Advertise
Search Options
Search
Ask Your Question 
Ask Now
Prop Guide

Property Guru
7340 posts
24 best
Nadeem Ahmed

Property Guru
4785 posts
18 best
Falcon

Property Guru
4699 posts
6 best
Pakistani-1

Property Guru
3031 posts
26 best
Nasir

Property Guru
2515 posts
21 best
Abdul Qayyum

Property Guru
2074 posts
4 best
Sayeein

Property Guru
1868 posts
0 best
Khalid Javai

Property Guru
1795 posts
0 best
Sheikh Abdul

Property Guru
1753 posts
16 best
Baber Rabban

Property Guru
1716 posts
16 best
Isloo

Property Guru
1529 posts
3 best
Dsa

Expert Authority
1449 posts
2 best
Syed Ibrhaim

Expert Authority
1439 posts
17 best
Imtiaz

Expert Authority
1346 posts
7 best
Arshad

Expert Authority
1189 posts
1 best
Pardesi

Expert Authority
1172 posts
8 best
Mbs

Expert Authority
1157 posts
13 best
Ht

Expert Authority
1115 posts
9 best
Irfan

Expert Authority
1112 posts
8 best
Real Estate

Expert Authority
1052 posts
3 best
Become an expert on the forum, check Forum Ranks.
Security & Advance questions and answers. All your Security & Advance questions answered by our experts and thousands of other members. Get professional Security & Advance answers to your questions. Get started by asking a new Security & Advance question now.
Sajjad Ahmed..
( 1 post )

[2 Answers]
Salam,

Dear all can anyone help me in estimation of grey structure of a 10 marla double story house which includes

1) cement
2) bricks
3) labor
4) sarya
5) any thing else related to grey structure.

I wanted to know how much money i must have in my pocket to at least complete the grey structure.
Will be really thankful for your kind responses.

    1134 days ago In Security & Advance
    Post Reply
    HT
    (1115 posts)
    BRICKS 55,000



    CEMENT 650



    STEEL 4 to 6.5 tons



    SAND 2-3 trucks



    CRUSH 3-4 trucks



    Plastering sand 1.5 to 2 trucks.







    A normal truck has between 850 to 900 cubic feet of sand/crush.



    This above estimate is based on a general 10 marla plot construction.



    These estimates are above DPC level as ground realities can only be estimated upon visit.



    Above estimate includes pillars and beams.



    Steel estimated can increase depending on how the architect has designed and what gauge of steel you will use. (60 gauge or 40 gauge)



    Plaster sand and cement will depend on the total area of the walls and the condition of brick laying. Normal it is between 80 to 100 sqft per cement bag.



    Between 200 to 250 bags of cement for plastering.







    I hope this will help you in making your budget.



    If you need further help do let me know.
      1134 days ago 

      Khan
      (100 posts)
      HT sab very thnx for this post.this post is very helpful for me.i want to construct a 8 marla double story house in bahria enclave with two beds drawing dining and lounge in down and same in uper story.i dont know how much will be total covered area.i think you know batter than me how much covered area can be in bahria enclave.plz give me estimate how much material will be used in this house of 30x60.
        1126 days ago 

        Post Answer (2 Answers)
        Email Basket (0)
        SEND EMAIL   REMOVE ALL