Advertise
Search Options
Search
Ask Your Question 
Ask Now
Prop Guide

Property Guru
7340 posts
24 best
Nadeem Ahmed

Property Guru
4794 posts
18 best
Falcon

Property Guru
4705 posts
6 best
Pakistani-1

Property Guru
3031 posts
26 best
Nasir

Property Guru
2515 posts
21 best
Abdul Qayyum

Property Guru
2113 posts
4 best
Khalid Javai

Property Guru
1877 posts
0 best
Sayeein

Property Guru
1868 posts
0 best
Sheikh Abdul

Property Guru
1753 posts
16 best
Baber Rabban

Property Guru
1716 posts
16 best
Imtiaz

Property Guru
1591 posts
8 best
Isloo

Property Guru
1529 posts
3 best
Dsa

Expert Authority
1457 posts
2 best
Syed Ibrhaim

Expert Authority
1439 posts
17 best
Arshad

Expert Authority
1189 posts
1 best
Pardesi

Expert Authority
1172 posts
8 best
Mbs

Expert Authority
1157 posts
13 best
Ht

Expert Authority
1114 posts
9 best
Irfan

Expert Authority
1112 posts
8 best
Real Estate

Expert Authority
1052 posts
3 best
Become an expert on the forum, check Forum Ranks.
Construction Cost questions and answers. All your Construction Cost questions answered by our experts and thousands of other members. Get professional Construction Cost answers to your questions. Get started by asking a new Construction Cost question now.
Awais Malik
( 1 post )

[3 Answers]
Aoa.
I am planning to construct a 7 marla double story house in umer block bahria phase 8.
Map is under process
Land is solid
Some details of the map are under.
Ground floor, 2x rooms with attach bath, drawing room,kitchen, tv lounge, car porch, a small garden at the side of car porch where 2 chairs can easily place.
1st floor, 3x rooms with attach bath, drawing room, kitchen, tv lounge.
1 servent room at mumttee.

Need an expert opinion about the details of construction cost.

'a' class grey structure cost and finishing cost?
Your answer will be highly appreciated

    16 days ago In Construction Cost
    Post Answer
    Muhammad Has..
    (4 posts)
    Aoa brother

    Construction cost of "A" class grey structure is about RS.1300 to RS 1600 per sqft

    An complete construction rate with material range from RS 2600 sqft to RS 4500 sqft

    As your plot is in umer block it's 30x55 I believe

    Covered area will be 1500 approximately

    Simply multiply these figures for an estimate amount of construction.

    Contact us if you have any quires .we are always here to help people out .

    Regards

    Muhammad Hassan Abbas

    Pride Engineering Co Pvt LTD

    0308-8914033
      13 days ago 

      Hamza Akram
      (4 posts)
      A.o.A

      i am currently working on a project in Bahria town phase 8

      material cost for Grey structure is around 1600 sft With material

      which include Ithaad steel bestway cement A class Bricks Master Fittings for water plumbing ..Master (blue) not (master fit)

      accua fit electric condute pipes



      Finishing cost is around 2500 to 3000 sft

      its rate depends on type of wood and tile work mostly



      Muhammad Hamza

      03318168154
        3 days ago 

        Hassan ulhaq
        (2 posts)
        Greetings,

        Oriental business house (pvt) ltd is a construction and other 360 services based company that specializes in trading and construction of residential as well as commercial properties.

        We would be 24/7 ready and glad to help you in constructing your house within record breaking times!



        estimates of grey structure / furnished houses can vary from quality to quality and from time to time due to which providing an accurate estimate can be quite challenging!



        However a rough estimate for grey structure can vary from 1150PKR to 1700PKR , whereas the cost of a finished house can vary from 2400PKR to around 4250PKR and the time to construct it may vary from 6 months to a year depending upon how you decide to schedule the payments!



        Basements are slightly expensive due to which that costs add up separately but as you are not planning on constructing a basement that must not be a problem for you







        one of our projects is under construction in gulberg greens these days and has reached to 70% completion (second floor lintel) within 5 months besides the covid-19 situation that caused a lockdown and a delay in time



        you can always contact us at my personal mobile number i.e +923365051799



        we can also set an appointment to meet in which we can give you a tour of our projects etc!
          1 day ago 

          Post Answer (3 Answers)
          Answer the Question
           
          Username:
          Password:
          Email Basket (0)
          SEND EMAIL   REMOVE ALL