{"id":96208,"date":"2024-01-24T13:46:32","date_gmt":"2024-01-24T08:46:32","guid":{"rendered":"https:\/\/www.zameen.com\/news\/?p=96208"},"modified":"2024-01-24T13:46:34","modified_gmt":"2024-01-24T08:46:34","slug":"cm-urged-swift-band-road-project-completion","status":"publish","type":"post","link":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html","title":{"rendered":"CM Naqvi drives forward Band Road Project in LHR"},"content":{"rendered":"\n<p>Lahore: Punjab Caretaker Chief Minister (CM) Mohsin Naqvi actively pushes for the timely completion of the &#8220;Controlled Access Corridor Band Road Project,&#8221; taking significant steps to oversee its progress, according to a news article on January 23.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/journalists-get-exclusive-offers-says-cm-naqvi.html\" target=\"_blank\" rel=\"noreferrer noopener\">CM Naqvi honours journalists with exclusive residential plots<\/a><\/p>\n\n\n\n<p>In a thorough inspection covering 8 kilometres, CM Naqvi evaluated the project\u2019s various locations, noting that 55% of Package 2 (Babu Sabu to Sagian) and 74% of Package One (Sagian to Niazi Chowk) have been successfully executed. During the inspection, he closely monitored the ongoing work on both Package Two and Package One, emphasising the need to expedite the construction process.<\/p>\n\n\n\n<p><strong>Read: <\/strong><a href=\"https:\/\/www.zameen.com\/news\/walton-road-upgradation-is-in-the-focus.html\" target=\"_blank\" rel=\"noreferrer noopener\">CM Naqvi highlights magnitude of Cavalry Underpass, Walton Road upgradation project<\/a><\/p>\n\n\n\n<p>Specifically, CM Naqvi directed an acceleration of progress in Package Two and urged the deployment of additional labour for a prompt completion. Expressing a clear directive, CM Naqvi instructed the completion of work on both packages by the first week of February, stressing the utilisation of all available resources to open the corridor for traffic.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Lahore: Punjab Caretaker Chief Minister (CM) Mohsin Naqvi actively pushes for the timely completion of the &#8220;Controlled Access Corridor Band Road Project,&#8221; taking significant steps to oversee its progress, according to a news article on January 23. Read: CM Naqvi honours journalists with exclusive residential plots In a thorough inspection covering 8 kilometres, CM Naqvi evaluated the project\u2019s various locations, noting that 55% of Package 2 (Babu Sabu to Sagian) and 74% of Package One (Sagian to Niazi Chowk) have been successfully executed. During the inspection, he closely monitored the ongoing work on both Package Two and Package One, emphasising the need to expedite the construction process. Read: CM Naqvi highlights magnitude of Cavalry Underpass, Walton Road upgradation project Specifically, CM Naqvi directed an acceleration of progress in Package Two and urged the deployment of additional labour for a prompt completion. Expressing a clear directive, CM Naqvi instructed the completion of work on both packages by the first week of February, stressing the utilisation of all available resources to open the corridor for traffic.<\/p>\n","protected":false},"author":88,"featured_media":95002,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[20385,15017],"tags":[55369,57464,8148],"persona":[],"class_list":{"0":"post-96208","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-development-projects","8":"category-notices-announcements","9":"tag-band-road-project","10":"tag-cm-naqvi","11":"tag-cm-punjab","12":"cat-20385-id","13":"cat-15017-id"},"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v27.2 - https:\/\/yoast.com\/product\/yoast-seo-wordpress\/ -->\n<title>CM Urged Swift Band Road Project Completion - ZamUrgeen News<\/title>\n<meta name=\"description\" content=\"CM Naqvi is proactively driving the on-time completion of the &quot;Controlled Access Corridor Band Road Project&quot;.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html\" \/>\n<meta property=\"og:locale\" content=\"en_US\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"CM Urged Swift Band Road Project Completion - ZamUrgeen News\" \/>\n<meta property=\"og:description\" content=\"CM Naqvi is proactively driving the on-time completion of the &quot;Controlled Access Corridor Band Road Project&quot;.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html\" \/>\n<meta property=\"og:site_name\" content=\"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/ZameenPK\" \/>\n<meta property=\"article:published_time\" content=\"2024-01-24T08:46:32+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2024-01-24T08:46:34+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/09\/CM-Naqvi.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1170\" \/>\n\t<meta property=\"og:image:height\" content=\"400\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Muhammad Zohaib Nasir\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:creator\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:site\" content=\"@ZameenProperty\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Muhammad Zohaib Nasir\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"1 minute\" \/>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"CM Urged Swift Band Road Project Completion - ZamUrgeen News","description":"CM Naqvi is proactively driving the on-time completion of the \"Controlled Access Corridor Band Road Project\".","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html","og_locale":"en_US","og_type":"article","og_title":"CM Urged Swift Band Road Project Completion - ZamUrgeen News","og_description":"CM Naqvi is proactively driving the on-time completion of the \"Controlled Access Corridor Band Road Project\".","og_url":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html","og_site_name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","article_publisher":"https:\/\/www.facebook.com\/ZameenPK","article_published_time":"2024-01-24T08:46:32+00:00","article_modified_time":"2024-01-24T08:46:34+00:00","og_image":[{"width":1170,"height":400,"url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/09\/CM-Naqvi.jpg","type":"image\/jpeg"}],"author":"Muhammad Zohaib Nasir","twitter_card":"summary_large_image","twitter_creator":"@ZameenProperty","twitter_site":"@ZameenProperty","twitter_misc":{"Written by":"Muhammad Zohaib Nasir","Est. reading time":"1 minute"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"NewsArticle","@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#article","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html"},"author":{"name":"Muhammad Zohaib Nasir","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/e52d08c48c8141ff2bf4db7bff52ddc6"},"headline":"CM Naqvi drives forward Band Road Project in LHR","datePublished":"2024-01-24T08:46:32+00:00","dateModified":"2024-01-24T08:46:34+00:00","mainEntityOfPage":{"@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html"},"wordCount":179,"commentCount":0,"publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"image":{"@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/09\/CM-Naqvi.jpg","keywords":["Band Road Project","CM Naqvi","CM Punjab"],"articleSection":["Infrastructure","Notices &amp; Announcements"],"inLanguage":"en-US","potentialAction":[{"@type":"CommentAction","name":"Comment","target":["https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#respond"]}]},{"@type":"WebPage","@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html","url":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html","name":"CM Urged Swift Band Road Project Completion - ZamUrgeen News","isPartOf":{"@id":"https:\/\/www.zameen.com\/news\/#website"},"primaryImageOfPage":{"@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#primaryimage"},"image":{"@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#primaryimage"},"thumbnailUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/09\/CM-Naqvi.jpg","datePublished":"2024-01-24T08:46:32+00:00","dateModified":"2024-01-24T08:46:34+00:00","description":"CM Naqvi is proactively driving the on-time completion of the \"Controlled Access Corridor Band Road Project\".","breadcrumb":{"@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#breadcrumb"},"inLanguage":"en-US","potentialAction":[{"@type":"ReadAction","target":["https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html"]}]},{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#primaryimage","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/09\/CM-Naqvi.jpg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/09\/CM-Naqvi.jpg","width":1170,"height":400},{"@type":"BreadcrumbList","@id":"https:\/\/www.zameen.com\/news\/cm-urged-swift-band-road-project-completion.html#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/www.zameen.com\/news"},{"@type":"ListItem","position":2,"name":"CM Naqvi drives forward Band Road Project in LHR"}]},{"@type":"WebSite","@id":"https:\/\/www.zameen.com\/news\/#website","url":"https:\/\/www.zameen.com\/news\/","name":"Pakistan Real Estate News &amp; Pakistan Property News &amp; Latest Updates - Zameen News","description":"","publisher":{"@id":"https:\/\/www.zameen.com\/news\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/www.zameen.com\/news\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"en-US"},{"@type":"Organization","@id":"https:\/\/www.zameen.com\/news\/#organization","name":"Zameen.com","alternateName":"Zameen","url":"https:\/\/www.zameen.com\/news\/","logo":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/","url":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/upload\/2015\/09\/Zameen.com_-_Logo.png","width":600,"height":300,"caption":"Zameen.com"},"image":{"@id":"https:\/\/www.zameen.com\/news\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.facebook.com\/ZameenPK","https:\/\/x.com\/ZameenProperty","https:\/\/www.instagram.com\/zameenpk\/"]},{"@type":"Person","@id":"https:\/\/www.zameen.com\/news\/#\/schema\/person\/e52d08c48c8141ff2bf4db7bff52ddc6","name":"Muhammad Zohaib Nasir","image":{"@type":"ImageObject","inLanguage":"en-US","@id":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/07\/WhatsApp-Image-2023-07-12-at-8.18.24-AM-96x96.jpeg","url":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/07\/WhatsApp-Image-2023-07-12-at-8.18.24-AM-96x96.jpeg","contentUrl":"https:\/\/news-cdn.zameen.com\/wp-content\/uploads\/2023\/07\/WhatsApp-Image-2023-07-12-at-8.18.24-AM-96x96.jpeg","caption":"Muhammad Zohaib Nasir"},"description":"As a graduate in English Literature, Zohaib believes that words are not just a mere figment of imagination. It takes wisdom to be good at them. Following this reason, he is pursuing his career as Public Relations and Content Specialist at Zameen.com.","url":"https:\/\/www.zameen.com\/news\/author\/zohaib-nasir"}]}},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/96208","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/users\/88"}],"replies":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/comments?post=96208"}],"version-history":[{"count":1,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/96208\/revisions"}],"predecessor-version":[{"id":96209,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/posts\/96208\/revisions\/96209"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media\/95002"}],"wp:attachment":[{"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/media?parent=96208"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/categories?post=96208"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/tags?post=96208"},{"taxonomy":"persona","embeddable":true,"href":"https:\/\/www.zameen.com\/news\/wp-json\/wp\/v2\/persona?post=96208"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}