{"id":78232,"date":"2021-07-29T10:00:00","date_gmt":"2021-07-29T05:00:00","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=78232"},"modified":"2021-07-28T17:30:00","modified_gmt":"2021-07-28T12:30:00","slug":"cpec-karot-hydropower-complete-april-2022","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html","title":{"rendered":"CPEC Projects: Karot hydropower project to complete by April 2022"},"content":{"rendered":"\n<p>Islamabad: The construction work on the 720-megawatt (MW) Karot <a href=\"https:\/\/www.zameen.com\/news\/mini-hydro-projects-inaugurated-in-chitral-valley.html\" data-type=\"post\" data-id=\"78122\" target=\"_blank\" rel=\"noreferrer noopener\">hydropower project<\/a> being developed on River Jehlum is 88% complete, and the project is expected to be connected to the national grid by April 2021, news sources reported.\u00a0<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/national-grid-to-get-12464mw-power-from-ipp-projects.html\" target=\"_blank\" rel=\"noreferrer noopener\">National grid to get 12,464MW power from IPP projects<\/a><\/p>\n\n\n\n<p>The project, which is part of the flagship China Pakistan Economic Corridor (CPEC), is being developed under the Build-Own-Operate-Transfer (BOOT) model and is worth USD 1.98 billion. The actual cost of the project will be around USD 1.698 billion, with the remainder being interest on the loan.<\/p>\n\n\n\n<p>Reportedly, the Karot Power Company, which includes M\/s Three Gorges South Asia Investment Ltd (TGSAIL) and Associated Technologies (Pvt) Ltd of Pakistan, is developing the project.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/pm-timely-completion-cpec-projects-avert-cost-escalation.html\" target=\"_blank\" rel=\"noreferrer noopener\">PM for timely completion of CPEC projects to avert cost escalation<\/a><\/p>\n\n\n\n<p>It was highlighted that the project directly employed 5,000 local residents and attracted USD 1.7 billion in direct foreign investment (DFI). According to the National Electric Power Regulatory Authority, if completed, the project would provide 3.249 billion units of green energy to the national grid at a rate of 7.57 cents per unit for the next 30 years.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The construction work on the 720-megawatt (MW) Karot hydropower project being developed on River Jehlum is 88% complete, and the project is expected to be connected to the national grid by April 2021, news sources reported.\u00a0 Read: National grid to get 12,464MW power from IPP projects The project, which is part of the flagship China Pakistan Economic Corridor (CPEC), is being developed under the Build-Own-Operate-Transfer (BOOT) model and is worth USD 1.98 billion. The actual cost of the project will be around USD 1.698 billion, with the remainder being interest on the loan. Reportedly, the Karot Power Company, which includes M\/s Three Gorges South Asia Investment Ltd (TGSAIL) and Associated Technologies (Pvt) Ltd of Pakistan, is developing the project. Read: PM for timely completion of CPEC projects to avert cost escalation It was highlighted that the project directly employed 5,000 local residents and attracted USD 1.7 billion in direct foreign investment (DFI). According to the National Electric Power Regulatory Authority, if completed, the project would provide 3.249 billion units of green energy to the national grid at a rate of 7.57 cents per unit for the next 30 years.<\/p>\n","protected":false},"author":84,"featured_media":67875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013],"tags":[24102,47104],"persona":[],"class_list":{"0":"post-78232","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-karot-hydropower-project","9":"tag-karot-hydropower-project-of-cpec-to-be-complete-by-2022","10":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CPEC Karot hydropower project to complete by April 2022 - Zameen News<\/title>\n<meta name=\"description\" content=\"Islamabad: The construction work on the 720-megawatt (MW) Karot hydropower project being developed on River Jehlum is 88% complete, and the project is\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CPEC Karot hydropower project to complete by April 2022 - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Islamabad: The construction work on the 720-megawatt (MW) Karot hydropower project being developed on River Jehlum is 88% complete, and the project is\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-07-29T05:00:00+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CPEC Karot hydropower project to complete by April 2022 - Zameen News","description":"Islamabad: The construction work on the 720-megawatt (MW) Karot hydropower project being developed on River Jehlum is 88% complete, and the project is","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html","og_locale":"en_US","og_type":"article","og_title":"CPEC Karot hydropower project to complete by April 2022 - Zameen News","og_description":"Islamabad: The construction work on the 720-megawatt (MW) Karot hydropower project being developed on River Jehlum is 88% complete, and the project is","og_url":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-07-29T05:00:00+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"CPEC Projects: Karot hydropower project to complete by April 2022","datePublished":"2021-07-29T05:00:00+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html"},"wordCount":191,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","keywords":["Karot hydropower project","Karot hydropower project of CPEC to be complete by 2022"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html","url":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html","name":"CPEC Karot hydropower project to complete by April 2022 - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","datePublished":"2021-07-29T05:00:00+00:00","description":"Islamabad: The construction work on the 720-megawatt (MW) Karot hydropower project being developed on River Jehlum is 88% complete, and the project is","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/cpec-karot-hydropower-complete-april-2022.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"CPEC Projects: Karot hydropower project to complete by April 2022"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/78232","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=78232"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/78232\/revisions"}],"predecessor-version":[{"id":78233,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/78232\/revisions\/78233"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/67875"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=78232"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=78232"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=78232"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=78232"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}