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Work on Dadhucha Dam now 15pc complete - Zameen News<\/title>\n<meta name=\"description\" content=\"Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam had been accomplished.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Work on Dadhucha Dam now 15pc complete - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam had been accomplished.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-03-26T05:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"waleed shafi\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"waleed shafi\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Work on Dadhucha Dam now 15pc complete - Zameen News","description":"Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam had been accomplished.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html","og_locale":"en_US","og_type":"article","og_title":"Work on Dadhucha Dam now 15pc complete - Zameen News","og_description":"Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam had been accomplished.","og_url":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-03-26T05:00:00+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","type":"image\/jpeg"}],"author":"waleed shafi","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"waleed shafi","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html"},"author":{"name":"waleed shafi","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/537a1428d241fd34f305a2a4d4da8cec"},"headline":"Work on Dadhucha Dam now 15pc complete","datePublished":"2021-03-26T05:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html"},"wordCount":189,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","keywords":["Daducha Dam","Daducha Dam construction updates","dam","Small Dams Organisation"],"articleSection":["Infrastructure","New Developments"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html","url":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html","name":"Work on Dadhucha Dam now 15pc complete - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","datePublished":"2021-03-26T05:00:00+00:00","description":"Commissioner retired Capt Mohammed Mehmood announced on Wednesday that 15 percent of the work on Daducha Dam had been accomplished.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/work-on-dadhucha-dam-now-15pc-complete.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Work on Dadhucha Dam now 15pc complete"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/537a1428d241fd34f305a2a4d4da8cec","name":"waleed shafi","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/secure.gravatar.com\/avatar\/6c84b76c33c83ef69d322e588c749349522ba6a2ceec40f4a51b6dcf02cacbf7?s=96&d=mm&r=g","url":"https:\/\/secure.gravatar.com\/avatar\/6c84b76c33c83ef69d322e588c749349522ba6a2ceec40f4a51b6dcf02cacbf7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/6c84b76c33c83ef69d322e588c749349522ba6a2ceec40f4a51b6dcf02cacbf7?s=96&d=mm&r=g","caption":"waleed shafi"},"sameAs":["http:\/\/zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/waleedshafi"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/75131","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/82"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=75131"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/75131\/revisions"}],"predecessor-version":[{"id":75132,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/75131\/revisions\/75132"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/63632"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=75131"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=75131"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=75131"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=75131"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}