{"id":76756,"date":"2021-06-08T18:14:54","date_gmt":"2021-06-08T13:14:54","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=76756"},"modified":"2021-06-09T12:33:49","modified_gmt":"2021-06-09T07:33:49","slug":"zameen-aurum-construction-updates-june-2021","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html","title":{"rendered":"Zameen Aurum Lahore \u2014 Construction Updates, June 2021"},"content":{"rendered":"\n<p>Zameen Aurum Lahore \u2014Construction Updates June 2021<\/p>\n\n\n\n<p>Lahore: Marketed as \u2018The Height of Luxury\u2019, Zameen Aurum is a 15-storey structure spanning across an area of 4 kanals. Zameen Developments \u2014 the project developer and sister concern of Zameen.com \u2014 has ensured the delivery of best quality, including a prestigious location and comprehensive inventory.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Project Details<\/strong><\/h1>\n\n\n\n<p>Entirely designed by the in-house team of DESIGNS by Zameen Development, Zameen Aurum Lahore offers studio, 1-bed, 2-bed, and 3-bed apartments, along with single-storey and duplex penthouses. Centrally located in Gulberg III, the earthquake-resistant building comes equipped with high-end facilities. These include, but are not limited to, three dedicated basements for parking, e-tag-controlled automated entry system, 24\/7 security and surveillance, 24\/7 power backup, grand lobby, and rooftop seating area. &nbsp;<\/p>\n\n\n\n<p><strong>Read:<\/strong><a rel=\"noreferrer noopener\" href=\"https:\/\/www.zameen.com\/news\/zameen-aurum-90-sold-limited-investment-window.html\" target=\"_blank\"> Zameen Aurum 90% sold, limited-period investment window available for buyers<\/a><\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Construction Updates<\/strong><\/h1>\n\n\n\n<p>Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase 1 have already been completed. Meanwhile, the retaining walls and columns of basement 3 have also reached completion. On the other hand, the formwork of the slab is being erected.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2-1024x576.jpg\" alt=\"\" class=\"wp-image-76778\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2-1024x576.jpg 1024w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2-300x170.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2-768x432.jpg 768w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2-711x400.jpg 711w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2-409x230.jpg 409w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/2.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Construction work in progress at Zameen Aurum&#8217;s site.<\/figcaption><\/figure>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3-1024x576.jpg\" alt=\"\" class=\"wp-image-76780\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3-1024x576.jpg 1024w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3-300x170.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3-768x432.jpg 768w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3-711x400.jpg 711w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3-409x230.jpg 409w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/3.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>A close-up of construction work underway on site.<\/figcaption><\/figure>\n\n\n\n<p>The structural components such as columns, retaining walls, slabs, and raft bear transfer the gravity and lateral loads on the structure to the soil underneath providing stability to the building.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img loading=\"lazy\" decoding=\"async\" width=\"1024\" height=\"576\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1-1024x576.jpg\" alt=\"\" class=\"wp-image-76781\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1-1024x576.jpg 1024w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1-300x170.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1-768x432.jpg 768w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1-711x400.jpg 711w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1-409x230.jpg 409w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/1.jpg 1440w\" sizes=\"auto, (max-width: 1024px) 100vw, 1024px\" \/><figcaption>Construction work continues at night<\/figcaption><\/figure>\n\n\n\n<p>The team is also in the process of planning the excavation works of phase 2, which will help in expediting the grey structure works. Another major development is the installation of the tower crane. Complete installation of the crane will be done within this month \u2014 helping in speeding up the progress as material handling becomes more convenient and efficient with it.<\/p>\n\n\n\n<h1 class=\"wp-block-heading\"><strong>Investment in Zameen Aurum<\/strong><\/h1>\n\n\n\n<p>The project is not only ideal for genuine residential buyers but a profitable option for investors too. It is safe and reliable to invest in Zameen Aurum due to a wide array of reasons.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/zameen-aurums-investment-potential-enhanced.html\">Zameen Aurum\u2019s investment potential enhanced with tempting capital gains, ROI &amp; rental yield<\/a><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>Approved by Lahore Development Authority (LDA)<\/li><li>Marketing &amp; Sales by Zameen.com<\/li><li>Quality Assurance &amp; Project Management by Zameen Developments<\/li><li>Ideal Location &amp; Premium Facilities<\/li><li>5% to 7% Annual Rental Yield Expected<\/li><li>50% to 60% Projected Increase in Real Estate Prices in the Vicinity over Next 3 Years<\/li><\/ul>\n\n\n\n<p>If you are interested in booking a unit in Zameen Aurum, you receive the require details from Zameen.com. For this purpose, please use the attached WhatsApp or inquiry form. For latest developments on the project, keep reading Zameen News.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Zameen Aurum Lahore \u2014Construction Updates June 2021 Lahore: Marketed as \u2018The Height of Luxury\u2019, Zameen Aurum is a 15-storey structure spanning across an area of 4 kanals. Zameen Developments \u2014 the project developer and sister concern of Zameen.com \u2014 has ensured the delivery of best quality, including a prestigious location and comprehensive inventory. Project Details Entirely designed by the in-house team of DESIGNS by Zameen Development, Zameen Aurum Lahore offers studio, 1-bed, 2-bed, and 3-bed apartments, along with single-storey and duplex penthouses. Centrally located in Gulberg III, the earthquake-resistant building comes equipped with high-end facilities. These include, but are not limited to, three dedicated basements for parking, e-tag-controlled automated entry system, 24\/7 security and surveillance, 24\/7 power backup, grand lobby, and rooftop seating area. &nbsp; Read: Zameen Aurum 90% sold, limited-period investment window available for buyers Construction Updates Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase 1 have already been completed. Meanwhile, the retaining walls and columns of basement 3 have also reached completion. On the other hand, the formwork of the slab is being erected. The structural components such as columns, retaining&hellip;<\/p>\n","protected":false},"author":18,"featured_media":71593,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15019],"tags":[46198,46197,46199,46196],"persona":[],"class_list":{"0":"post-76756","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-research-analysis","8":"tag-aurum-construction-updates","9":"tag-aurum-lahore-construction-june-2021","10":"tag-zameen-aurum-lahore-construction-updates","11":"tag-zameen-projects-in-lahore","12":"cat-15019-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Zameen Aurum Lahore: Construction Updates, June 2021 - Zameen News<\/title>\n<meta name=\"description\" content=\"Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Zameen Aurum Lahore: Construction Updates, June 2021 - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-06-08T13:14:54+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-06-09T07:33:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/Zameen-Aurum.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Samra Zulfiqar\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Samra Zulfiqar\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Zameen Aurum Lahore: Construction Updates, June 2021 - Zameen News","description":"Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html","og_locale":"en_US","og_type":"article","og_title":"Zameen Aurum Lahore: Construction Updates, June 2021 - Zameen News","og_description":"Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase...","og_url":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-06-08T13:14:54+00:00","article_modified_time":"2021-06-09T07:33:49+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/06\/Zameen-Aurum.jpg","type":"image\/jpeg"}],"author":"Samra Zulfiqar","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Samra Zulfiqar","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html"},"author":{"name":"Samra Zulfiqar","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293"},"headline":"Zameen Aurum Lahore \u2014 Construction Updates, June 2021","datePublished":"2021-06-08T13:14:54+00:00","dateModified":"2021-06-09T07:33:49+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html"},"wordCount":439,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/aurum-11.jpg","keywords":["Aurum construction updates","Aurum lahore construction june 2021","Zameen Aurum Lahore: Construction Updates","zameen projects in lahore"],"articleSection":["Research &amp; Analysis"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html","url":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html","name":"Zameen Aurum Lahore: Construction Updates, June 2021 - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/aurum-11.jpg","datePublished":"2021-06-08T13:14:54+00:00","dateModified":"2021-06-09T07:33:49+00:00","description":"Construction works at Zameen Aurum site are underway at a rapid pace in order to meet the stipulated delivery schedules. The foundation works of phase...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/aurum-11.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/aurum-11.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/zameen-aurum-construction-updates-june-2021.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Zameen Aurum Lahore \u2014 Construction Updates, June 2021"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/9810bc80e0f6830dcb87310b88ef6293","name":"Samra Zulfiqar","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Samra-96x96.jpg","caption":"Samra Zulfiqar"},"description":"Samra Zulfiqar, a real estate analyst at Zameen.com, is passionate about finding projects that offer buyers the best returns. Her keen insights spotlight the market\u2019s most promising opportunities.","url":"https:\/\/www.zameen.com\/news\/author\/samra"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/76756","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=76756"}],"version-history":[{"count":3,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/76756\/revisions"}],"predecessor-version":[{"id":76799,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/76756\/revisions\/76799"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/71593"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=76756"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=76756"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=76756"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=76756"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}