{"id":91309,"date":"2023-01-09T16:40:36","date_gmt":"2023-01-09T11:40:36","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=91309"},"modified":"2023-01-09T16:40:37","modified_gmt":"2023-01-09T11:40:37","slug":"construction-update-bhara-kahu","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html","title":{"rendered":"Construction update shared on Bhara Kahu Bypass project"},"content":{"rendered":"\n<p>Islamabad: Development work on 12 spots at the Bhara Kahu bypass project is underway simultaneously, according to news published on January 9. As per the details, work is being carried out on at least three underpasses, one interchange, a flyover, and a bridge; which is expected to be completed within the next two months.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/bhara-kahu-bypass-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">CDA shares development progress of Bhara Kahu bypass project<\/a><\/p>\n\n\n\n<p>The news source quoted the official data citing that the aggregate base at the loop and ramp of the <a href=\"https:\/\/www.zameen.com\/news\/pak-epa-nod-bhara-kahu-bypass-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">Bhara Kahu Bypass<\/a> has been completed. The civic agency has started work on the interchange girder, construction of the Shahdara bridge, box culvert and two girder yards. Moreover, construction of three underpasses is underway along with development work on an elevated road.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/ihc-cda-construction-bhara-kahu-bypass.html\" target=\"_blank\" rel=\"noreferrer noopener\">IHC allows CDA to resume construction of Bhara Kahu Bypass Project\u00a0<\/a><\/p>\n\n\n\n<p>According to the details shared, 27 piles out of 32 have been poured at the interchange and seven piles have been installed at the Nullah Bridge. It was mentioned that earthwork is in progress while the casting of girders has been started and work related to the casting of piles for the elevated portion is underway at a good pace.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Islamabad: Development work on 12 spots at the Bhara Kahu bypass project is underway simultaneously, according to news published on January 9. As per the details, work is being carried out on at least three underpasses, one interchange, a flyover, and a bridge; which is expected to be completed within the next two months. Read: CDA shares development progress of Bhara Kahu bypass project The news source quoted the official data citing that the aggregate base at the loop and ramp of the Bhara Kahu Bypass has been completed. The civic agency has started work on the interchange girder, construction of the Shahdara bridge, box culvert and two girder yards. Moreover, construction of three underpasses is underway along with development work on an elevated road. Read: IHC allows CDA to resume construction of Bhara Kahu Bypass Project\u00a0 According to the details shared, 27 piles out of 32 have been poured at the interchange and seven piles have been installed at the Nullah Bridge. It was mentioned that earthwork is in progress while the casting of girders has been started and work related to the casting of piles for the elevated portion is underway at a good pace.&nbsp;<\/p>\n","protected":false},"author":83,"featured_media":75796,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15020],"tags":[53026,55824],"persona":[],"class_list":{"0":"post-91309","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-social-developments","8":"tag-bhara-kahu-bypass-project","9":"tag-construction-update-shared-on-bhara-kahu-bypass-project","10":"cat-15020-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Construction update on Bhara Kahu Bypass project- Zameen News<\/title>\n<meta name=\"description\" content=\"Construction update shared on Bhara Kahu bypass project, which is expected to be completed within next two months. Click here to read details.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Construction update on Bhara Kahu Bypass project- Zameen News\" \/>\n<meta property=\"og:description\" content=\"Construction update shared on Bhara Kahu bypass project, which is expected to be completed within next two months. Click here to read details.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-09T11:40:36+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-09T11:40:37+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/04\/underpass.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Iqra Masood\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Iqra Masood\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Construction update on Bhara Kahu Bypass project- Zameen News","description":"Construction update shared on Bhara Kahu bypass project, which is expected to be completed within next two months. Click here to read details.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html","og_locale":"en_US","og_type":"article","og_title":"Construction update on Bhara Kahu Bypass project- Zameen News","og_description":"Construction update shared on Bhara Kahu bypass project, which is expected to be completed within next two months. Click here to read details.","og_url":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2023-01-09T11:40:36+00:00","article_modified_time":"2023-01-09T11:40:37+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/04\/underpass.jpg","type":"image\/jpeg"}],"author":"Iqra Masood","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Iqra Masood","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html"},"author":{"name":"Iqra Masood","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/377abfe4dc60870161cf052d458a2925"},"headline":"Construction update shared on Bhara Kahu Bypass project","datePublished":"2023-01-09T11:40:36+00:00","dateModified":"2023-01-09T11:40:37+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html"},"wordCount":202,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/04\/underpass.jpg","keywords":["Bhara Kahu Bypass project","Construction update shared on Bhara Kahu Bypass project"],"articleSection":["Social Developments"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html","url":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html","name":"Construction update on Bhara Kahu Bypass project- Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/04\/underpass.jpg","datePublished":"2023-01-09T11:40:36+00:00","dateModified":"2023-01-09T11:40:37+00:00","description":"Construction update shared on Bhara Kahu bypass project, which is expected to be completed within next two months. Click here to read details.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/04\/underpass.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/04\/underpass.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/construction-update-bhara-kahu.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Construction update shared on Bhara Kahu Bypass project"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/377abfe4dc60870161cf052d458a2925","name":"Iqra Masood","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/istockphoto-917649844-170667a-96x96.jpg","caption":"Iqra Masood"},"description":"Iqra holds BS in International Relations and is passionate about writing engaging content on trending real estate topics. When not working, she is either spending time with family, shopping, or discussing shows &amp; movies.","sameAs":["http:\/\/zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/iqramasood"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91309","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/83"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=91309"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91309\/revisions"}],"predecessor-version":[{"id":91313,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91309\/revisions\/91313"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/75796"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=91309"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=91309"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=91309"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=91309"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}