{"id":91492,"date":"2023-01-16T15:40:37","date_gmt":"2023-01-16T10:40:37","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=91492"},"modified":"2023-01-16T17:32:45","modified_gmt":"2023-01-16T12:32:45","slug":"two-mega-projects-lahore","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html","title":{"rendered":"Foundation stones laid for two mega projects in Lahore"},"content":{"rendered":"\n<p>Lahore: Punjab Chief Minister (CM) Chaudhry Parvez Elahi has laid the foundation stones of two mega projects focused on solving traffic congestion in the city of Lahore, an advertisement in leading newspapers read.&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Read:<\/strong>&nbsp;<a href=\"https:\/\/www.zameen.com\/news\/lda-model-road-plan.html\" target=\"_blank\" rel=\"noreferrer noopener\">LDA\u2019s plan in place to remove encroachments on several roads, improve traffic flow<\/a><\/p>\n\n\n\n<p>The projects include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel Flyover project. As per the news report, the <a href=\"https:\/\/www.zameen.com\/news\/deadline-completion-saggian-road-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">Saggian Road rehabilitation project <\/a>would cost PKR 4.51 billion and would save annual fuel costs of PKR 500 million. Similarly, the Shahdra Multilevel Flyover would cost PKR 8.9 billion and be completed in 10 months.&nbsp;&nbsp;<\/p>\n\n\n\n<figure class=\"wp-block-image size-full\"><img loading=\"lazy\" decoding=\"async\" width=\"701\" height=\"570\" src=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/01\/Lahore-Mega-projects.jpg\" alt=\"\" class=\"wp-image-91494\" srcset=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/01\/Lahore-Mega-projects.jpg 701w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/01\/Lahore-Mega-projects-300x244.jpg 300w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/01\/Lahore-Mega-projects-492x400.jpg 492w, https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/01\/Lahore-Mega-projects-283x230.jpg 283w\" sizes=\"auto, (max-width: 701px) 100vw, 701px\" \/><figcaption class=\"wp-element-caption\">Image Source: Dawn E-paper<\/figcaption><\/figure>\n\n\n\n<p>As per the government sources, the Saggian Road project comprises two packages; one from Ravi Bridge to Lahore-Sheikhupura Road and the other from Phool Mandi Chowk to Faizpur Interchange (M-2 Motorway). The project\u2019s Package-1 features a 3.90-kilometre-long and 15-feet-wide three-lane dual carriageway. While Package 2 will be a 4.40-kilometre-long and 110-feet-wide two-lane dual carriageway. The estimated cost of the packages is PKR 1.5457 billion and PKR 1.5273 billion, respectively.&nbsp;&nbsp;&nbsp;&nbsp;<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/foundation-stones-underpasses-lhr.html\" target=\"_blank\" rel=\"noreferrer noopener\">Foundation stones laid for two underpasses in LHR- Zameen News<\/a><\/p>\n\n\n\n<p>Both projects are part of CM Elahi&#8217;s PKR 20 billion mega projects package for the city, which also includes the Samanabad Underpass, the Samanabad Cricket Ground, and the Gulshan-e-Ravi T Junction Underpass project.&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: Punjab Chief Minister (CM) Chaudhry Parvez Elahi has laid the foundation stones of two mega projects focused on solving traffic congestion in the city of Lahore, an advertisement in leading newspapers read.&nbsp;&nbsp; Read:&nbsp;LDA\u2019s plan in place to remove encroachments on several roads, improve traffic flow The projects include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel Flyover project. As per the news report, the Saggian Road rehabilitation project would cost PKR 4.51 billion and would save annual fuel costs of PKR 500 million. Similarly, the Shahdra Multilevel Flyover would cost PKR 8.9 billion and be completed in 10 months.&nbsp;&nbsp; As per the government sources, the Saggian Road project comprises two packages; one from Ravi Bridge to Lahore-Sheikhupura Road and the other from Phool Mandi Chowk to Faizpur Interchange (M-2 Motorway). The project\u2019s Package-1 features a 3.90-kilometre-long and 15-feet-wide three-lane dual carriageway. While Package 2 will be a 4.40-kilometre-long and 110-feet-wide two-lane dual carriageway. The estimated cost of the packages is PKR 1.5457 billion and PKR 1.5273 billion, respectively.&nbsp;&nbsp;&nbsp;&nbsp; Read: Foundation stones laid for two underpasses in LHR- Zameen News Both projects are part of CM Elahi&#8217;s PKR 20 billion mega projects package for&hellip;<\/p>\n","protected":false},"author":84,"featured_media":61229,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013],"tags":[55936,55935,50460,55937],"persona":[],"class_list":{"0":"post-91492","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-lahore-mega-prohects","9":"tag-mega-projects-lahore","10":"tag-sagian-road-project","11":"tag-shahdra-multi-level-project","12":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Foundation laid for two mega projects in Lahore\u00a0 - Zameen News<\/title>\n<meta name=\"description\" content=\"The two mega projects in Lahore include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel...\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Foundation laid for two mega projects in Lahore\u00a0 - Zameen News\" \/>\n<meta property=\"og:description\" content=\"The two mega projects in Lahore include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel...\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-16T10:40:37+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-16T12:32:45+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Lahore-roads.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Foundation laid for two mega projects in Lahore\u00a0 - Zameen News","description":"The two mega projects in Lahore include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel...","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html","og_locale":"en_US","og_type":"article","og_title":"Foundation laid for two mega projects in Lahore\u00a0 - Zameen News","og_description":"The two mega projects in Lahore include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel...","og_url":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2023-01-16T10:40:37+00:00","article_modified_time":"2023-01-16T12:32:45+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Lahore-roads.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"Foundation stones laid for two mega projects in Lahore","datePublished":"2023-01-16T10:40:37+00:00","dateModified":"2023-01-16T12:32:45+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html"},"wordCount":238,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Lahore-roads.jpg","keywords":["Lahore mega prohects","Mega Projects Lahore","Sagian Road Project","Shahdra Multi Level project"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html","url":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html","name":"Foundation laid for two mega projects in Lahore\u00a0 - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Lahore-roads.jpg","datePublished":"2023-01-16T10:40:37+00:00","dateModified":"2023-01-16T12:32:45+00:00","description":"The two mega projects in Lahore include the rehabilitation and improvement of the Saggian Road Road project and the Shahdra Multilevel...","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Lahore-roads.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/02\/Lahore-roads.jpg","width":1170,"height":400,"caption":"DCIM100MEDIA"},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Foundation stones laid for two mega projects in Lahore"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91492","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=91492"}],"version-history":[{"count":4,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91492\/revisions"}],"predecessor-version":[{"id":91498,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91492\/revisions\/91498"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/61229"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=91492"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=91492"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=91492"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=91492"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}