Advertise
Search Options
Search
Ask Your Question 
Ask Now
Prop Guide

Property Guru
7338 posts
24 best
Nadeem Ahmed

Property Guru
4983 posts
19 best
Falcon

Property Guru
4737 posts
6 best
Pakistani-1

Property Guru
3031 posts
26 best
Abdul Qayyum

Property Guru
2614 posts
9 best
Nasir

Property Guru
2515 posts
21 best
Imtiaz

Property Guru
2317 posts
15 best
Khalid Javai

Property Guru
2017 posts
0 best
Sayeein

Property Guru
1868 posts
0 best
Sheikh Abdul

Property Guru
1753 posts
16 best
Baber Rabban

Property Guru
1716 posts
16 best
Isloo

Property Guru
1529 posts
3 best
Dsa

Expert Authority
1487 posts
2 best
Syed Ibrhaim

Expert Authority
1437 posts
17 best
Arshad

Expert Authority
1189 posts
1 best
Pardesi

Expert Authority
1172 posts
8 best
Mbs

Expert Authority
1157 posts
13 best
Ace Property

Expert Authority
1114 posts
9 best
Irfan

Expert Authority
1112 posts
8 best
Real Estate

Expert Authority
1052 posts
3 best
Become an expert on the forum, check Forum Ranks.
Other Building Materials questions and answers. All your Other Building Materials questions answered by our experts and thousands of other members. Get professional Other Building Materials answers to your questions. Get started by asking a new Other Building Materials question now.
Muhammad Rah..
( 1 post )

[4 Answers]
Aoa.

Dear sir,

I want to consdtruct 7 marla house in bahria town phase 8.

Double story with basement.

2 rooms and kitchen in ground floor

3 rooms in 2nd floor.

2 rooms in basement floor.

Grade "A" construction.

What will be the estimated cost.?

    541 days ago In Other Building Materials
    Post Reply
    DSA
    (1486 posts)
    This post has been removed under Section 1 of the Forum Rules.

    For the full set of Forum Rules and Posting Guidelines on Zameen Forum, kindly check here: https://www.zameen.com/forum/discussions/other_and_misc/forum_rules_and_posting_guidelines-32219.html

    --Zameen Admin
      541 days ago 

      Abdul Wahab
      (196 posts)
      This post has been removed under Section 1 of the Forum Rules.

      For the full set of Forum Rules and Posting Guidelines on Zameen Forum, kindly check here: https://www.zameen.com/forum/discussions/other_and_misc/forum_rules_and_posting_guidelines-32219.html

      --Zameen Admin
        540 days ago 

        Danish Broth..
        (234 posts)
        The best way to know estimated cost is to calculate quantities & cost of materials by yourself or do so by hiring a professional. However in the absence of drawings , below i estimated cost of your house, supposing covered area is 3000sft.



        A class structure @ Rs.1500/sft = Rs.45 Lac

        A class finishing @Rs.1200/sft = Rs.36Lac

        Again it is stated that for exact estimate structural drawings are required.

        Danish Brothers

        Engineer& contractor
          540 days ago 

          A M Abbasi
          (318 posts)
          The clear estimate can only be done by using the drawings however you can think of the cost around the 85 to 90 lac.... With basement
            540 days ago 

            Post Answer (4 Answers)
            Email Basket (0)
            SEND EMAIL   REMOVE ALL