{"id":79614,"date":"2021-09-15T11:51:27","date_gmt":"2021-09-15T06:51:27","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=79614"},"modified":"2021-09-15T14:28:32","modified_gmt":"2021-09-15T09:28:32","slug":"construction-hyderabad-sukkur-motorway","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html","title":{"rendered":"Tender for Hyderabad-Sukkur Motorway to be floated next month"},"content":{"rendered":"\n<p>Islamabad:&nbsp; Special Assistant to the Prime Minister (SAPM) on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon, according to news sources. Reportedly, the<a href=\"https:\/\/www.zameen.com\/news\/issues-blocking-sukkur-hyderabad-motorway-resolved.html\" data-type=\"post\" data-id=\"75922\" target=\"_blank\" rel=\"noreferrer noopener\"> Executive Committee of the National Economic Council (ECNEC) <\/a>has previously approved the project\u2019s revised Project Concept-1 (PC) at a cost of PKR 191.471 billion.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/hyderabad-sukkur-motorway-m-6-development.html\" target=\"_blank\" rel=\"noreferrer noopener\">Sukkur-Hyderabad Motorway (M6)\u2019s development to start after ECNEC\u2019s approval<\/a><\/p>\n\n\n\n<p>According to the SAPM, the project will be built on a Build-Operate-Transfer (BOT) basis. In this regard, a tender for the multibillion-dollar project will be floated in October 2021. The work on the project is expected to start next year.&nbsp;<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/sukkur-hyderabad-motorway-development-updates.html\">Work on Sukk<\/a><a href=\"https:\/\/www.zameen.com\/news\/sukkur-hyderabad-motorway-development-updates.html\" target=\"_blank\" rel=\"noreferrer noopener\">u<\/a><a href=\"https:\/\/www.zameen.com\/news\/sukkur-hyderabad-motorway-development-updates.html\">r-Hyderabad Motorway M6 to begin in Q1: Murad Saeed<\/a><\/p>\n\n\n\n<p>Previously, on October 10, 2016, applications for the expression of interest were solicited, and on February 14, 2017, technical bids were opened. The project&#8217;s initial cost was estimated to be PKR 175 billion. However, the project was postponed. The government is now preparing to re-float the tender with a new budget of PKR 191 billion.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad:&nbsp; Special Assistant to the Prime Minister (SAPM) on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon, according to news sources. Reportedly, the Executive Committee of the National Economic Council (ECNEC) has previously approved the project\u2019s revised Project Concept-1 (PC) at a cost of PKR 191.471 billion. Read: Sukkur-Hyderabad Motorway (M6)\u2019s development to start after ECNEC\u2019s approval According to the SAPM, the project will be built on a Build-Operate-Transfer (BOT) basis. In this regard, a tender for the multibillion-dollar project will be floated in October 2021. The work on the project is expected to start next year.&nbsp; Read: Work on Sukkur-Hyderabad Motorway M6 to begin in Q1: Murad Saeed Previously, on October 10, 2016, applications for the expression of interest were solicited, and on February 14, 2017, technical bids were opened. The project&#8217;s initial cost was estimated to be PKR 175 billion. However, the project was postponed. The government is now preparing to re-float the tender with a new budget of PKR 191 billion.&nbsp;<\/p>\n","protected":false},"author":84,"featured_media":60089,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013],"tags":[48130,6153,45185,48131],"persona":[],"class_list":{"0":"post-79614","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-construction-of-hyderabad-sukkur-motorway-to-begin-soon","9":"tag-ecnec","10":"tag-hyderabad-sukkur-motorway-m-6","11":"tag-m6-motorway","12":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Tender for Hyderabad-Sukkur Motorway to be floated next month- Zameen News<\/title>\n<meta name=\"description\" content=\"SAPM on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Tender for Hyderabad-Sukkur Motorway to be floated next month- Zameen News\" \/>\n<meta property=\"og:description\" content=\"SAPM on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-09-15T06:51:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-09-15T09:28:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Sukkur-Hyderabad-Motorway.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1100\" \/>\n\t<meta property=\"og:image:height\" content=\"399\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Tender for Hyderabad-Sukkur Motorway to be floated next month- Zameen News","description":"SAPM on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html","og_locale":"en_US","og_type":"article","og_title":"Tender for Hyderabad-Sukkur Motorway to be floated next month- Zameen News","og_description":"SAPM on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon","og_url":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-09-15T06:51:27+00:00","article_modified_time":"2021-09-15T09:28:32+00:00","og_image":[{"width":1100,"height":399,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Sukkur-Hyderabad-Motorway.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"Tender for Hyderabad-Sukkur Motorway to be floated next month","datePublished":"2021-09-15T06:51:27+00:00","dateModified":"2021-09-15T09:28:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html"},"wordCount":184,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Sukkur-Hyderabad-Motorway.jpg","keywords":["Construction of Hyderabad-Sukkur Motorway to begin soon","ECNEC","Hyderabad-Sukkur Motorway (M-6)","M6 motorway"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html","url":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html","name":"Tender for Hyderabad-Sukkur Motorway to be floated next month- Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Sukkur-Hyderabad-Motorway.jpg","datePublished":"2021-09-15T06:51:27+00:00","dateModified":"2021-09-15T09:28:32+00:00","description":"SAPM on Political Communication Dr Shahbaz Gill stated that construction on the 306-kilometre, 6-lane Hyderabad-Sukkur (M-6) highway will begin soon","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Sukkur-Hyderabad-Motorway.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/Sukkur-Hyderabad-Motorway.jpg","width":1100,"height":399},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/construction-hyderabad-sukkur-motorway.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Tender for Hyderabad-Sukkur Motorway to be floated next month"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/79614","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=79614"}],"version-history":[{"count":3,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/79614\/revisions"}],"predecessor-version":[{"id":79683,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/79614\/revisions\/79683"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/60089"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=79614"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=79614"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=79614"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=79614"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}