{"id":95950,"date":"2023-12-27T11:40:50","date_gmt":"2023-12-27T06:40:50","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=95950"},"modified":"2023-12-27T12:13:50","modified_gmt":"2023-12-27T07:13:50","slug":"punjab-cm-naqvi-inspects-sl-3s-progress","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html","title":{"rendered":"60% work completed on 8-km LRR SL-3 connecting Raiwind Road with Multan Road"},"content":{"rendered":"\n<p>Lahore: Punjab Chief Minister (CM) Mohsin Naqvi led a comprehensive evaluation of the Lahore Ring Road Southern Loop-3 (SL-3) project, which has achieved a substantial 60% completion milestone, as reported by a news source on December 27.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/walton-road-upgradation-is-in-the-focus.html\" target=\"_blank\" rel=\"noreferrer noopener\">CM Naqvi highlights magnitude of Cavalry Underpass, Walton Road upgradation project<\/a><\/p>\n\n\n\n<p>According to the details, the inspection occurred at Adda Plot Raiwind, where CM Naqvi personally assessed the ongoing progress. Covering an extensive 8 km stretch from Adda Plot Raiwind to Maraka Multan Road, the CM accurately examined the construction activities, specifically focusing on bridges.<\/p>\n\n\n\n<p>Directives were promptly issued by CM Naqvi for the expeditious conclusion of the project during a meeting at the FWO camp office, which was also attended by Colonel Jamal and Colonel Ahmed, providing an in-depth briefing on the project\u2019s advancement.<\/p>\n\n\n\n<p>The SL-3 project, valued at over PKR 17 billion, spans 8 km and features three lanes. CM Naqvi mentioned that the project, initially scheduled for a two-year timeline, is on track for completion in the upcoming months.<\/p>\n\n\n\n<p>Various aspects of the project were addressed during the meeting, emphasising the commitment to high standards in project execution. CM Naqvi highlighted the significance of the Lahore Ring Road Southern Loop-3 in enhancing public transportation facilities and expressed confidence in its timely completion.<\/p>\n\n\n\n<p><strong>Read:<\/strong> <a href=\"https:\/\/www.zameen.com\/news\/cm-naqvi-nods-favour-new-projects.html\" target=\"_blank\" rel=\"noreferrer noopener\">CM Naqvi greenlights ambitious road rehabilitation, expansion project in Punjab<\/a><\/p>\n\n\n\n<p>Addressing the media post-visit, CM Naqvi underscored the importance of the SL-3, Gujranwala Expressway, and Band Road projects. He assured relentless efforts to ensure their completion with the utmost quality, overcoming challenges, and maintaining an efficient round-the-clock work schedule.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: Punjab Chief Minister (CM) Mohsin Naqvi led a comprehensive evaluation of the Lahore Ring Road Southern Loop-3 (SL-3) project, which has achieved a substantial 60% completion milestone, as reported by a news source on December 27. Read: CM Naqvi highlights magnitude of Cavalry Underpass, Walton Road upgradation project According to the details, the inspection occurred at Adda Plot Raiwind, where CM Naqvi personally assessed the ongoing progress. Covering an extensive 8 km stretch from Adda Plot Raiwind to Maraka Multan Road, the CM accurately examined the construction activities, specifically focusing on bridges. Directives were promptly issued by CM Naqvi for the expeditious conclusion of the project during a meeting at the FWO camp office, which was also attended by Colonel Jamal and Colonel Ahmed, providing an in-depth briefing on the project\u2019s advancement. The SL-3 project, valued at over PKR 17 billion, spans 8 km and features three lanes. CM Naqvi mentioned that the project, initially scheduled for a two-year timeline, is on track for completion in the upcoming months. Various aspects of the project were addressed during the meeting, emphasising the commitment to high standards in project execution. CM Naqvi highlighted the significance of the Lahore Ring Road Southern&hellip;<\/p>\n","protected":false},"author":88,"featured_media":95952,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385,15017],"tags":[57783,15156,57294],"persona":[],"class_list":{"0":"post-95950","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"category-notices-announcements","9":"tag-mohsin-naqvi-news-and-updates","10":"tag-punjab-cm","11":"tag-ring-road-southern-loop-sl-3","12":"cat-20385-id","13":"cat-15017-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>Punjab CM Naqvi Inspects SL-3&#039;s Progress - Zameen News<\/title>\n<meta name=\"description\" content=\"Punjab CM Naqvi assesses Lahore Ring Road Southern Loop-3 (SL-3) project at 60% completion. Catch the details in the latest report.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Punjab CM Naqvi Inspects SL-3&#039;s Progress - Zameen News\" \/>\n<meta property=\"og:description\" content=\"Punjab CM Naqvi assesses Lahore Ring Road Southern Loop-3 (SL-3) project at 60% completion. Catch the details in the latest report.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2023-12-27T06:40:50+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-12-27T07:13:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/12\/FB-Cover-1200x628-1.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1200\" \/>\n\t<meta property=\"og:image:height\" content=\"628\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Muhammad Zohaib Nasir\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Zohaib Nasir\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"2 minutes\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Punjab CM Naqvi Inspects SL-3's Progress - Zameen News","description":"Punjab CM Naqvi assesses Lahore Ring Road Southern Loop-3 (SL-3) project at 60% completion. Catch the details in the latest report.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html","og_locale":"en_US","og_type":"article","og_title":"Punjab CM Naqvi Inspects SL-3's Progress - Zameen News","og_description":"Punjab CM Naqvi assesses Lahore Ring Road Southern Loop-3 (SL-3) project at 60% completion. Catch the details in the latest report.","og_url":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2023-12-27T06:40:50+00:00","article_modified_time":"2023-12-27T07:13:50+00:00","og_image":[{"width":1200,"height":628,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/12\/FB-Cover-1200x628-1.jpg","type":"image\/jpeg"}],"author":"Muhammad Zohaib Nasir","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Zohaib Nasir","Est. reading time":"2 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html"},"author":{"name":"Muhammad Zohaib Nasir","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/e52d08c48c8141ff2bf4db7bff52ddc6"},"headline":"60% work completed on 8-km LRR SL-3 connecting Raiwind Road with Multan Road","datePublished":"2023-12-27T06:40:50+00:00","dateModified":"2023-12-27T07:13:50+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html"},"wordCount":271,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/12\/LLR.jpg","keywords":["Mohsin Naqvi news and updates","Punjab CM","Ring Road Southern Loop (Sl-3)"],"articleSection":["Infrastructure","Notices &amp; Announcements"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html","url":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html","name":"Punjab CM Naqvi Inspects SL-3's Progress - Zameen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/12\/LLR.jpg","datePublished":"2023-12-27T06:40:50+00:00","dateModified":"2023-12-27T07:13:50+00:00","description":"Punjab CM Naqvi assesses Lahore Ring Road Southern Loop-3 (SL-3) project at 60% completion. Catch the details in the latest report.","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/12\/LLR.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/12\/LLR.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/punjab-cm-naqvi-inspects-sl-3s-progress.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"60% work completed on 8-km LRR SL-3 connecting Raiwind Road with Multan Road"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/e52d08c48c8141ff2bf4db7bff52ddc6","name":"Muhammad Zohaib Nasir","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/07\/WhatsApp-Image-2023-07-12-at-8.18.24-AM-96x96.jpeg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/07\/WhatsApp-Image-2023-07-12-at-8.18.24-AM-96x96.jpeg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/07\/WhatsApp-Image-2023-07-12-at-8.18.24-AM-96x96.jpeg","caption":"Muhammad Zohaib Nasir"},"description":"As a graduate in English Literature, Zohaib believes that words are not just a mere figment of imagination. It takes wisdom to be good at them. Following this reason, he is pursuing his career as Public Relations and Content Specialist at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/zohaib-nasir"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/95950","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/88"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=95950"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/95950\/revisions"}],"predecessor-version":[{"id":95951,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/95950\/revisions\/95951"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/95952"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=95950"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=95950"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=95950"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=95950"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}