{"id":87797,"date":"2022-08-04T12:09:39","date_gmt":"2022-08-04T07:09:39","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=87797"},"modified":"2022-08-10T10:21:55","modified_gmt":"2022-08-10T05:21:55","slug":"expansion-gwadar-port-breakwater-project","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html","title":{"rendered":"Expansion of Gwadar Port: Govt to construct breakwater at Jebel-e-Nuh"},"content":{"rendered":"\n<p class=\"wp-block-paragraph\">Gwadar: The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh, according to a news story published in the national dailies on August 2.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/gpa-land-acquisition-gwadar-port.html\" target=\"_blank\" rel=\"noreferrer noopener\">GPA asked to expedite work on land acquisition process for Gwadar Port<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">As per the details, the installation of a breakwater is necessary for the expansion of the port as it will provide tranquil berthing conditions for eastern-most berths to be developed in the port. It was disclosed that the implementation period for the breakwater project is 10 years, which is expected to be completed by 2032.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Moreover, the construction of a breakwater at Jebel-e-Nuh (the tip of Gwadar Headland) was proposed by the experts. The expansion plans have been prepared according to the comprehensive feasibility study by CCCC Consultants. It was stated that no breakwater of this dimension has been established in the area. According to the details, the breakwater of 1,772m in length in the north-eastern direction must be constructed.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\">Additionally, the breakwater project will provide marine protection against the monsoonal swells and waves and meet limiting wave conditions which are considered safe for berthing, cargo operation, and other functions. It was disclosed that the expansion of Gwadar Port requires the future construction of berths in order to cater to new generation ships. The breakwater project is designed for the protection of the area within the Master Plan (2007). It will enable a safe working environment at navigation, port, cargo handling, dredging, mooring, berthing and unberthing, and hydrographic surveys.&nbsp;<\/p>\n\n\n\n<p class=\"wp-block-paragraph\"><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/socio-economic-development-balochistan.html\" target=\"_blank\" rel=\"noreferrer noopener\">\u2018Balochistan\u2019s socio-economic development linked with Gwadar Port\u2019<\/a><\/p>\n\n\n\n<p class=\"wp-block-paragraph\">It is pertinent to note that the government has signed a concession agreement with China Overseas Port Holding Company (COPHC) through Gwadar Port Authority (GPA) for the development and operation of Gwadar Port. The GPA is focusing on Master Plan for the development of the port and associated<a href=\"https:\/\/www.zameen.com\/news\/gwadar-free-zone-development.html\" target=\"_blank\" rel=\"noreferrer noopener\"> free zones<\/a>.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Gwadar: The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh, according to a news story published in the national dailies on August 2.&nbsp; Read: GPA asked to expedite work on land acquisition process for Gwadar Port As per the details, the installation of a breakwater is necessary for the expansion of the port as it will provide tranquil berthing conditions for eastern-most berths to be developed in the port. It was disclosed that the implementation period for the breakwater project is 10 years, which is expected to be completed by 2032.&nbsp; Moreover, the construction of a breakwater at Jebel-e-Nuh (the tip of Gwadar Headland) was proposed by the experts. The expansion plans have been prepared according to the comprehensive feasibility study by CCCC Consultants. It was stated that no breakwater of this dimension has been established in the area. According to the details, the breakwater of 1,772m in length in the north-eastern direction must be constructed.&nbsp; Additionally, the breakwater project will provide marine protection against the monsoonal swells and waves and meet limiting wave conditions which are considered safe for berthing, cargo operation, and other functions. It was disclosed that the&hellip;<\/p>\n","protected":false},"author":83,"featured_media":60439,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385],"tags":[53449,53444,53448],"persona":[],"class_list":["post-87797","post","type-post","status-publish","format-standard","has-post-thumbnail","category-development-projects","tag-breakwater-project-at-gwadar-port","tag-expansion-of-gwadar-port-govt-to-construct-breakwater-at-jebel-e-nuh","tag-gwadar-port-expansion","cat-20385-id"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.7 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Expansion of Gwadar Port: Govt to construct breakwater- Zameen News<\/title>\n<meta name=\"description\" content=\"The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh.....\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Expansion of Gwadar Port: Govt to construct breakwater- Zameen News\" \/>\n<meta property=\"og:description\" content=\"The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh.....\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2022-08-04T07:09:39+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-08-10T05:21:55+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/gwadarport.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Iqra Masood\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Iqra Masood\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Expansion of Gwadar Port: Govt to construct breakwater- Zameen News","description":"The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh.....","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html","og_locale":"en_US","og_type":"article","og_title":"Expansion of Gwadar Port: Govt to construct breakwater- Zameen News","og_description":"The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh.....","og_url":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2022-08-04T07:09:39+00:00","article_modified_time":"2022-08-10T05:21:55+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/gwadarport.jpg","type":"image\/jpeg"}],"author":"Iqra Masood","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Iqra Masood","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html"},"author":{"name":"Iqra Masood","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/40d42b416ec26a33ccf0464a3bb46a22"},"headline":"Expansion of Gwadar Port: Govt to construct breakwater at Jebel-e-Nuh","datePublished":"2022-08-04T07:09:39+00:00","dateModified":"2022-08-10T05:21:55+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html"},"wordCount":323,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/gwadarport.jpg","keywords":["breakwater project at Gwadar Port","Expansion of Gwadar Port: Govt to construct breakwater at Jebel-e-Nuh","Gwadar Port expansion"],"articleSection":["Infrastructure"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html","url":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html","name":"Expansion of Gwadar Port: Govt to construct breakwater- Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/gwadarport.jpg","datePublished":"2022-08-04T07:09:39+00:00","dateModified":"2022-08-10T05:21:55+00:00","description":"The government has decided to expand Gwadar Port by constructing a breakwater, worth PKR 42.19 billion, at Jebel-e-Nuh.....","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/gwadarport.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/01\/gwadarport.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/expansion-gwadar-port-breakwater-project.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Expansion of Gwadar Port: Govt to construct breakwater at Jebel-e-Nuh"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/40d42b416ec26a33ccf0464a3bb46a22","name":"Iqra Masood","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","caption":"Iqra Masood"},"description":"Iqra holds BS in International Relations and is passionate about writing engaging content on trending real estate topics. When not working, she is either spending time with family, shopping, or discussing shows &amp; movies.","sameAs":["http:\/\/zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/iqramasood"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/87797","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/83"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=87797"}],"version-history":[{"count":2,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/87797\/revisions"}],"predecessor-version":[{"id":87859,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/87797\/revisions\/87859"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/60439"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=87797"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=87797"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=87797"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=87797"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}