Advertise
Search Options
Search
Ask Your Question 
Ask Now
Prop Guide

Property Guru
7338 posts
24 best
Nadeem Ahmed

Property Guru
4994 posts
19 best
Falcon

Property Guru
4737 posts
6 best
Pakistani-1

Property Guru
3031 posts
26 best
Abdul Qayyum

Property Guru
2622 posts
9 best
Nasir

Property Guru
2515 posts
21 best
Imtiaz

Property Guru
2325 posts
15 best
Khalid Javai

Property Guru
2017 posts
0 best
Sayeein

Property Guru
1868 posts
0 best
Sheikh Abdul

Property Guru
1753 posts
16 best
Baber Rabban

Property Guru
1716 posts
16 best
Isloo

Property Guru
1529 posts
3 best
Dsa

Expert Authority
1487 posts
2 best
Syed Ibrhaim

Expert Authority
1437 posts
17 best
Arshad

Expert Authority
1189 posts
1 best
Pardesi

Expert Authority
1172 posts
8 best
Mbs

Expert Authority
1157 posts
13 best
Ace Property

Expert Authority
1114 posts
9 best
Irfan

Expert Authority
1112 posts
8 best
Real Estate

Expert Authority
1052 posts
3 best
Become an expert on the forum, check Forum Ranks.
Building Contractors questions and answers. All your Building Contractors questions answered by our experts and thousands of other members. Get professional Building Contractors answers to your questions. Get started by asking a new Building Contractors question now.
Mo Afzal
( 2 posts )

[14 Answers]
Could you please provide best estimate of 8 marla plaza construction cost. Basement + 3 floors. Area 1800 sq feet per floor. Need estimate of a and a+ construction for grey structure as well as for finishing cost. Please also provide estimate of naqsha and any other costs.

    553 days ago In Building Contractors
    Post Reply
    A M Abbasi
    (318 posts)
    Construction cost of plaza depends upon the various factors. Mainly based on the structural design and which society you are making.Please let me know the exact location then i can tell you the construction cost. I think the total covered area will be around 7000 Sqft. And a good contractor will charge you from 2400 per sqft onwards. So with 7000*2400=16800000 amount you should keep in mind it can be less as well depending upon the area and structural design(if less steel is used). However there are companies who charge 10 to 15% on total cost of construction and tries to minimize the cost and avoid the conflict.That option can also be considered.
      552 days ago 

      Mo Afzal
      (2 posts)
      Thank you Mr. Abbasi for the reply. Is 2400 per sq ft cost for grey structure only? Need construction in Bahria town area.
        552 days ago 

        Home Constru..
        (335 posts)
        This post has been removed under Section 1 of the Forum Rules.

        For the full set of Forum Rules and Posting Guidelines on Zameen Forum, kindly check here: https://www.zameen.com/forum/discussions/other_and_misc/forum_rules_and_posting_guidelines-32219.html

        --Zameen Admin
          552 days ago 

          A M Abbasi
          (318 posts)
          Mo Afzal , Well i have recently started one Comercial unit in bahria town. Which city if BT because in BT Rawalpindi it is basement+Ground+ 3 floor not as you explained earlier. Which will increase your cost of construction. Plus in BT more steel is used ur cost will increase further and if it is 8 marla then they must be adding the lift which will further increase your cost. I believe your cost will be around 2600sqft and above this is final cost i am talking about not the grey structure.But the final proposal can only be given if we have the MAP and structural design.
            551 days ago 

            Syed Waqar Y..
            (1 post)
            This post has been removed under Section 1 of the Forum Rules.

            For the full set of Forum Rules and Posting Guidelines on Zameen Forum, kindly check here: https://www.zameen.com/forum/discussions/other_and_misc/forum_rules_and_posting_guidelines-32219.html

            --Zameen Admin
              551 days ago 

              Danish Broth..
              (234 posts)
              Suppose covered area =7000 sft, The cost break down will be as follows:



              Cost of materials for grey structure:Rs.6.3 Million

              Cost of labour for grey structure =Rs.2.1 Million

              Total cost for grey structure =Rs.84Lac.



              Cost of materials (Structure+ average priced finishing materials= Rs.10.5 Million

              Labour cost for complete finish= Rs.2.8Million

              Total cost (structure+ finishing) = Rs.133 Lac.

              Please note this is estimated cost excluding contractor's profit
                551 days ago 

                A M Abbasi
                (318 posts)
                @danish I need to understand that how you have calculated the cost of material for grey structure as 6.3 million for 7000sft covered area plaza.

                In bahria only steel used for 7000sft plaza (almost 5 marla) is around 65 to 75 ton grade 60. If we take average cost of steel which is 107000 per ton then only steel cost will be 65*107000=6955000. Now Add Rait ,bajri, cement, bricks and other small cost.



                Danish you must be talking about the house construction not the plaza construction.



                If you have piling then the material cost is much more.
                  550 days ago 

                  Abdul Wahab
                  (196 posts)
                  Hello A M Abbasi

                  You are telling on very high side. If you use around 70 tons steel in 7000sft commercial building, than your structure design is not good. You need to wet it.

                  in 7000sft commercial building on a normal plot steel use around 30 to 40 tons in Rawalpindi and Isalamabd. In Lahore steel require for 7000sft commercial building under 22 tons on a normal plot.



                  For more info you can contact me.



                  Regards

                  Ar. Wahab

                  Arch Five Architects
                    550 days ago 

                    A M Abbasi
                    (318 posts)
                    Abdul Wahab,



                    This is my practical knowledge in Bahria Rawalpindi. Have you seen the approved structural design of the any commercial plot with piling in Bahria? Just to elaborate in technical terms so that you have better idea Under ground Water tank and sump tank bahria approved steel structure has 2 foot bed , 1.5 ft retaining walls. Bed of the plaza is 2 foot and then add steel to the retaining walls. This only calculation will give you the 18 or 19 ton or probably more.

                    My first plaza which i build in bahria was in 2013 and that time BT rules were little bit relaxed at that time my Steel was 50 ton. Now they have further inhance the strength of the structural design.The least i got from the steel structure for 5 marla basement+ground+3 story + Mumty and overhead tank is 60 ton that is also without piling.

                    In bahria steel usage is extra and unnecessary however bahria don't approve structural design until it is like that however the rental income is fairly reasonable with good environment
                      549 days ago 

                      Abdul Wahab
                      (196 posts)
                      A M Abbasi

                      I am qualified architect and working in Bahria and DHA. If one has knowledge of structures like architects they question to the engineers to give rational of each bar of steel.

                      Steel depends on the soil test report, mostly people save money of soil test and get fake reports. In which they mention the under value bearing capacity, Structure engineer follow the report and if no one to argue him he design the steel on a safer side, and use extra steel, not giving time to make it cost effective structure because he is just designing the steel.



                      In short you must hire qualified and knowledge able architect who will design the layout which is cost effective and than he can advice you on each stage to make the building cost effective and user friendly.

                      Persons who don't hire architects, compromise on authentic soil test report to save money, in reality wasting of money during construction.



                      Every plaza structure design need wetting of steel from another engineer to take other point of view, but in market people dont ponder on it.



                      For any info or any drawing wetting (checking of steel) you can contact me or visit my office.



                      Regards,

                      Ar. Wahab

                      Arch Five Architects
                        546 days ago 