{"id":83498,"date":"2022-01-31T12:38:59","date_gmt":"2022-01-31T07:38:59","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=83498"},"modified":"2022-01-31T12:39:03","modified_gmt":"2022-01-31T07:39:03","slug":"dasu-raikot-section-completed-in-q1","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html","title":{"rendered":"Karakoram Highway&#8217;s Dasu-Raikot section to be completed in Q1"},"content":{"rendered":"\n<p>Islamabad: The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media reports published on Monday (January 31). The 50-kilometre long section of Karakoram Highway, from Chilas to Raikot has already been open to traffic.\u00a0<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/havelian-thakot-best-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">Karakoram Highway\u2019s Havelian-Thakot section wins ENR\u2019s Global Best Project award<\/a><\/p>\n\n\n\n<p>According to the National Highway Authority (NHA) Member North Zone Mukesh Kumar, the rehabilitation work on the road is progressing at a fast pace and is expected to be completed within the stipulated time in March 2022.&nbsp;<\/p>\n\n\n\n<p>After the completion of the said project, the section from Thakot to Khunjerab will be made functional. Kumar stated that the NHA will award rehabilitation for the last 8-kilometre long section of the highway soon.&nbsp;<\/p>\n\n\n\n<p>Moreover, the total cost of the said project is PKR 2.4 billion, which is provided by Water and Power Development Authority (WAPDA) and was being executed by NHA. The existing road has been rehabilitated by replacing the sub base and base while the concrete shoulders have been added to the road.\u00a0<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/karakoram-highway-worlds-15-beautiful-roads.html\" target=\"_blank\" rel=\"noreferrer noopener\">Karakoram Highway makes to list of world\u2019s 15 beautiful most beautiful roads<\/a><\/p>\n\n\n\n<p>It is important to note that the Karakoram Highway (N-35) is one of the highest paved international roads in the world. The highway starts from Hassan Abdal and culminates at Khunjerab. With the completion of the said project, the tourists will reach Gilgit-Baltistan (GB) directly using Karakoram Highway from Mansehra.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media reports published on Monday (January 31). The 50-kilometre long section of Karakoram Highway, from Chilas to Raikot has already been open to traffic.\u00a0 Read: Karakoram Highway\u2019s Havelian-Thakot section wins ENR\u2019s Global Best Project award According to the National Highway Authority (NHA) Member North Zone Mukesh Kumar, the rehabilitation work on the road is progressing at a fast pace and is expected to be completed within the stipulated time in March 2022.&nbsp; After the completion of the said project, the section from Thakot to Khunjerab will be made functional. Kumar stated that the NHA will award rehabilitation for the last 8-kilometre long section of the highway soon.&nbsp; Moreover, the total cost of the said project is PKR 2.4 billion, which is provided by Water and Power Development Authority (WAPDA) and was being executed by NHA. The existing road has been rehabilitated by replacing the sub base and base while the concrete shoulders have been added to the road.\u00a0 Read: Karakoram Highway makes to list of world\u2019s 15 beautiful most beautiful roads It is important to note that the Karakoram&hellip;<\/p>\n","protected":false},"author":83,"featured_media":80221,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15016],"tags":[1962,50881,50884],"persona":[],"class_list":{"0":"post-83498","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-new-developments","8":"tag-karakoram-highway","9":"tag-karakoram-highways-dasu-raikot-section-to-be-completed-in-q1","10":"tag-work-on-dasu-raikot-section","11":"cat-15016-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>KKH&#039;s Dasu-Raikot section to be completed in Q1- Zameen News<\/title>\n<meta name=\"description\" content=\"The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media.....\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"KKH&#039;s Dasu-Raikot section to be completed in Q1- Zameen News\" \/>\n<meta property=\"og:description\" content=\"The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media.....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2022-01-31T07:38:59+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-01-31T07:39:03+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/10\/Karakoram-Highway-News-Cover.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Iqra Masood\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Iqra Masood\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"KKH's Dasu-Raikot section to be completed in Q1- Zameen News","description":"The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media.....","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html","og_locale":"en_US","og_type":"article","og_title":"KKH's Dasu-Raikot section to be completed in Q1- Zameen News","og_description":"The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media.....","og_url":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2022-01-31T07:38:59+00:00","article_modified_time":"2022-01-31T07:39:03+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/10\/Karakoram-Highway-News-Cover.jpg","type":"image\/jpeg"}],"author":"Iqra Masood","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Iqra Masood","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html"},"author":{"name":"Iqra Masood","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/377abfe4dc60870161cf052d458a2925"},"headline":"Karakoram Highway&#8217;s Dasu-Raikot section to be completed in Q1","datePublished":"2022-01-31T07:38:59+00:00","dateModified":"2022-01-31T07:39:03+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html"},"wordCount":254,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/10\/Karakoram-Highway-News-Cover.jpg","keywords":["Karakoram Highway","Karakoram Highway&#039;s Dasu-Raikot section to be completed in Q1","work on Dasu-Raikot section"],"articleSection":["New Developments"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html","url":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html","name":"KKH's Dasu-Raikot section to be completed in Q1- Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/10\/Karakoram-Highway-News-Cover.jpg","datePublished":"2022-01-31T07:38:59+00:00","dateModified":"2022-01-31T07:39:03+00:00","description":"The rehabilitation of Karakoram Highway\u2019s Dasu-Raikot section will be completed in the first quarter of the existing year, according to media.....","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/10\/Karakoram-Highway-News-Cover.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/10\/Karakoram-Highway-News-Cover.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/dasu-raikot-section-completed-in-q1.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Karakoram Highway&#8217;s Dasu-Raikot section to be completed in Q1"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/377abfe4dc60870161cf052d458a2925","name":"Iqra Masood","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","caption":"Iqra Masood"},"description":"Iqra holds BS in International Relations and is passionate about writing engaging content on trending real estate topics. When not working, she is either spending time with family, shopping, or discussing shows &amp; movies.","sameAs":["http:\/\/zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/iqramasood"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/83498","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/83"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=83498"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/83498\/revisions"}],"predecessor-version":[{"id":83502,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/83498\/revisions\/83502"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/80221"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=83498"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=83498"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=83498"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=83498"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}