{"id":89090,"date":"2022-10-03T12:11:27","date_gmt":"2022-10-03T07:11:27","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=89090"},"modified":"2022-10-03T12:11:32","modified_gmt":"2022-10-03T07:11:32","slug":"lda-design-options-babu-sabu-band-road","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html","title":{"rendered":"LDA floats three design options for Babu Sabu-Band Road rehabilitation"},"content":{"rendered":"\n<p>Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources reported on October 3.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/tepa-roads-rehabilitation-plan-lahore.html\" data-type=\"post\" data-id=\"83319\" target=\"_blank\" rel=\"noreferrer noopener\">TEPA puts forth rehabilitation, realignment plan for several roads in Lahore<\/a><\/p>\n\n\n\n<p>The development authority suggested the idea under the \u2018Rehabilitation of Band Road from Babu Sabu Interchange to Ring Road along with Improvement at Gulshan-i-Ravi T-Junction\u2019 project. Under the project, the authority will develop a multi-lane carriageway and flyovers to connect the city&#8217;s two busiest entry and exit points.\u00a0<\/p>\n\n\n\n<p><strong>Design 1:&nbsp;&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>There will six-lane dual carriageway from <a href=\"https:\/\/www.zameen.com\/news\/lda-burki-road-babu-sabu-interchange-road.html\" data-type=\"post\" data-id=\"81416\" target=\"_blank\" rel=\"noreferrer noopener\">Babu Sabu Interchange<\/a> to Ring Road<\/li><li>There will be a three-lane underpass having 5.1-meter height clearance for the traffic (bound for Babu Sabu Interchange)\u00a0<\/li><li>PKR 4.959 billion will be spent on the acquisition of the 10.5-kanal land area required for the project<\/li><\/ul>\n\n\n\n<p><strong>Design 2:&nbsp;<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>A six-lane dual carriageway from Babu Sabu Interchange to Ring Road with the provision of two protected U-turns<\/li><li>The project would cost PKR 4.104 billion, including over PKR 2.079 billion for construction and the rest for acquiring the land measuring 40 kanals.\u00a0<\/li><li>The project will be a signal-free corridor on Band Road connecting Babu Sabu Interchange with protected U-turns \u00a0<\/li><\/ul>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/lda-build-3-megaprojects-provincial-capital.html\" data-type=\"post\" data-id=\"80545\" target=\"_blank\" rel=\"noreferrer noopener\">LDA proposes Shahdra Turbo Roundabout, other projects<\/a><\/p>\n\n\n\n<p><strong>Design 3:<\/strong><\/p>\n\n\n\n<ul class=\"wp-block-list\"><li>A six-lane dual carriageway from Babu Sabu to Band Road with flyovers\u00a0<\/li><li>There will be a three-lane flyover for the Babu Sabu Interchange-bound traffic<\/li><\/ul>\n\n\n\n<p>In this regard, the LDA Executive Board will take the final decision on the project in the upcoming meeting. This will also involve inputs from the Planning and Development (P&amp;D) Board.&nbsp;<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/pc-1-of-samanabad-underpass-nod.html\" data-type=\"post\" data-id=\"89066\" target=\"_blank\" rel=\"noreferrer noopener\">Revised PC-1 of Samanabad Underpass gets administrative nod<\/a><\/p>\n\n\n\n<p>As per the LDA, steps have been taken to reduce traffic jams and promote low carbon emissions with signal-free and smooth traffic flow.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources reported on October 3. Read: TEPA puts forth rehabilitation, realignment plan for several roads in Lahore The development authority suggested the idea under the \u2018Rehabilitation of Band Road from Babu Sabu Interchange to Ring Road along with Improvement at Gulshan-i-Ravi T-Junction\u2019 project. Under the project, the authority will develop a multi-lane carriageway and flyovers to connect the city&#8217;s two busiest entry and exit points.\u00a0 Design 1:&nbsp;&nbsp; There will six-lane dual carriageway from Babu Sabu Interchange to Ring Road There will be a three-lane underpass having 5.1-meter height clearance for the traffic (bound for Babu Sabu Interchange)\u00a0 PKR 4.959 billion will be spent on the acquisition of the 10.5-kanal land area required for the project Design 2:&nbsp; A six-lane dual carriageway from Babu Sabu Interchange to Ring Road with the provision of two protected U-turns The project would cost PKR 4.104 billion, including over PKR 2.079 billion for construction and the rest for acquiring the land measuring 40 kanals.\u00a0 The project will be a signal-free corridor on Band Road connecting Babu Sabu Interchange with protected U-turns \u00a0 Read:&hellip;<\/p>\n","protected":false},"author":84,"featured_media":74143,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013],"tags":[47697,54331,54330],"persona":[],"class_list":{"0":"post-89090","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-babu-sabu-interchange","9":"tag-bund-road","10":"tag-lda-floats-three-design-options-for-babu-sabu-band-road-rehabilitation","11":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>LDA proposes design for Babu Sabu-Band Road rehabilitation- Zameen News<\/title>\n<meta name=\"description\" content=\"Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"LDA proposes design for Babu Sabu-Band Road rehabilitation- Zameen News\" \/>\n<meta property=\"og:description\" content=\"Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2022-10-03T07:11:27+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-10-03T07:11:32+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/02\/GT-Road.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"LDA proposes design for Babu Sabu-Band Road rehabilitation- Zameen News","description":"Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html","og_locale":"en_US","og_type":"article","og_title":"LDA proposes design for Babu Sabu-Band Road rehabilitation- Zameen News","og_description":"Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources","og_url":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2022-10-03T07:11:27+00:00","article_modified_time":"2022-10-03T07:11:32+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/02\/GT-Road.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"LDA floats three design options for Babu Sabu-Band Road rehabilitation","datePublished":"2022-10-03T07:11:27+00:00","dateModified":"2022-10-03T07:11:32+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html"},"wordCount":304,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/02\/GT-Road.jpg","keywords":["Babu sabu interchange","Bund Road","LDA floats three design options for Babu Sabu-Band Road rehabilitation"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html","url":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html","name":"LDA proposes design for Babu Sabu-Band Road rehabilitation- Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/02\/GT-Road.jpg","datePublished":"2022-10-03T07:11:27+00:00","dateModified":"2022-10-03T07:11:32+00:00","description":"Lahore: The Lahore Development Authority (LDA) has floated three design ideas for the rehabilitation of Babu Sabu Interchange to Band Road, news sources","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/02\/GT-Road.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/02\/GT-Road.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/lda-design-options-babu-sabu-band-road.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"LDA floats three design options for Babu Sabu-Band Road rehabilitation"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/89090","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=89090"}],"version-history":[{"count":2,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/89090\/revisions"}],"predecessor-version":[{"id":89092,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/89090\/revisions\/89092"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/74143"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=89090"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=89090"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=89090"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=89090"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}