{"id":79522,"date":"2021-09-09T11:13:31","date_gmt":"2021-09-09T06:13:31","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=79522"},"modified":"2021-09-15T15:39:50","modified_gmt":"2021-09-15T10:39:50","slug":"finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html","title":{"rendered":"Finishing work begins at Karachi&#8217;s Cliff Vista project; 85% grey structure completed"},"content":{"rendered":"\n<p>Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers A and B already have their paint jobs completed. The work on Tower A&#8217;s 12th storey, as well as Tower B&#8217;s 15th floor and Tower C&#8217;s 8th floor, has been finished. Shuttering work on Tower D&#8217;s seventh level is currently getting started. In the near future, the project will begin handing over possession to consumers.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/cliff-vista-karachi-offering-35-return-1-year.html\" target=\"_blank\" rel=\"noreferrer noopener\">Cliff Vista-Karachi offers 35% returns in one year<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Best community living experience with location advantages<\/strong><\/h2>\n\n\n\n<p>Cliff Vista, located on key Rashid Minhas Road, close to Pavilion End Club, provides an easy and accessible position advantage with access from and to the entire city via main routes. Its location merits include the availability of public transit 24 hours a day, as well as its proximity to entertainment and retail centres. It&#8217;s a 2-minute drive from Nipa Chowrangi and Millennium Mall, a 5-minute drive from Lucky One Mall, and a 10-minute drive from Karachi University and Jinnah International Airport.<\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Amenities for a comfortable living experience<\/strong><\/h2>\n\n\n\n<p>At Cliff Vista, each family and each unit is treated as a separate unit with four sides open, making it a secure and private living experience. Some of the other amenities exclusively provided are:<\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>In-house departmental store<\/li><li>Continuous power supply with standby generator<\/li><li>Spacious and dedicated car parking<\/li><li>Two high-tech lifts per tower<\/li><li>Food court<\/li><li>Study room<\/li><li>Multi-purpose community hall<\/li><li>Prayer area<\/li><li>CCTV surveillance<\/li><li>Swimming pool<\/li><li>Gymnasium<\/li><\/ul>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/cliff-vista-karachis-high-demand-among-end-users-piques-investors-interest.html\" target=\"_blank\" rel=\"noreferrer noopener\">Cliff Vista-Karachi\u2019s high demand among end users piques investors\u2019 interest<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Investment prospects in Cliff Vista<\/strong><\/h2>\n\n\n\n<p>The Cliff Vista is widely considered by market experts as the future of high-rise living, offering unparalleled facilities and investment opportunities. The project is 85 % complete, and delivery is scheduled to begin over the next two to three years. Customers may now inspect model fully furnished apartments. In addition, the Cliff Vista project is estimated to yield a 30 to 35 % return on investment in the short to medium term. What&#8217;s more? The developer has also guaranteed a 5% yearly rental income. The project has received NOC from the Faisal Cantonment Board to increase its security. The apartments are offered with 36 monthly payments and a 30% down payment.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/cliff-vista-development-updates.html\">Deve<\/a><a href=\"https:\/\/www.zameen.com\/news\/cliff-vista-development-updates.html\" target=\"_blank\" rel=\"noreferrer noopener\">l<\/a><a href=\"https:\/\/www.zameen.com\/news\/cliff-vista-development-updates.html\">opment updates on Karachi\u2019s favourite apartment project Cliff Vista<\/a><\/p>\n\n\n\n<h2 class=\"wp-block-heading\"><strong>Become part of Cliff Vista<\/strong><\/h2>\n\n\n\n<p>Do you want to be a part of Cliff Vista? Zameen.com provides the details you require to make the best investing decision. We are the project&#8217;s official Sales and Marketing partner. Send us a WhatsApp message or fill out the form below, and we&#8217;ll take care of the rest.<\/p>\n\n\n\n<p>Continue to visit Zameen News for more investment-related news and activities.<\/p>\n\n\n\n<p>.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers A and B already have their paint jobs completed. The work on Tower A&#8217;s 12th storey, as well as Tower B&#8217;s 15th floor and Tower C&#8217;s 8th floor, has been finished. Shuttering work on Tower D&#8217;s seventh level is currently getting started. In the near future, the project will begin handing over possession to consumers. Read: Cliff Vista-Karachi offers 35% returns in one year Best community living experience with location advantages Cliff Vista, located on key Rashid Minhas Road, close to Pavilion End Club, provides an easy and accessible position advantage with access from and to the entire city via main routes. Its location merits include the availability of public transit 24 hours a day, as well as its proximity to entertainment and retail centres. It&#8217;s a 2-minute drive from Nipa Chowrangi and Millennium Mall, a 5-minute drive from Lucky One Mall, and a 10-minute drive from Karachi University and Jinnah International Airport. Amenities for a comfortable living experience At Cliff Vista, each family and each unit is treated as a separate unit with four sides&hellip;<\/p>\n","protected":false},"author":84,"featured_media":71102,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15019],"tags":[48060,48061],"persona":[],"class_list":{"0":"post-79522","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-research-analysis","8":"tag-finishing-work-begins-at-karachis-cliff-vista-project","9":"tag-karachis-cliff-vista-project","10":"cat-15019-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Karachi&#039;s Cliff Vista project, 85% grey structure completed - Zameen News<\/title>\n<meta name=\"description\" content=\"Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Karachi&#039;s Cliff Vista project, 85% grey structure completed - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-09T06:13:31+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-15T10:39:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/08\/Cliff-Vista.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Karachi's Cliff Vista project, 85% grey structure completed - Zameen News","description":"Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html","og_locale":"en_US","og_type":"article","og_title":"Karachi's Cliff Vista project, 85% grey structure completed - Zameen News","og_description":"Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers","og_url":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-09-09T06:13:31+00:00","article_modified_time":"2021-09-15T10:39:50+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/08\/Cliff-Vista.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"Finishing work begins at Karachi&#8217;s Cliff Vista project; 85% grey structure completed","datePublished":"2021-09-09T06:13:31+00:00","dateModified":"2021-09-15T10:39:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html"},"wordCount":466,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/Cliff-Vista.jpg","keywords":["Finishing work begins at Karachi&#039;s Cliff Vista project","Karachi&#039;s Cliff Vista project"],"articleSection":["Research &amp; Analysis"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html","url":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html","name":"Karachi's Cliff Vista project, 85% grey structure completed - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/Cliff-Vista.jpg","datePublished":"2021-09-09T06:13:31+00:00","dateModified":"2021-09-15T10:39:50+00:00","description":"Karachi: Cliff Vista, a multi-story high rise in Gulshan-e-Iqbal, is in the last stages of construction, with the grey structure completed to 85%. Towers","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/Cliff-Vista.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/10\/Cliff-Vista.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/finishing-work-begins-at-karachis-cliff-vista-project-grey-structure-completed-by-85.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Finishing work begins at Karachi&#8217;s Cliff Vista project; 85% grey structure completed"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/79522","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=79522"}],"version-history":[{"count":4,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/79522\/revisions"}],"predecessor-version":[{"id":79709,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/79522\/revisions\/79709"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/71102"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=79522"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=79522"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=79522"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=79522"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}