{"id":81199,"date":"2021-11-05T17:13:18","date_gmt":"2021-11-05T12:13:18","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=81199"},"modified":"2021-11-05T17:13:23","modified_gmt":"2021-11-05T12:13:23","slug":"kp-timeline-three-hydropower-projects","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html","title":{"rendered":"KP shares timeline for three hydropower projects"},"content":{"rendered":"\n<p>Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of three hydroelectric projects in the province, news sources reported.\u00a0 <\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/kp-govt-complete-672-mini-hydroelectric-power-projects-fy2020-21.html\" target=\"_blank\" rel=\"noreferrer noopener\">KP govt to complete 672 mini hydroelectric power projects in FY2020-21<\/a><\/p>\n\n\n\n<p>As per the details shared, the three projects with a total power generation capacity of 68 Megawatts (MW) are in the final stages of construction in the districts of Mansehra, Shangla, and <a href=\"https:\/\/www.zameen.com\/news\/wapda-directed-hire-gb-residents-diamer-bhasha-dam-project-development-jobs.html\" data-type=\"post\" data-id=\"70387\" target=\"_blank\" rel=\"noreferrer noopener\">Dir Lower in Khyber Pakhtunkhwa<\/a> and will be completed in six months.\u00a0<\/p>\n\n\n\n<p>During his visit to the construction site, the secretary of the power division stated that the three projects will generate low-cost electricity as well as PKR 2 billion annual revenue for the province.\u00a0 During the event, Project Director Koto Hydropower Project Sultan Rome told the visitors that Koto hydropower project with a generation capacity of 40 MW, is 98% complete, with the remaining work expected to be completed soon.\u00a0<\/p>\n\n\n\n<p> <strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/koto-hydropower-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">Koto hydropower project to be finished by December<\/a><\/p>\n\n\n\n<p>He also stated that the construction of the Karora and Jabori hydroelectric projects is nearing completion, with 90% of the work completed. Furthermore, he stated that if not for the coronavirus epidemic, the project would have been completed by now. The work on the<a href=\"https:\/\/www.zameen.com\/news\/work-koto-hydropower-project-resume-this-week.html\" data-type=\"post\" data-id=\"67855\" target=\"_blank\" rel=\"noreferrer noopener\"> project has been delayed significantly due to restrictions<\/a> on the import of machinery and the departure of Chinese engineers from their country.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of three hydroelectric projects in the province, news sources reported.\u00a0 Read: KP govt to complete 672 mini hydroelectric power projects in FY2020-21 As per the details shared, the three projects with a total power generation capacity of 68 Megawatts (MW) are in the final stages of construction in the districts of Mansehra, Shangla, and Dir Lower in Khyber Pakhtunkhwa and will be completed in six months.\u00a0 During his visit to the construction site, the secretary of the power division stated that the three projects will generate low-cost electricity as well as PKR 2 billion annual revenue for the province.\u00a0 During the event, Project Director Koto Hydropower Project Sultan Rome told the visitors that Koto hydropower project with a generation capacity of 40 MW, is 98% complete, with the remaining work expected to be completed soon.\u00a0 Read: Koto hydropower project to be finished by December He also stated that the construction of the Karora and Jabori hydroelectric projects is nearing completion, with 90% of the work completed. Furthermore, he stated that if not for the coronavirus epidemic, the project would have&hellip;<\/p>\n","protected":false},"author":84,"featured_media":63632,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013],"tags":[49350,49349],"persona":[],"class_list":{"0":"post-81199","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-kp-hydroelctric-projects","9":"tag-kp-shares-timeline-for-three-hydropower-projects","10":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>KP shares timeline for three hydropower projects - Zameen News<\/title>\n<meta name=\"description\" content=\"Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KP shares timeline for three hydropower projects - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-05T12:13:18+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-05T12:13:23+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KP shares timeline for three hydropower projects - Zameen News","description":"Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html","og_locale":"en_US","og_type":"article","og_title":"KP shares timeline for three hydropower projects - Zameen News","og_description":"Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of","og_url":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-11-05T12:13:18+00:00","article_modified_time":"2021-11-05T12:13:23+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"KP shares timeline for three hydropower projects","datePublished":"2021-11-05T12:13:18+00:00","dateModified":"2021-11-05T12:13:23+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html"},"wordCount":231,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","keywords":["KP hydroelctric projects","KP shares timeline for three hydropower projects"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html","url":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html","name":"KP shares timeline for three hydropower projects - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","datePublished":"2021-11-05T12:13:18+00:00","dateModified":"2021-11-05T12:13:23+00:00","description":"Peshawar: Secretary Energy and Power Department Engineer Syed Imtiaz Hussain Shah on Thursday (November 04) announced the tentative completion timeline of","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/04\/dam.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/kp-timeline-three-hydropower-projects.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"KP shares timeline for three hydropower projects"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/81199","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=81199"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/81199\/revisions"}],"predecessor-version":[{"id":81201,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/81199\/revisions\/81201"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/63632"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=81199"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=81199"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=81199"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=81199"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}