{"id":91766,"date":"2023-01-26T16:42:45","date_gmt":"2023-01-26T11:42:45","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=91766"},"modified":"2023-01-26T16:43:18","modified_gmt":"2023-01-26T11:43:18","slug":"gulberg-elevated-expressway-master-plan","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html","title":{"rendered":"Gulberg Elevated Expressway made part of Lahore Master plan 2050"},"content":{"rendered":"\n<p>Lahore: The Punjab Government has included the Gulberg Elevated Expressway project in the Lahore Master Plan 2050, news sources reported on January 24.\u00a0<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/samanabad-underpass-early-completion.html\" target=\"_blank\" rel=\"noreferrer noopener\">Samanabad Underpass: CM Naqvi directs early completion<\/a><\/p>\n\n\n\n<p>The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2), bypassing Shadman, Samanabad, Ferozepur Road, and Gulshan Ravi. The four-lane track is expected to accommodate 73,866 vehicles per day. It will have six interchanges along its\u00a0<\/p>\n\n\n\n<p>The estimated cost of the project is PKR 85 billion and includes the acquisition of 801 kanals of private land worth PKR 3.5 billion, which will be handed over to the <a href=\"https:\/\/www.zameen.com\/news\/lda-tender-babu-sabu-interchange.html\" target=\"_blank\" rel=\"noreferrer noopener\">Lahore Development Authority (LDA)<\/a>. The final approval of the project is expected to be given by the federal government in the upcoming budget.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/cm-lahore-elevated-expressway-project.html\" target=\"_blank\" rel=\"noreferrer noopener\">CM Elahi greenlights Lahore Elevated Expressway project<\/a><\/p>\n\n\n\n<p>It is important to note that the project was approved in 2019 and was pitched as a viable project to reduce pollution in the city by reducing traffic congestion in the main city areas. The <a href=\"https:\/\/www.zameen.com\/news\/two-mega-projects-lahore.html\" target=\"_blank\" rel=\"noreferrer noopener\">Punjab government <\/a>conducted a feasibility study to evaluate the project and its potential benefits. The study concluded that the project was feasible and have a positive impact on the city&#8217;s infrastructure.\u00a0<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: The Punjab Government has included the Gulberg Elevated Expressway project in the Lahore Master Plan 2050, news sources reported on January 24.\u00a0 Read: Samanabad Underpass: CM Naqvi directs early completion The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2), bypassing Shadman, Samanabad, Ferozepur Road, and Gulshan Ravi. The four-lane track is expected to accommodate 73,866 vehicles per day. It will have six interchanges along its\u00a0 The estimated cost of the project is PKR 85 billion and includes the acquisition of 801 kanals of private land worth PKR 3.5 billion, which will be handed over to the Lahore Development Authority (LDA). The final approval of the project is expected to be given by the federal government in the upcoming budget. Read: CM Elahi greenlights Lahore Elevated Expressway project It is important to note that the project was approved in 2019 and was pitched as a viable project to reduce pollution in the city by reducing traffic congestion in the main city areas. The Punjab government conducted a feasibility study to evaluate the project and its potential benefits. The study concluded that the project was feasible and have a positive impact on the&hellip;<\/p>\n","protected":false},"author":84,"featured_media":62954,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[15013],"tags":[51033,51034,56061],"persona":[],"class_list":{"0":"post-91766","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-construction","8":"tag-elevated-expressway-project","9":"tag-gulberg-elevated-expressway","10":"tag-punjab-government-projects","11":"cat-15013-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Gulberg Expressway added in Master Plan- Zameen News<\/title>\n<meta name=\"description\" content=\"The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2),\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Gulberg Expressway added in Master Plan- Zameen News\" \/>\n<meta property=\"og:description\" content=\"The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2),\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2023-01-26T11:42:45+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-01-26T11:43:18+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Islamabad-expressway.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Nauman Ahmad\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Nauman Ahmad\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Gulberg Expressway added in Master Plan- Zameen News","description":"The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2),","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html","og_locale":"en_US","og_type":"article","og_title":"Gulberg Expressway added in Master Plan- Zameen News","og_description":"The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2),","og_url":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2023-01-26T11:42:45+00:00","article_modified_time":"2023-01-26T11:43:18+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Islamabad-expressway.jpg","type":"image\/jpeg"}],"author":"Nauman Ahmad","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Nauman Ahmad","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html"},"author":{"name":"Nauman Ahmad","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9"},"headline":"Gulberg Elevated Expressway made part of Lahore Master plan 2050","datePublished":"2023-01-26T11:42:45+00:00","dateModified":"2023-01-26T11:43:18+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html"},"wordCount":205,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Islamabad-expressway.jpg","keywords":["Elevated expressway project","Gulberg elevated expressway","Punjab government projects"],"articleSection":["Construction"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html","url":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html","name":"Gulberg Expressway added in Master Plan- Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Islamabad-expressway.jpg","datePublished":"2023-01-26T11:42:45+00:00","dateModified":"2023-01-26T11:43:18+00:00","description":"The 10.5-kilometre-long Gulberg Elevated Expressway track will connect Home Economics College in Gulberg with Lahore-Islamabad Motorway (M2),","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Islamabad-expressway.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2020\/03\/Islamabad-expressway.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/gulberg-elevated-expressway-master-plan.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"Gulberg Elevated Expressway made part of Lahore Master plan 2050"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/0ea33500845f59b56c53060ac1ef44a9","name":"Nauman Ahmad","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2021\/05\/Picture1-96x96.png","caption":"Nauman Ahmad"},"description":"Nauman Ahmad is an imaginative Pisces whose love for literature and nature is unparalleled. When he's not reading or hiking, he's sleeping and eating, which gives him plenty of energy for his next adventure.","sameAs":["https:\/\/www.zameen.com"],"url":"https:\/\/www.zameen.com\/news\/author\/nauman_ahmad"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91766","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/84"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=91766"}],"version-history":[{"count":3,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91766\/revisions"}],"predecessor-version":[{"id":91772,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/91766\/revisions\/91772"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/62954"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=91766"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=91766"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=91766"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=91766"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}