{"id":81710,"date":"2021-11-24T17:48:04","date_gmt":"2021-11-24T12:48:04","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=81710"},"modified":"2021-11-24T17:48:09","modified_gmt":"2021-11-24T12:48:09","slug":"timeline-shared-hydel-power-projects","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html","title":{"rendered":"Timeline shared for KP\u2019s hydel power projects"},"content":{"rendered":"\n<p>Peshawar: The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity of 62.8 megawatts (MW), in Khyber Pakhtunkhwa (KP) will be completed by June 2022, according to news published on Wednesday (November 24).\u00a0<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/land-acquisition-balakot-hydropower.html\" target=\"_blank\" rel=\"noreferrer noopener\">Land acquisition process begins for Balakot Hydropower project<\/a><\/p>\n\n\n\n<p>The Pakhtunkhwa Energy Development Organisation briefed KP Chief Minister (CM) Mahmood Khan on the progress of hydel power projects. As per the details, the projects include <a rel=\"noreferrer noopener\" href=\"https:\/\/www.zameen.com\/news\/koto-hydropower-project.html\" target=\"_blank\">40.8 MW Koto Hydropower<\/a>, 11.2 MW Karora, and 10.2 MW Jabori hydel power projects. Once completed, the projects are expected to generate annual revenue of PKR 2.73 billion.\u00a0<\/p>\n\n\n\n<p>Moreover, CM Khan ordered the commissioners and deputy commissioners concerned to resolve all matters related to the land acquisition of Kalam and Balakot hydropower projects in a month.\u00a0 <\/p>\n\n\n\n<p>Reportedly, the attendees were also informed about the progress of four other important hydropower projects, which includes 6.5 megawatts Barando, 10 megawatts Chapri, 69 megawatts Lavi, and 84 megawatts Mataltan hydropower projects.\u00a0<\/p>\n\n\n\n<p>Moreover, the meeting also briefed the attendees about the progress of foreign-funded hydropower projects. Currently, work on three projects was underway, which includes 88 megawatts Gabral Kalam, 157 megawatts Madain, and 300 megawatts Balakot hydropower projects.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/hydel-based-sources-energy-production.html\" target=\"_blank\" rel=\"noreferrer noopener\">Govt to move from fossil fuels to hydel-based sources for energy production<\/a><\/p>\n\n\n\n<p>Besides this, solarisation projects were also discussed in the meeting. The attendees were informed that work on seven projects was in progress. According to details, work on 13 solar mini-grid stations in tribal districts and 2,956 mosques have been solarised. It was also reported that 6,983 schools and 143 basic health units were solarised.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Peshawar: The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity of 62.8 megawatts (MW), in Khyber Pakhtunkhwa (KP) will be completed by June 2022, according to news published on Wednesday (November 24).\u00a0 Read: Land acquisition process begins for Balakot Hydropower project The Pakhtunkhwa Energy Development Organisation briefed KP Chief Minister (CM) Mahmood Khan on the progress of hydel power projects. As per the details, the projects include 40.8 MW Koto Hydropower, 11.2 MW Karora, and 10.2 MW Jabori hydel power projects. Once completed, the projects are expected to generate annual revenue of PKR 2.73 billion.\u00a0 Moreover, CM Khan ordered the commissioners and deputy commissioners concerned to resolve all matters related to the land acquisition of Kalam and Balakot hydropower projects in a month.\u00a0 Reportedly, the attendees were also informed about the progress of four other important hydropower projects, which includes 6.5 megawatts Barando, 10 megawatts Chapri, 69 megawatts Lavi, and 84 megawatts Mataltan hydropower projects.\u00a0 Moreover, the meeting also briefed the attendees about the progress of foreign-funded hydropower projects. Currently, work on three projects was underway, which includes 88 megawatts Gabral Kalam, 157 megawatts Madain, and 300 megawatts Balakot hydropower&hellip;<\/p>\n","protected":false},"author":83,"featured_media":67875,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15017],"tags":[48361,46037,37928,49723],"persona":[],"class_list":{"0":"post-81710","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-notices-announcements","8":"tag-balakot-hydropower-project","9":"tag-koto-hydropower-project","10":"tag-pakhtunkhwa-energy-development-organisation","11":"tag-timeline-shared-for-kps-hydel-power-projects","12":"cat-15017-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Timeline shared for KP\u2019s hydel power projects - Zameen News<\/title>\n<meta name=\"description\" content=\"The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity.....\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Timeline shared for KP\u2019s hydel power projects - Zameen News\" \/>\n<meta property=\"og:description\" content=\"The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity.....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2021-11-24T12:48:04+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2021-11-24T12:48:09+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Iqra Masood\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Iqra Masood\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Timeline shared for KP\u2019s hydel power projects - Zameen News","description":"The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity.....","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html","og_locale":"en_US","og_type":"article","og_title":"Timeline shared for KP\u2019s hydel power projects - Zameen News","og_description":"The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity.....","og_url":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2021-11-24T12:48:04+00:00","article_modified_time":"2021-11-24T12:48:09+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","type":"image\/jpeg"}],"author":"Iqra Masood","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Iqra Masood","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html"},"author":{"name":"Iqra Masood","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/377abfe4dc60870161cf052d458a2925"},"headline":"Timeline shared for KP\u2019s hydel power projects","datePublished":"2021-11-24T12:48:04+00:00","dateModified":"2021-11-24T12:48:09+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html"},"wordCount":259,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","keywords":["Balakot Hydropower project","Koto Hydropower Project","Pakhtunkhwa Energy Development Organisation","Timeline shared for KP\u2019s hydel power projects"],"articleSection":["Notices &amp; Announcements"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html","url":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html","name":"Timeline shared for KP\u2019s hydel power projects - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","datePublished":"2021-11-24T12:48:04+00:00","dateModified":"2021-11-24T12:48:09+00:00","description":"The Pakhtunkhwa Energy Development Organisation has disclosed that the three hydel power projects, with a total power generation capacity.....","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/07\/hydropower.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/timeline-shared-hydel-power-projects.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Timeline shared for KP\u2019s hydel power projects"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/377abfe4dc60870161cf052d458a2925","name":"Iqra Masood","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","caption":"Iqra Masood"},"description":"Iqra holds BS in International Relations and is passionate about writing engaging content on trending real estate topics. When not working, she is either spending time with family, shopping, or discussing shows &amp; movies.","sameAs":["http:\/\/zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/iqramasood"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/81710","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/83"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=81710"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/81710\/revisions"}],"predecessor-version":[{"id":81711,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/81710\/revisions\/81711"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/67875"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=81710"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=81710"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=81710"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=81710"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}